I perceive, and it might only be perception, that track condition in the UK is not as good as on the continent. A few questions:
1. Is that a fair statement?
2. If so, why is it - older underlying infrastructure or we do not replace track as often as they do on the continent?
3. What problems does this cause to the track that could otherwise be avoided or reduced - unexpected track defects, worse performance in very hot/cold weather?
4. What costs does this cause to the TOCs/ROSCO's in terms of increased maintenance costs? Could an accelerated track replacement programme be justified on the ground of lower maintenance costs for trains (leaving aside the fact that the incentives to make this work are fragmented in the privatised industry we have).
5. Is there any other upside from accelerating track replacement in the UK (for instance reduced costs attributable to delay) and do forum members think this should be more of a priority than it is at the moment.
1. Is that a fair statement?
2. If so, why is it - older underlying infrastructure or we do not replace track as often as they do on the continent?
3. What problems does this cause to the track that could otherwise be avoided or reduced - unexpected track defects, worse performance in very hot/cold weather?
4. What costs does this cause to the TOCs/ROSCO's in terms of increased maintenance costs? Could an accelerated track replacement programme be justified on the ground of lower maintenance costs for trains (leaving aside the fact that the incentives to make this work are fragmented in the privatised industry we have).
5. Is there any other upside from accelerating track replacement in the UK (for instance reduced costs attributable to delay) and do forum members think this should be more of a priority than it is at the moment.