The Planner
Veteran Member
- Joined
- 15 Apr 2008
- Messages
- 19,736
Probably a bit more to do than that but in the grand scheme of things easier than most.
I'm not sure off the top of my head the answer to this, but have any railways been rebuilt in the same way as The Borders railway in any part of the UK other than Scotland?
Edit - Answering my own question slightly, I suppose some of the tram and light rail routes have used parts of abandoned formations, but have any heavy rail routes been put back for passenger railways?
I'm not sure off the top of my head the answer to this, but have any railways been rebuilt in the same way as The Borders railway in any part of the UK other than Scotland?
Edit - Answering my own question slightly, I suppose some of the tram and light rail routes have used parts of abandoned formations, but have any heavy rail routes been put back for passenger railways?
New Mills to Hazel Grove to let Manchester to Sheffield trains run via Stockport, but this was a while ago.
I've just realised the forum favourite isn't there!!
Aberystwyth to Carmarthen!!
And where is the money to come from?
Chancellor will reportedly be putting aside £15bn for infrastructure schemes as an economic stimulus to help combat Brexit. The requirement however is that they be quick wins, shovel ready and with a good economic return on investment. Those requirements will however favour road and mean the majority of rail schemes will be excluded as only ones that are already at an advanced stage of design will be deployable without extensive design/consultation time. The rail schemes likely to benefit therefore will be small and quick things like stations, bottlenecks or mid sized schemes already at GRIP 3 stage (like for example Skelmersdale branch).
Chancellor will reportedly be putting aside £15bn for infrastructure schemes as an economic stimulus to help combat Brexit. The requirement however is that they be quick wins, shovel ready and with a good economic return on investment. Those requirements will however favour road and mean the majority of rail schemes will be excluded as only ones that are already at an advanced stage of design will be deployable without extensive design/consultation time. The rail schemes likely to benefit therefore will be small and quick things like stations, bottlenecks or mid sized schemes already at GRIP 3 stage (like for example Skelmersdale branch).
The Middlewich Branch could be rolled out quickly and the work would offer an economic stimulus BUT hard to see how a 153 trundling through small Cheshire towns would be anything other than a net loss-maker.
The additional hourly train proposed to be introduced between M/c and Northwich from 2018 could easily be extended to Crewe, so only 1 extra train would be needed, assuming the Northwich-Crewe journey time is under 30 minutes (achievable in 1910).
... as only ones that are already at an advanced stage of design will be deployable without extensive design/consultation time. The rail schemes likely to benefit therefore will be small and quick things like stations, bottlenecks or mid sized schemes already at GRIP 3 stage (like for example Skelmersdale branch).
Chancellor will reportedly be putting aside £15bn for infrastructure schemes as an economic stimulus to help combat Brexit. The requirement however is that they be quick wins, shovel ready and with a good economic return on investment. Those requirements will however favour road and mean the majority of rail schemes will be excluded as only ones that are already at an advanced stage of design will be deployable without extensive design/consultation time. The rail schemes likely to benefit therefore will be small and quick things like stations, bottlenecks or mid sized schemes already at GRIP 3 stage (like for example Skelmersdale branch).
If you mean completely rebuilt on the line of a closed railway, with the closure not part of the reopening process (if that makes sense) then quite a few. For example:
Parts of the Robin Hood Line
Birmingham Moor St - Handsworth
Airdrie-Bathgate (OK, that's Scotland too, but was pretty significant)
Ebbw Vale Parkway - Ebbw Vale
Watford High Street - Croxley Green (under construction)
I wonder if extending the Robin Hood line North might be one such scheme that could be done in the short term. I'm sure there is at least one other open freight line in Nottinghamshire than could be re-opened to passenger traffic. How close to "shovel ready" they are I am not quite sure, but they are already open to freight traffic.
I heard on the news this morning that one of the proposed projects was a new motorway link between Oxford and Cambridge.
Extending Robin Hood line north....... where to?
There could potentially be a significant amount of new route build, depending on the option(s) chosen. Some potential sharing of the same corridor as rail too.The £27m announced is to fund a detailed study into the project, so it's at an earlier stage than the Bedford-Cambridge part of the E-W rail project. In any case it's not a new motorway being suggested, it's upgrading existing roads to sub-motorway standard.
There could potentially be a significant amount of new route build, depending on the option(s) chosen. Some potential sharing of the same corridor as rail too.
The latter proposal is also being looked at by the council. I understand that they are thinking light rail or tram train to maximise connectivity.
Tram train might work on a lightly used freight line....but if parts of the route are also on main lines with existing express passenger trains such as HSTs running into Nottingham or occasionally also on the Erewash Valley line through Ilkeston, would tram trains work?
I'm not sure which rail schemes in the whole country are "shovel ready" but I can't help wondering whether the conversion of an existing freight line for 6 miles or so might be the next best thing.
Of course, then there's the problem that there is no existing rolling stock to run on it!
The Campaign for Better Transport have prduced this lobby document, your thoughts all.
http://www.railtechnologymagazine.c...-rail-improvements-in-autumn-statement/156965
[/LIST]
I heard on the news this morning that one of the proposed projects was a new motorway link between Oxford and Cambridge.
That really made me chuckle thinking of the Yes Minister episode where they talk about some of the first Motorways that were built were between London and Oxford and Cambridge so that ministers could visit their old collages.
On a more serious point would such a motorway have any implications for the East West rail link.
It is the Bicester to the M1 Option B route for the Expressway that mostly parallels the rail corridor but since they have been careful to only publish schematic diagrams rather than anything more detailed, exactly how closely is not defined. M1-Cambridge is stated to be largely an improvement to the current route, with some offline upgrades.Yes, but far more likely at the western end - most of the route between the M1 and Cambridge is already at the suggested standard (Cambourne to the A1 is the only part east of the M1 that isn't, and that is mostly 'open-country' except in the vicinity of St. Neots, so shouldn't be too difficult to dual). So I don't see that much scope for sharing a corridor on that stretch since there is not likely to be much new road route to share (and most of the recently suggested eastern section E-W rail routes take a more southerly path than the A421/A428 anyway).