The word on the tracks is that all 5 sets are due to get PRM'd in 2017/8 if the franchise extension deal (rumoured to be fairly imminent) goes through.
The word on the tracks is that all 5 sets are due to get PRM'd in 2017/8 if the franchise extension deal (rumoured to be fairly imminent) goes through.
The word on the tracks is that all 5 sets are due to get PRM'd in 2017/8 if the franchise extension deal (rumoured to be fairly imminent) goes through.
What does that mean exactly ?
The word on the tracks is that all 5 sets are due to get PRM'd in 2017/8 if the franchise extension deal (rumoured to be fairly imminent) goes through.
Educated guess: any franchise extension would be more or less on existing terms so little likelihood of changes to the fleet. This would mean when the franchise is actually renewed there would be insufficient time to arrange replacements for the HSTs in time for the PRM deadline. So it would be hugely sensible for the the extension to include provision for upgrading the current HST fleet to full PRM standards, ie accessible doors, which is likely to mean Chiltern style power doors though modified non-powered doors could comply with the regulations, and sufficient provision of PRM friendly seats/places and accessible toilets. In any case I would expect the opening droplights to be replaced with sealed units.
Educated guess: any franchise extension would be more or less on existing terms so little likelihood of changes to the fleet. This would mean when the franchise is actually renewed there would be insufficient time to arrange replacements for the HSTs in time for the PRM deadline. So it would be hugely sensible for the the extension to include provision for upgrading the current HST fleet to full PRM standards, ie accessible doors, which is likely to mean Chiltern style power doors though modified non-powered doors could comply with the regulations, and sufficient provision of PRM friendly seats/places and accessible toilets. In any case I would expect the opening droplights to be replaced with sealed units.
Great, thanks. But what does PRM mean? Not Disability Act-related, but...?
"Persons of reduced mobility" as I understand it.Great, thanks. But what does PRM mean? Not Disability Act-related, but...?
Chilternise the Mk3s, use the displaced DVTs from VTECs 225s and hire 68s to cover. Job Done.
Why is there a deadline for the HSTs? Is it more the power cars if anything?
Or just keep the good 43s in service.
It's to do with the slam doors of the coaches.
All of XC's fleet look that way on the outside (well, HST & Voyager - only seen a couple of their 170's but they looked grim too...) however, the XC interior on HST is generally good. Unlike a Voyager the MK3's are well lit and generally seem cleaner!
Chilternise the Mk3s, use the displaced DVTs from VTECs 225s and hire 68s to cover. Job Done.
If only it were as simple as it is to type
Why is there a deadline for the HSTs? Is it more the power cars if anything?
It might be my eyes, but the XC HST examples I have seen are by far the worst condition examples I've seen.
It's to do with the slam doors of the coaches.
No it isn't. It's the requirement for all stock to be modified to meet the PRM regulations from 01/01/2020. Mark 3s can be modified to be compliant without fitting power doors, though ScotRail (and any retained sets on GWR) are getting power doors because they have benefits in terms of safety (no open door/door on the catch incidents) and operational efficiency (shorter station dwell times).
The simpler option might be 67s and Mark 4s.
How on earth would they hope to keep to the current timetable?
You can change "may" to "will"! My use of the words "power doors" was chosen to cover the fact that the ScotRail fleet will get sliding doors rather than the plug doors used by Chiltern. If XC went the same way, they would get the same modifications.although they may not be the Chiltern solution as there is now a sliding door solution with is allegedly significantly cheaper.
Yes**. And they quite often do when things go wrong (I travel on XC between DBY and EXD* quite frequently and always go for the HSTs if possible. I seem to be quite unlucky since nearly half the time I end up with a Voyager).
My understanding is that the HST paths allow more time because of the slower acceleration so Voyagers can do HST diagrams but not the other way round (if they are to keep to time).
When I do get an XC HST I always find them in very good condition internally (but maybe that's just 1st class).
* DBY=Derby, EXD=Exeter St. Davids
** I mean from the timing point of view, *not* from the point of view of them having enough Voyagers!
I'm betting the HST 'deadline' will be extended a bit, anyhow.
What does that mean exactly ?
I can assure you that there is a plan, but no-one is allowed to say anything about it until the direct award is decided, so everyone will just have to wait until it is made public.Anything coming out of XC regarding their futures - I've seen nothing?
The top and tail 68s on load four, as they're reputedly initially intended to be used on Transpennine, should be good fun.Top and Tail them.
Maximum POWAH!
Slam doors on Mark 3s are not the issue with PRM compliance, as I posted above!i'm guessing made to comply with the standards for accessibility required to remain in service after the cut -off date ... something which is none trivial for Mk 3 stock whether LHCS or HST trailers due to the slam doors etc ...
The issue there is the nature of the XC route - the trains that serve the outlying parts of the route (say Glasgow to Newcastle and Bristol to Plymouth) are the same trains that serve the core.Is is possible that XC could use the HSTs on the busiest parts of the line (say between Bristol TM and Newcastle) and use the Voyagers for the more outlying parts of the network where there there may be fewer passengers?
It's not really possible without a large scale restructuring of the current service matrix: There's already limited examples of Voyagers being used to strengthen the busiest services through the Crosscountry core, but with an HST, you'd have to turn the whole train back early rather than detaching a unit at, say, Bristol or Newcastle. The longest trains, such as they are, are already targeted at the busiest services, so without acquiring additional trains there seems to be little more that Crosscountry can do, more's the pity.Is is possible that XC could use the HSTs on the busiest parts of the line (say between Bristol TM and Newcastle) and use the Voyagers for the more outlying parts of the network where there there may be fewer passengers?