The future of Class 315 units?

Status
Not open for further replies.

Andrew1395

Member
Joined
30 Sep 2014
Messages
666
Location
Bushey
Stick a 315 on the St Albans Abbey branch. I am surprised no one has suggested sticking a diesel generator on them and sending them "up norf"
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
30,950
Location
UK
Can't you take the coach with the pantograph and insert it within a 442 somewhere? Now you've got the ultimate go anywhere train to last another 50 years.
 

najaB

Veteran Member
Joined
28 Aug 2011
Messages
33,734
Location
Scotland
Can't you take the coach with the pantograph and insert it within a 442 somewhere? Now you've got the ultimate go anywhere train to last another 50 years.
That idea is like farting in an lift - wrong on so many levels.
 

SpacePhoenix

Established Member
Joined
18 Mar 2014
Messages
5,491
Are they compatible in service with 314s or could they only ever couple to a 314 for rescue purposes?
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,195
Why Class 314 in particular? I believe that on occasion, Class 313 and 315 units will have worked alongside each other on services originating from Liverpool Street, or indeed stopping at Stratford.
 

anti-pacer

Established Member
Joined
5 Jun 2013
Messages
2,312
Location
Liverpool
Stick a 315 on the St Albans Abbey branch. I am surprised no one has suggested sticking a diesel generator on them and sending them "up norf"

I'm sure the DfT will think of that idea. After all, we're getting *some* new stock, so that should keep us peasants grateful for a while. Grateful enough to take the South's redundant trains.
 

SpacePhoenix

Established Member
Joined
18 Mar 2014
Messages
5,491
Why Class 314 in particular? I believe that on occasion, Class 313 and 315 units will have worked alongside each other on services originating from Liverpool Street, or indeed stopping at Stratford.

That's a point, I forgot about the 313s. They could be offered to either (or both) Southern and ScotRail to use to either boost capacity on existing and/or run extra services.
 

christopher

Member
Joined
22 Aug 2006
Messages
410
Location
Over there
I wouldn't complain about getting the 315s, After the work TfL have done on them they are very nice units again now!
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,886
That's a point, I forgot about the 313s. They could be offered to either (or both) Southern and ScotRail to use to either boost capacity on existing and/or run extra services.

You must have missed all the 385s being built for ScotRail, including replacing Class 314.

Or is this just the usual "railway forum detached from reality" type stuff?
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,195
Or is this just the usual "railway forum detached from reality" type stuff?

It's the "Andrew Gwilt effect", he keeps offering 'his' ex-Greater Anglia units to TOCs such as Northern and ScotRail, despite the fact that both are ordering new stock.
 

fredk

Member
Joined
2 Sep 2016
Messages
100
The 315 is at life end mechanically, electrically & maybe structurally, hence for scrap.

With all the other spare units around all of the 313,314,315,507,508 are for scrap.

That is scrap, not DeMUs, for HS2 or to make 442s dual voltage!

I think you are on to something there... Class 315s would be perfect on hs2 :lol:
 

Class 170101

On Moderation
Joined
1 Mar 2014
Messages
8,664
That's a point, I forgot about the 313s. They could be offered to either (or both) Southern and ScotRail to use to either boost capacity on existing and/or run extra services.

315s have no 3rd Rail kit so are useless on Southern.
 

Class455

Established Member
Joined
19 May 2016
Messages
1,520
I would think the most likely place for these trains is the scrap heap unfortunately. I was on 315 832 today and the new moquette fitted upon refurb makes it look very dated, but they've done quite a good job with the lighting. But at 40 years old, and with younger stock becoming available, I can't see any place where the 315's could go after they are withdrawn.
 

SpacePhoenix

Established Member
Joined
18 Mar 2014
Messages
5,491
How likely is it that all the 31x classes will be scrapped within the next 5 years?
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,373
Do Class 315s have a ~750Vdc busbar through the carriages to power the motor vehicles.

In other words are they just 313s without the controls for operating on third rail power?
How (theoretically) expensive would it be to rebuild them into dual voltage units?
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,755
Location
Nottingham
Do Class 315s have a ~750Vdc busbar through the carriages to power the motor vehicles.

In other words are they just 313s without the controls for operating on third rail power?
How (theoretically) expensive would it be to rebuild them into dual voltage units?

They must have some sort of bus because the motors are in a different car from the transformer. However the traction electronics is designed for AC only (phase angle control) so would need replacing with something that would work on DC.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,373
They must have some sort of bus because the motors are in a different car from the transformer. However the traction electronics is designed for AC only (phase angle control) so would need replacing with something that would work on DC.

Isn't that someone strange? That would mean they would have entirely different electrics in them than the 313s and 508s - which seems an odd set of choices.
 

apk55

Member
Joined
7 Jul 2011
Messages
446
Location
Altrincham
Isn't that someone strange? That would mean they would have entirely different electrics in them than the 313s and 508s - which seems an odd set of choices.

At the time the units were conceived electronic control from a DC supply was still in the experimental stages. Therefore BR chose the the well tried and tested system of switched resistances by a camshaft and series parallel switching of the motors. It was not until the late 1980s when traction sized Gate Turn Off Thyristors became available that electronic on a DC system became a practical option.Now even these have been by IGBTs.

However at the time phase angle control had just become possible and the class 314/315 were the first fleet units to use electronic control rater than a tapped transformer and mechanical contacts to select the motor voltage
 

Mordac

Established Member
Joined
5 Mar 2016
Messages
2,386
Location
Birmingham
Do Class 315s have a ~750Vdc busbar through the carriages to power the motor vehicles.

In other words are they just 313s without the controls for operating on third rail power?
How (theoretically) expensive would it be to rebuild them into dual voltage units?

Why would anyone want to do something like that?? Send these tins cans to Booths asap please.
 

43074

Established Member
Joined
10 Oct 2012
Messages
2,253
How likely is it that all the 31x classes will be scrapped within the next 5 years?

Do you mean the 317s/318s and 319s or the PEP inspired units? (313/314 and 315)?

I reckon it's very likely most of the PEP based units will be scrapped, same for most of the 317s, the 318s are secure until at least the next Scotrail franchise, I wouldn't even be surprised if a few of the 319s were scrapped just because of the sheer number of them (and other/newer EMUs) that will be available. Having said that I would like to see one or two examples of each class preserved though, at the very least.

The government seem to have gone off electrification, claiming bi-modes or other new trains can deliver the same benefits, so it's unlikely any extra electrification will be carried out to find homes for even a small number of the displaced units, and Welsh Valleys electrification appears not to be progressing, but that's more a Welsh Assembly issue.
 