Glasgow Queen Street refurbishment and remodelling

Status
Not open for further replies.

PaxVobiscum

Established Member
Joined
4 Feb 2012
Messages
2,411
Location
Glasgow
It's the anchor point for the catenary - two crossmembers, lower for contact wire, upper for catenary wire. There's another on platform 4/5 behind the PIS display.

I know, but will it need anchored at that point when the platforms are extended? I don't believe I've seen OHLE that stops so far in front of where the buffers will eventually be, that's why I'm hoping it's a temporary arrangement.

Would a single H beam for each track beyond the buffers, on a alignment central to each four foot not be rather less of an eyesore?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Philip Phlopp

Established Member
Joined
31 May 2015
Messages
3,003
I know, but will it need anchored at that point when the platforms are extended? I don't believe I've seen OHLE that stops so far in front of where the buffers will eventually be, that's why I'm hoping it's a temporary arrangement.

Would a single H beam for each track beyond the buffers, on a alignment central to each four foot not be rather less of an eyesore?

The anchors will need moved for the platform extensions - my guess is they'll be reused elsewhere afterwards.

There's a number of existing anchors (the Motorail bay at Edinburgh being one such example) where the live catenary stops too far from the buffer stops and it's possible to damage the pantograph on the contact wire terminating insulator (as has indeed happened at Waverley). These ones are in a convenient position and will ensure the rolling stock to be used can't run off the end of the OLE in the station.

I'd suggest the permanent approach will be consistent with the works currently being performed on 6&7 which don't feature such a frame.
 
Last edited:

PaxVobiscum

Established Member
Joined
4 Feb 2012
Messages
2,411
Location
Glasgow
Thanks, that's what I was hoping. The platform 6 & 7 anchors look like this (excuse the crop from a reject photo):
 

Attachments

  • anchors.jpg
    anchors.jpg
    143.3 KB · Views: 160

Railsigns

Established Member
Joined
15 Feb 2010
Messages
2,754
Would a single H beam for each track beyond the buffers, on a alignment central to each four foot not be rather less of an eyesore?

I don't think that's permitted because the consequences of a buffer stop overrun would be much worse.
 

Blindtraveler

Established Member
Joined
28 Feb 2011
Messages
10,543
Big question now is will we see a timely reopening or will this be a further Scottish Railways PR disaster to add to the strikes?

Also is it now clear what if any shops and facilities will be available at opening time?
 

Carntyne

Member
Joined
8 Jul 2015
Messages
1,026
Big question now is will we see a timely reopening or will this be a further Scottish Railways PR disaster to add to the strikes?

Also is it now clear what if any shops and facilities will be available at opening time?

It's on time. Not much available as the station redevelopment kicks off pretty soon after.
 

PaxVobiscum

Established Member
Joined
4 Feb 2012
Messages
2,411
Location
Glasgow
I don't think that's permitted because the consequences of a buffer stop overrun would be much worse.

Because of the H beam? As you can see from the photo in post #303, tubular masts seem to be OK in that location. Here's another view of the platform 7 anchor from the RailScot website - still a problem in an overrun, but perhaps they fold more easily than an H beam would bend.
 
Last edited:

Philip Phlopp

Established Member
Joined
31 May 2015
Messages
3,003
Pretty sure they would - tubular steel isn't that strong once you start bending it.

My guess is that the engineers running the project don't want an OLE mast foundation in the middle of what will become the new four foot when the platform extensions are complete, nothing more complicated than that and certainly not an issue of crashing into things (though Railsigns is quite correct in saying OLE mast positioning does need to take into account positioning for buffer stop over-runs).
 
Last edited:

PaxVobiscum

Established Member
Joined
4 Feb 2012
Messages
2,411
Location
Glasgow
Installing Electrification Conductor Bar in Glasgow Queen Street Tunnel uploaded by Network Rail Scotland today. Don't get too excited -it's only 16 seconds long and it takes longer than that to read the title and the description. :)

This is work to install the electrification conductor bar system through Glasgow Queen Street tunnel as part of the wider EGIP electrification. Work was delivered during Network Rail's 20 week blockade to renew the tunnel slab
 

QueensCurve

Established Member
Joined
22 Dec 2014
Messages
2,203
Good to see the wiring going in and signalling too. Not long to go now.

