Not a "trudge" for me. I enjoy that walk.
Me too -but it ages since I did it. Sorry to get OT but reminds me of walking between Tyndrum Upper and Lower in the 1980s when I was doing Class 37 'orlidge.
Not a "trudge" for me. I enjoy that walk.
Not a "trudge" for me. I enjoy that walk.
According to STV news tonight, Scotrail are hoping to start electric services between Queen Street High level and Edinburgh in May, two months earlier than previously announced but six months later than originally planned. Unfortunately I can't find the article on their (extremely poor) website.
According to STV news tonight, Scotrail are hoping to start electric services between Queen Street High level and Edinburgh in May, two months earlier than previously announced but six months later than originally planned. Unfortunately I can't find the article on their (extremely poor) website.
That means it will be energised soon to allow for de-snagging and driver training?
Will Stirling, Dunblane, Alloa follow on straight away?
Isn't the Edinburgh - Ayr a positioning move to get 380s over to North Berwick? It'll not be needed when the 385s arrive surely?
However it would seem that in general the overall Scottish Electrification programme is actually progressing faster than expected. Shotts line was not originally scheduled to be complete until December 2019 but the latest announcements have stated March 2019 as the opening date:
http://www.railway-technology.com/n...ween-holytown-and-midcalder-junctions-5716351
I don't think they'd be bringing forward dates on one scheme while delaying another so my expectation would be that Stirling / Dunblane / Alloa is all on track for completion by December 2018 as planned.
As ever, the good news doesn't make the headlines! If they get ahead of programme (and I have been amazed at how quickly Paisley Canal and Whiflett went) where does that leave the rolling stock situation? Assuming the 385s can't be brought forward could Scotrail dip into the pool of 321s again (I believe another three are coming) or would they continue with diesel under new wires? I suspect it would be largely down to the contractual situation with existing leases although the demand for EMUs down south may force a change.
Remember that originally EGIP electrification was scheduled for December 2016, way before the 385s arrived. It was always planned to operate the service with 380s in the meantime.
Not sure Stirling electrification for Dec 18 is achievable.
Not sure Stirling electrification for Dec 18 is achievable. Story in the local stirling paper that Network Rail will have to rebuild Kerse Road bridge after all despite track lowering being carried out as part of the works at Stirling in 2014. Estimated for a years (road) closure with the outline planning application only just going in.
I don't see structures work being the main critical path issue. Kerse Road and Perth Road, Dunblane are the 2 additional rebuilds and the programmed dates - May 2017 to May 2018 leave plenty of time for contingency and wiring.
The issue is more with piling and wiring which was due to finish on EGIP and move on to Stirling. Will the late start impact on the Dec 2018 date? Maybe. Maybe not.
The bulk of piling has been completed from Cumbernauld to Greenhill Lower and is in the process of getting masts and eventual wiring.
Will carry on North from there to both Falkirk and Polmont then to Stirling, Dunblane and Alloa.
All coming along nicely.
the wee free bus is a slow and ineffective way to get between the two stations
Not sure Stirling electrification for Dec 18 is achievable. Story in the local stirling paper that Network Rail will have to rebuild Kerse Road bridge after all despite track lowering being carried out as part of the works at Stirling in 2014. Estimated for a years (road) closure with the outline planning application only just going in.
That's an encouraging cost of roughly £650K per stkm, much like the figure offered in the 2009 electrification RUS.
It's good that we are back to an acceptable cost for standard electrification.
The Shotts line is about as simple a line to wire as you could get, being just a double track route between two already-wired areas.
It's also a very long time since NR awarded a wiring contract.
We're still waiting for something similar for the outstanding phases of the NW electrification work.
Hopefully it's a sign that routine rollouts can continue without emptying the coffers before completion.
Just on this, the contract with Carillion does not include immunisation of the S&T as that is being done by a separate signalling renewal project.
You said all that back in November when you were claiming Stirling station was getting wired at Christmas so am taking anything you post with a hopper full of salt.
You really should get out more.
Are you trying to tell me that the masts erected at Greenhill Lower were done by pokemon.
Trying talking some sense for a change. You really could get a job with the Scotsman.
It's a long shot but here goes. I'm an overhead linesman with 14 years experience under my belt. I've worked on low and high voltage, wood poles and towers. I'm hoping to transfer my skills over to the overheads on the rail network. It's obviously a bit different and I'm not sure what tickets I would have to start with. Could any kind gentlemen point me in the right direction of companies that might take on people in my position or who might train people up? I live in the Glasgow area and it looks like there's a lot of work going on just now. Thanks in advance for any info.
Welcome to the forum. I hope you get the help you need
It might be worth posting your query in this sub forum:
http://www.railforums.co.uk/forumdisplay.php?f=122
It's a long shot but here goes. I'm an overhead linesman with 14 years experience under my belt. I've worked on low and high voltage, wood poles and towers. I'm hoping to transfer my skills over to the overheads on the rail network. It's obviously a bit different and I'm not sure what tickets I would have to start with. Could any kind gentlemen point me in the right direction of companies that might take on people in my position or who might train people up? I live in the Glasgow area and it looks like there's a lot of work going on just now. Thanks in advance for any info.