Is there anywhere in the country you could reopen a 4 track railway. Im guessing probably not as places that needed 4 track have probably not been closed only reduced from 4 to 2.
In preservation you have 2 track railway on the Great Central (which also has loops at Swithland but not long enough to call it 4 track)
Just wondered if there was anywhere it could be done ?
In preservation you have 2 track railway on the Great Central (which also has loops at Swithland but not long enough to call it 4 track)
Just wondered if there was anywhere it could be done ?
