PHILIPE
Veteran Member
What trains on the GWR will be running to Ealing Broadway over christmas?
Why not have a look at Real Time Trains.
What trains on the GWR will be running to Ealing Broadway over christmas?
And still nobody has mentioned NO trains on Boxing Day. I'm amazed![]()
Why not have a look at Real Time Trains.
I thought at first that train were either running into Waterloo or Marylebone but |I've found out some are terminating at Ealing Broadway will we get to see the rarity of GWR HST's and Adelante's stopping there and I hoped Heathrow Express to but it seems they are only shuttling between the Heathrow Terminals![]()
AFAIK Southeastern HighSpeed are running.
RTT have Boxing Day St Pancras-Gravesend services in the system now http://www.realtimetrains.co.uk/sea...-0159?stp=WVS&show=passenger&order=wtt&toc=SE which is new, as in previous years it's been St Pancras-Ashford.
Going to Gravesend this year due to engineering works blocking the HS1 Chords and Platforms 5 & 6 at Ashford.
The original story was that trains would go to Waterloo or Marylebone but as they can go almost to Paddington. In any case Waterloo has it's own Engineering Works. I think you'll find Swanseas, Britol and West of Englands will terminate at Ealing Broadway although there appear to be some terminating at Reading. The service has been thinned out somewhat in so much as Cheltenham trains will not run beyond Swindon.
The original story was that trains would go to Waterloo or Marylebone but as they can go almost to Paddington.
Also there don't seem to be any Heathrow Express or Connect trains running over the period which I thought was 24th-30th December but the GWR website says 24th-20th December![]()
I presume Network Rail will have another go at replacing the bridge (or bridges) over Old Lodge Lane, Coulsdon, which was disrupted by bad weather last year. That would see the Brighton Main Line severed for the duration.

According to the GWR website, trains will start and finish at Ealing Broadway. "Unfortunately, the platforms there are not long enough to accommodate the carriages which carry bikes...". Therefore bikes are banned on high speed services east of Reading and on local and regional services east of Slough.
According to the GWR website, trains will start and finish at Ealing Broadway. "Unfortunately, the platforms there are not long enough to accommodate the carriages which carry bikes...". Therefore bikes are banned on high speed services east of Reading and on local and regional services east of Slough.
How long are the platforms at Ealing Broadway? I appreciate it may be tight for HSTs but turbos and adelantes should be no problem whatsoever?? Bikes can be taken on and off turbos there every day normally?
Maybe they've decided this because of overcrowding. If so say so, don't bs..
Just wanted to ask here before messaging GWR...
Cheers![]()
On HSTs bikes are carried only in the TGS, the coach at the very west end of the rakes if the rake is orientated normally, and in the adjacent power car. If the doors to these vehicles are off the end of the platform at Ealing then it's not possible to load and unload bicycles.
It is just possible that GWR know what they are doing...
My question was how indeed long are the platforms at said station?
HSTs will be using Platform 3 and 4, the relief line platforms, during the closure. Platform 3 which will be used for starting services is 182 metres and Platform 4 which will be used for terminating services is 200 metres.
8 coaches of Mk3s is 184 metres, so that makes Platform 4 just long enough for the front power car (17 metres) and all coaches with the rear power car hanging off the platform. However Platform 3 on the other hand, assuming the front power car remains on the platform, could be an issue for loading bikes if the set was in reverse formation.
Very tight indeed then..