It is government-controlled and funded? Their schedule shows new trams to be introduced sometime this year on the tram network only. Full integration into the Heavy rail network is not scheduled to commence until mid 2018.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Harpers Tate

Established Member
Joined
10 May 2013
Messages
2,045
There isn't the money to get the 25kV feeder equipment in place......
...but there is the money to design, approve and install bespoke dual-voltage catenary gear - and in energising it initially at 750vDC, actually fail to offer to prove what may (elsewhere) become a significant element of the tram-train concept.
 

eastwestdivide

Established Member
Joined
17 Aug 2009
Messages
3,407
Location
S Yorks, usually
Do we actually know what the delay is in getting the delivered tram-trains running on the existing tram network? Problem with the trams, problem with the infrastructure or a combination?
 

TC60054

Member
Joined
3 Mar 2016
Messages
595
Location
Doncaster
It is government-controlled and funded? Their schedule shows new trams to be introduced sometime this year on the tram network only. Full integration into the Heavy rail network is not scheduled to commence until mid 2018.

That's the current plan as it stands.

Do we actually know what the delay is in getting the delivered tram-trains running on the existing tram network? Problem with the trams, problem with the infrastructure or a combination?

Issues with the vehicles have been prevalent since day one of testing - notably though the first testing setback was an infrastructure issue. Commissioning is due to start imminently.
 

eastwestdivide

Established Member
Joined
17 Aug 2009
Messages
3,407
Location
S Yorks, usually
...
Issues with the vehicles have been prevalent since day one of testing - notably though the first testing setback was an infrastructure issue. Commissioning is due to start imminently.

Any particular issues? There's not a lot published on progress so far.
 

TC60054

Member
Joined
3 Mar 2016
Messages
595
Location
Doncaster
Any particular issues? There's not a lot published on progress so far.

Two of the most known about issues are the weak couplings (which caused two crashes during testing, one substantially more severe than the other), and the current issue with something to do with the windscreens.
 

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
They were going to change out the glass in all the windscreens because in one of the previous minor bump incidents it had shattered if I remember right.
 

TC60054

Member
Joined
3 Mar 2016
Messages
595
Location
Doncaster
They were going to change out the glass in all the windscreens because in one of the previous minor bump incidents it had shattered if I remember right.

That sounds pretty much spot on the money. Something to do with them not being strong enough in the event of an accident (not like that needs to be tested any further :lol: )
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,644
Location
Nottingham
There isn't the money to get the 25kV feeder equipment in place. Especially seeing as progress with the Midland electrification programme has long been lacking.

As I understand it the Midland electrification even when complete doesn't go beyond Sheffield station. A 25kV feeder is an expensive beast, requires a heavy-duty grid connection and you really need two of them to provide backup for failure of the equipment or the supply. All of this would be a huge cost for a small section of 25kV. Hence the idea of electrifying the NR section at 750V, which can be fed at one end from Supertram and from the other by a new substation which I believe is relocateable.

It's quite likely that 25kV will come to Rotherham during the 30-year lifetime of the tram-trains, at which point the substation can be taken away for use elsewhere and (in theory at least) the OLE can be energised at 25kV with the minimum of work.
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
surely it would have been quicker, and a better and more complete pilot, to have "simply" erected 25kvAC masts and used that voltage from day 1 (or 1001 depending on your point of view).

There isn't the money to get the 25kV feeder equipment in place. Especially seeing as progress with the Midland electrification programme has long been lacking.

Also it has been suggested relatively recently that some of the bridges would require rebuilding for 25kV clearance.

--- old post above --- --- new post below ---

It's quite likely that 25kV will come to Rotherham during the 30-year lifetime of the tram-trains, at which point the substation can be taken away for use elsewhere and (in theory at least) the OLE can be energised at 25kV with the minimum of work.
Before Hendy (BH?) it was more or less confirmed that electrification would follow on to Doncaster and to the junction with the Doncaster-Leeds line at Moorthorpe.
 
Last edited:

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,175
Also it has been suggested relatively recently that some of the bridges would require rebuilding for 25kV clearance.

Yep, I can understand that.

Before Hendy (BH?) it was more or less confirmed that electrification would follow on to Doncaster and to the junction with the Doncaster-Leeds line at Moorthorpe.

Pity that it's not being done in time, a line like this would have been ideal to soak up a few of the soon to be off-lease Class 321s.
 

61653 HTAFC

Veteran Member
Joined
18 Dec 2012
Messages
19,351
Location
Yorkshire
If the problem is with providing equipment compatible with both AC and DC electrification, would it be easier to wire Sheffield to Moorthorpe at the DC voltage (when it eventually happens) and modify a sub-fleet of 319s to run at both voltages on OHLE? Changeover could then be done during the station stop at Moorthorpe.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,644
Location
Nottingham
If the problem is with providing equipment compatible with both AC and DC electrification, would it be easier to wire Sheffield to Moorthorpe at the DC voltage (when it eventually happens) and modify a sub-fleet of 319s to run at both voltages on OHLE? Changeover could then be done during the station stop at Moorthorpe.