Out of date by now it would seem, but this picture from 9/7/16 shows the masts for the headspan wires and completion of the track/platforms.

attachment.php


Notably similar masts are being installed under the roof. Could the headspans not have been fixed to the roof structure?

attachment.php
 

Attachments

  • CSC_2258.jpg
    CSC_2258.jpg
    214.1 KB · Views: 239
  • CSC_2257.jpg
    CSC_2257.jpg
    116 KB · Views: 228

route:oxford

Established Member
Joined
1 Nov 2008
Messages
4,949
Notably similar masts are being installed under the roof. Could the headspans not have been fixed to the roof structure.

The Queen Street roof is a single span and is fairly lightweight looking structure. I'd doubt if it had the integral strength to support the knitting.
 

Philip Phlopp

Established Member
Joined
31 May 2015
Messages
3,003
The Queen Street roof is a single span and is fairly lightweight looking structure. I'd doubt if it had the integral strength to support the knitting.

You would need a single headspan to cover the entire station, which gets to be very complicated with a whole host of safety issues concerning dewirements, live parts hitting platforms and working at height to effect a repair. The dewirement at St Pancras focused a few minds on that score - all these RAIB reports feed back into project design.

You would also open up the entire station being closed in the event of a serious dewirement, the current system will close just two platforms. I don't know if the actual headspans are identical in terms of dimensions, but they're very easy to repair if damaged/dewired.
--- old post above --- --- new post below ---
Could the headspans not have been fixed to the roof structure?

Yes, but it would be an awful idea. This is the best way to do it.
 

gsnedders

Established Member
Joined
6 Sep 2015
Messages
1,472
I presume you also get into the difficulties of the train shed being a listed building, if you were to attach them to it directly?
 

PaxVobiscum

Established Member
Joined
4 Feb 2012
Messages
2,411
Location
Glasgow
A picture from a couple of days ago - there are several of the headspans fitted inside the trainshed now though the wires are hard to see (as intended):
 

Attachments

  • headspans.jpg
    headspans.jpg
    308.8 KB · Views: 133

najaB

Veteran Member
Joined
28 Aug 2011
Messages
33,734
Location
Scotland
I presume you also get into the difficulties of the train shed being a listed building, if you were to attach them to it directly?
Not particularly for the attachment itself, but probably for the reinforcement that would be required (due to the relatively light-weight construction noted above).
 

PaxVobiscum

Established Member
Joined
4 Feb 2012
Messages
2,411
Location
Glasgow
The polystyrene blocks photo (14th July) used as filler for the excavated platform extensions is interesting, as are the tunnel pics.
 

fgwrich

Established Member
Joined
15 Apr 2009
Messages
10,663
Location
Hampshire
The polystyrene blocks photo (14th July) used as filler for the excavated platform extensions is interesting, as are the tunnel pics.

Seems to be a common thing now - and a clever one at that. There's some stored around the back of Basingstoke station which get used every now and again, not least with the recent lift works here.

I hope that black stuff covering the platform is a temporary cover though, I quite like those stone slabs on the platforms here. Nice set of photos though, great to see work progressing rather well!
 

Philip Phlopp

Established Member
Joined
31 May 2015
Messages
3,003
That looks sturdy! I wonder why they need 3 rails per track there?

It's just to make the transition from contact wire to ROC as smooth as possible as the normal contact wire stops before the regular ROC starts. It's much the same idea as neutral sections.
 

QueensCurve

Established Member
Joined
22 Dec 2014
Messages
2,203
I presume you also get into the difficulties of the train shed being a listed building, if you were to attach them to it directly?

It was done at St Pancras in the original "BedPan" wiring. I don't know if this was perpetuated in the refurbished station.
 