No but they need updated stock lol
Wakey wakey, haven't you heard the news regarding the new AGA franchise?
No but they need updated stock lol
The important point to take away from this is that while it may seem like a shame to waste potentially 10 years of the lifetime of a train, if it's spec is too narrow, it may just not make it all the way to the second peak of its bathtub curve and maybe that's not the worst thing ever.
Who's to say that those HST's will not receive the required modifications and then be moved on once the route is electrified? Don't forgot that the Norwich route has seen it's Mk3's modified to comply with the new standards and yet we now know that they are due to be replaced by new stock.
You would still have all the negative publicity of diesels running under the wires even though people have suffered disruption / noise during the night supposedly to replace those diesels. Surely you understand how the media operate in this country? In all fairness from my experience capacity isn't an issue on the MML. The fact that those Mk4s would be loco hauled would be irrelevant to the average passenger but you can guarantee that the media would go to town over second hand trains.
Who's to say that those HST's will not receive the required modifications and then be moved on once the route is electrified? Don't forgot that the Norwich route has seen it's Mk3's modified to comply with the new standards and yet we now know that they are due to be replaced by new stock.
What reason is there to suggest that you couldn't get 30 years use out of EMU's on the MML? Assuming that MML follow the lead that was taken on the Norwich all those HST's and Meridians will be gone by the mid 2020's and the EMU's start running. That can be no guarantee that a TOC would want those Pendolino's / IC225s once they are displaced; a precedent has now been set where TOC's are winning franchises and then ordering brand new fleets.
You are suggesting that it would be difficult to fit 8 car EMU's into Sheffield before returning south and yet you are suggesting that a full length IC225 wouldn't be a problem? Which begs the question; what's the difference?
It was mentioned in a PDF document which I saw on the internet some years a go, however I don't have the time to go looking for it. If you look at the issues surrounding Toton unless you live in the western Nottingham suburbs it makes no sense to use it. And I can't think of anyone traveling to the centre of either Nottingham or Derby wanting to travel to Toton because of the inconvenience. In terms of traveling from Derby to Toton the A52 is chronic in the mornings and it isn't going to get any better. The M1 is flowing freely at the moment in the East Midlands thanks to all the improvements but
give it another 15 years and it will have surely filled up again making it more difficult to access Toton.
You maybe familiar with the long running Practice & Performance series in Railway Magazine. A couple of years a go (and after the improvements had been largely completed on the MML) the magazine timed some runs between Sheffied and London. From what I recall the Meridians were being run at full line speed including 125 mph running from Cricklewood to north of Bedford. All this suggests that those EMU's are reaching their maximum speed much quicker than the EMT services and so are not holding them up. Indeed the same thing happens at the southern end of the ECML.
It's also worth noting that Network Rail are having to make costly modifications to the existing wires between London and Bedford in order to allow 125 mph running. The point I'm making is that they wouldn't be going to all of that expense unless sustained 125 mph running was possible.
Who want to buy a fleet of diesels which only have guaranteed work for five to six years with no real prospect of work after that? As opposed to an EMU which will give you 30 years of use. Given that we are told that a class 67 struggles to get to 125 mph that is not much of a solution. Someone has suggested that you could run a class 67 at either end but what modifications would you need to make to those Mk4s to allow it?
And TPE are building new 125mph trains to run across the Pennines on much slower track... Line speed, train ability and actual speed of schedule services are not always in synergy with each other.
And as I keep reiterating, 125mph line does not mean that trains run at 125mph all the time, better low down acceleration performance with a lower headline speed could go a long way to closing that gap to a level that doesn't really matter - that said, given the diesel locos under wires hauling Mk4s will make up just 12 units, alongside 27x class 222s and half a dozen "387 type" EMUs for Corby, the reality of the problem is that only a quarter of the fleet would be "constrained" by these limitations, if it transpires that there are any deficiencies in the actual performance.
Bi-mode fleet needed by 2020, says major East Midlands rail strategy
A new fleet of intercity-style bi-mode trains is needed to deliver a greater level of service as part of the upcoming 2018 East Midlands franchise, according to the results of a consultation into the future of the region's rail network.
The vision for rail travel in the East Midlands, set out today in a major strategy, includes much faster and more frequent journeys, with trains from London reaching Leicester in one hour, Nottingham in 90 minutes and Sheffield in one hour and 50 minutes.
The report, East Midlands: A Railway for Growth, was launched today at the Rail Forum East Midlands (RFEM) annual conference, attended by RTM, following a consultation with key local stakeholders.
It says that the best solution to delivering a new London service that still stops at all the stations along the route is a fleet of new bi-mode trains, capable of travelling at 125mph.
They should replace the current fleet of high-speed trains, which will need retirement in 2020, and feature improved accessibility, better on-board wi-fi and greater capacity.
In addition, the report said a plan to secure more trains for regional services is needed before 2020 in order to reduce the current overcrowding on the route.
It called for "urgent decisions" to be made on the rolling stock used on the Midland Main Line, and "a firm plan and funding" to secure rolling stock for regional services.
Jake Kelly, managing director for East Midlands Trains, said: We are at a critical crossroads for rail services in the East Midlands and we have a great opportunity to work together now to secure the improvements needed for this railway.