The problem appears to be getting NR to approve DC OLE above its own infrastructure. Introducing it over a wider area certainly wouldn't help and would severely limit flexibility at some time in the future when there was a need to run longer-distance electric trains.
 

DimTim

Member
Joined
11 Aug 2013
Messages
194
Do we not have 1500dc at Sunderland?
Can we not tap into that experience?

College Rd bridge adjacent Rotherham station prevents 25kv - track cannot be lowered as susceptible to flooding.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,644
Location
Nottingham
Do we not have 1500dc at Sunderland?
Can we not tap into that experience?

College Rd bridge adjacent Rotherham station prevents 25kv - track cannot be lowered as susceptible to flooding.

Yes we have 1500V at Sunderland and (pre-Hendy at least) it was going to be a real headache with 25kV spreading round the region. One reason Nexus proposes to include 25kV capability on the replacement stock.

Clearly a bridge re-building for 25kV isn't necessary in the tram-train scheme. If and when the line needs converting for 25kV the bridge will have to be re-built and the OLE adjusted in this area, but the use of 25kV components minimises the amount of work needed to convert the rest of the route. It should also reduce the problem of getting NR approval for non-standard components.
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
The pre-war Altrincham and 1950s Glossop/Hadfield 1500V DC electrification were converted to 25kV with much less trouble, so far as I know, and the Altrincham was later converted back to 750V DC!

The insulators must have been replaced when the voltage was increased, but other than that I think a lot of stuff was retained at both conversions.
 
Last edited:

po8crg

Member
Joined
6 Feb 2014
Messages
559
The pre-war Altrincham and 1950s Glossop/Hadfield 1500V DC electrification were converted to 25kV with much less trouble, so far as I know, and the Altrincham was later converted back to 750V DC!

I don't think the conversion itself is the problem, it's that you either have to have heavy-rail trains or metrocars that can use both 1500V and 25kV. Dual-voltage on heavy rail isn't going to happen, but the current single-voltage metrocars mean that nothing can be done to electrify Sunderland until they're replaced.

Post-Hendy, that's not a problem, as the timescales for NR electrification have headed off into the sunset.
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
I don't think the conversion itself is the problem, it's that you either have to have heavy-rail trains or metrocars that can use both 1500V and 25kV. Dual-voltage on heavy rail isn't going to happen, but the current single-voltage metrocars mean that nothing can be done to electrify Sunderland until they're replaced.

Post-Hendy, that's not a problem, as the timescales for NR electrification have headed off into the sunset.

I was not referring to Tyne and Wear. I was comparing the difficulties that NR is claiming for the Sheffield/Rotherham project (which the thread is about) to what previously happened around Manchester.
 

TC60054

Member
Joined
3 Mar 2016
Messages
595
Location
Doncaster
399206 made a trip down to Halfway overnight, I believe this is one of it's first times out on the network.
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,175
399206 made a trip down to Halfway overnight, I believe this is one of it's first times out on the network.

What time was that then? I really need to keep my curtains open :D
 

TC60054

Member
Joined
3 Mar 2016
Messages
595
Location
Doncaster
What time was that then? I really need to keep my curtains open :D

Returned inbound at about 0400 :roll: I've got a feeling it was primarily used to make sure that the overheads were free of any ice / frost that'd cause any issues for service.
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,175
Returned inbound at about 0400 :roll: I've got a feeling it was primarily used to make sure that the overheads were free of any ice / frost that'd cause any issues for service.

Oh right, so being used as a mule then. Chances are I might have been awake then as my sleeping pattern is very much off-kilter!
 

TC60054

Member
Joined
3 Mar 2016
Messages
595
Location
Doncaster
Delays to service between Birley and Halfway this morning due to a tram failing at Hackenthorpe. I assume it's a 399 on an overnight test run, seeing as though it happened at 0500 and the first service tram leaves depot at 0520!
 

TC60054

Member
Joined
3 Mar 2016
Messages
595
Location
Doncaster
Delays to service between Birley and Halfway this morning due to a tram failing at Hackenthorpe. I assume it's a 399 on an overnight test run, seeing as though it happened at 0500 and the first service tram leaves depot at 0520!

Well and truly broken and definitely a 399 - tram now been assisted to Halfway where it has been abandoned..!
 

TC60054

Member
Joined
3 Mar 2016
Messages
595
Location
Doncaster
Posters now up at tram stops in Sheffield mentioning that the 399s are out on test and are not for public service. I assume this means we're getting close to seeing them out on the network during the day now.
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,175
399201 has become the first to run on the network during daylight, under its own power today.

Do you know if that was the unit running last night? I came across a tram passing through Granville Road at about 2.30am, with the front/rear destination screens set to blue.
 

button_boxer

Established Member
Joined
12 Nov 2009
Messages
1,271
My first view of one of the new vehicles, at Hillsborough this morning. Not the best image, it's a crop of one taken on my phone from a fair distance away, just before another tram blocked the view...
 

Attachments

  • FullSizeRender.jpg
    FullSizeRender.jpg
    121.2 KB · Views: 102
Status
Not open for further replies.

Top