Bletchleyite
Veteran Member
An 11-car Pendolino is 265m long. Why the short trains?
Not everything would have to be precisely 200 or 400m.
Not everything would have to be precisely 200 or 400m.
An 11-car Pendolino is 265m long. Why the short trains?
Not everything would have to be precisely 200 or 400m.
The new franchise – the West Coast Partnership – will be responsible for services on both the West Coast Main Line from 2019 and designing and running the initial high speed services from 2026
So that makes it a much more interesting competition, and will attract all kinds of bidders, not just the usual suspects.Today’s announcement is just the first step.The formal expression of interest (EoI) for the West Coast Partnership is due to be published in December 2016, followed by the invitation to tender (ITT) in October or November 2017, with the new franchise scheduled to start 1 April 2019.
If not 400m then there would need to be the ability to lengthen then at a later date (which could done by shortening other mid length units to form short and long units).
Likewise if not 200m then you loose the agility to spilt services on route.
It also seems worded, unless they get a consortium going, to exclude Virgin Rail Group.
It also seems worded, unless they get a consortium going, to exclude Virgin Rail Group.
--- old post above --- --- new post below ---
I'm unconvinced that we should be looking to portion-work on HS2 from day one. Delays on the classic network would be likely to cause serious punctuality issues.
Portion-working is likely to be a more reliable proposition on the "full" HS2 on a self-contained basis.
Being cynical, VRG could get high speed expertise by partnering with Govia or Eurostar (HS1).
But it does look like an invitation for the big boys to lead.
I'm not sure any amount of HS expertise will help DB/SNCF etc run the current WCML.
Nothing said about HS2 rolling stock, which might well be a separate (DfT) procurement.
I wonder how SNCF/Siemens or DB/Alstom would work?
Or maybe the Japanese will take it all.
The "big boys to lead" aspect was the one that hit me most from reading the announcements. Having a "straddling" franchise makes sense but there are huge risks for the DfT to manage through this process.
Unavoidable for the Anglo-Scots services. 400m trains are necessary to meet demand (some shifted from air) within a limited number of train paths (both on HS2 with its 18tph capacity to be distributed between West Midlands, North West, North East and Scotland, and also over Shap for freight capacity).
But you can't get 400m trains into Glasgow/Edinburgh. The only choice is to split at Carstairs/wherever.
Same would apply to Liverpool Lime Street, should demand ever warrant 400m trains; 2 x 200m attaching to something else is unfortunately a necessary evil to get the most out of the capability of HS2 (although perhaps not in the Day one timetable).
I've lived in both Cambridge and Northampton, and performance of regular splitting/joining at both locations has never been the massive issue people make it out to be*
*Attempting to couple Class 350s in temperatures of -5 degrees excepted.
If the DfT is following its rules, the bidders will have to have a franchise "passport".
At the moment that is limited to the well-known suspects, plus a few who have qualified but not bid yet.
But there is a window for newcomers during the "expressions of interest" stage, where new applicants are invited.
Currently, the major foreign operators use subsidiaries for UK bidding - Arriva, Abellio, Keolis.
But DB, for instance, had planned to operate on HS1 through its mainline operator (DB Fernverkehr) rather than Arriva.
This was not a franchise of course, and would have been open access.
Time will tell if the "real" DB/SNCF etc will stand up for HS2.
Actually a 125 mile new HSL and 60-odd new trains is small beer to most of them these days
Applicants should note that due to the unique nature of the WCP proposition, the department is considering the potential for a franchise specific approach to the operation of the temporary visa mechanism as currently set out in the Passport process document. In the event that a franchise specific approach is adopted, details will be set out in the WCP franchise EoI process document.
Due to the unique nature of the WCP proposition the department anticipates that bid vehicles will need to draw upon a wider range of participants and skills than would usually be the case in a rail franchise competition. Participants are encouraged to form bid vehicles in a manner which will enable them to deliver as strongly as possible all the constituent elements of the WCP franchise as described above. The department reserves the right to refine further its requirements in relation to the nature of the contributions to be made by the participants in a bidding vehicle.
The competition has slipped a year, so Virgin will get another extension to 2019.
https://www.gov.uk/government/news/...ith-the-introduction-of-high-speed-2-services
So Virgin have effectively been a 6 year contract to run a franchise without a formal bidding process.
In 4 or 5 short chunks preventing them doing anything significant to improve the service.
You don't think the Scotland via Birmingham change was anything significant to improve the service? Nor the conversion of the first class coach to Standard on the 9-car sets? I do.
In 4 or 5 short chunks preventing them doing anything significant to improve the service.
I haven't seen a new franchise schedule, but it looks as though this new one will push back the GW and possibly XC rebids in 2018.
There was a tweet from Philip Haigh of Rail Magazine earlier today including an updated schedule.
Does this relate to George Osborne trying to get CRH (China Railways Highspeed) to run HS2?
No, he wanted Chinese capital to be involved in funding it, and possibly being involved in construction (like Hinkley Point).
I've found that page in the updated OJEU notice: https://www.gov.uk/government/uploa...rail-franchising-pqq-passport-ojeu-notice.pdf
If you read that is says the schedule has only been updated with the WCP dates, and other parts of the schedule will be updated "shortly".
That says to me that there will be some impact.
It also invites WCP franchise "passport" applications, and gives a close date of 24 April 2017.
This is also the close date for responding to the Expressions of Interest document (still to be published).
The indication is that it will not be a standard franchise bidding process.
Quite, another operator who seem to manage it day in day out (multiple times a day at multiple locations, including peak hour services) is SWT. Yes they allow a few minutes in the timetable, but can do it with only a short delay if the service is running late (effectively open doors, passenger melee, shut doors, split/join, service carries on).
To be honest the main franchise issue I'm most keen to hear about is South Eastern and whether it is partly devolved or if Mr Grayling keeps it for himself.