The message we are hearing from local stakeholders is very clear: if we are to build on the big progress made in recent years, we need to take action to ensure communities and the economy in the East Midlands benefit from further improvements and we don't lose out to other regions.
Whilst there are major improvement plans with HS2 and electrification that we fully support, the proposals we have put together with our stakeholders would deliver fast improvements for our customers and communities whilst offering value for money for the taxpayer.
We need to be loud and proud about the improvements that we would like to see and that our customers deserve. Now is the time to ensure that new trains and extra carriages can be secured for this rail network.
Sir John Peace, chair of Midlands Engine and Midlands Connect, which helped launch the report, said that while approval for HS2 was eagerly awaited in the region, there was clearly a need now for more and faster trains in the region, which the new strategy would address.
If the fares for trains on HS2 are too expensive then people might stick with the old routes and so more stock would be needed on the old routes.
Why would HS2 fares be expensive? It'll be a brand new (i.e. cheaper to run) railway with bags of capacity.If the fares for trains on HS2 are too expensive...
Why would HS2 fares be expensive? It'll be a brand new (i.e. cheaper to run) railway with bags of capacity.
Which would be best done by 'piling them high and selling them cheap'.Presumably the assumption is in some attempt to recoup the construction costs.
Loco+Mk4 rakes would be slower, heavier and less capacious than a new fleet of AT300s. All three of those things make them less than suitable for use on the MML, even if their leasing costs would be minimal.
Hitachi are now producing AT300 sets at a very competitive price and with demand for long-term safe investments being so high, it seems almost certain that someone will be willing to stump up the capital to build a fleet of them.
The 2020 deadline is still just an arbitrary date and having a derogation for a few months isn't going to make anyone too unhappy, especially when a large percentage of the services are already run by compliant units.
Agreed, completely, I've only ever seen them as a short term stop gap to either cascaded 390s or new EMUs, to get around the post 2020 gap.
Someone who already works for EMT has already mentioned that the HSTs are to be life extended.
Yeah I noted that Hairybear said that, has anything been officially announced ? Will this be the current franchise that does this ?
Only if they win the next franchise which ends March' 18.
No doubt Porterbrook will expect the new new franchisee to pay for the mods even though they own them.
And it was an internal memo about 6 weeks ago
why not fit the IC225 / Mk4 fleet with the tilting bogies they were designed for and use them on the WCML along with the 91's? If used mainly north of Crewe, they would allow the Pendolinos to be concentrated on Euston-Liverpool/Manchester/Birmingham routes without the IC225s getting in the way. The IC225 fleet would handle Manchester/Liverpool/Brum to Scotland, and maybe Glasgow-Euston (non-stop south of Crewe). That way the inferior IC225 acceleration would not be a problem.
Once they are retiring from ECML duties they will be around 30 years old , it's not as if they are modern trains really and they've had some pretty hard work day in day out for those years. They are a fairly small fleet which were built for a purpose, look at the similar fleet of deltics the 225s life span will be approx 50% longer than those managed. Unless a use is found like virgin are with limited stop use then The market for a slow accelerating train is almost none in a high performance MU operated railway.
But there aren't any such tilting bogies.
They were designed to use the APT bogies, for which the drawings must exist and for which a modern upgraded version would surely work.
They were designed to use the APT bogies, for which the drawings must exist and for which a modern upgraded version would surely work.
I expect we'll see the 6-8 Virgin want for limited stops to last a few years until an add-on class 801 order is placed. I really hope we don't end up with a XC or MML situation where HSTs weren't fully replaced, leaving a mixed fleet of varying performance and quality.
That is the first time I have ever read that - you do realise that the APT was articulated and the Mk4s are not? The Mk4s are fitted with Swiss SIG bogies originally laid out for 140mph running. In modern parlance the trains were 'future proofed' by having been built with a tapered body to allow tilting as the original intention was to use them on the curvaceous West Coast main line.
Someone who already works for EMT has already mentioned that the HSTs are to be life extended.
Surely it would be cheaper to propose to run a suitable loco (100mph) with 5 or 6 coaches (Mark 4) and a DVT from about 2019 to about 2021 (say 10 to 18 months) to free up 222s and then use the 222s to replace the HSTs and then replace the whole fleet with 80x's once there's capacity to build them.
By having fewer carriages then the acceleration wouldn't be as bad as the current 9 coaches, meaning that most of the difference would be down to top speed. Yes there would be some services that would run a few minutes slower, but not all and maybe not that different to the HSTs if the acceleration curve is marginally better.
With any disbenefits for a limited time period.
Otherwise you are potentially"stuck with" the costly upgrade to the HSTs coaches, which you'd either need to wright off or keep for some time to "recoup" your investment.
On the plus side you gain coaches that will have only had a refurbishment in the last few years and have a fairly limited list of future uses. The ROSCO would probably bite of the hand of someone offering to lease them for a short period, unless GWR are interested, as most of the other franchises that could be vaguely interested would be in a position to take them before 2020 anyway. By early 2020 EMT could be in a position to start to release them again anyway, or at the very least sub leasing them.