tbtc
Veteran Member
It isn't at all clear why it would be possible to vastly increase capacity of existing lines south of the Thames by upgrading, but not possible on 80-odd miles of track out of Euston
The old Southern Region is seeing an increase in passenger capacity by (a) increasing services to the maximum that the infrastructure can cope with (i.e. 12x20m)...
...and...
...(b) taking out dozens of seats, which isn't really an option on London to Manchester services.
The problem south of the Thames is what you do when 12x20m isn't enough - there's no easy longer term solution if population/ demand keep on increasing.
Timetable re-casts, higher capacity rolling stock, re-signalling, grade separation, longer platforms, and use of alternative existing routes, are all perfectly viable options, which have been used elsewhere to increase capacity.
The familiar list of "perfectly viable options"...
Do you not think that 3+2 seated 350s, operating in up to twelve coach formations are probably the limit?
390s are over 250m long already (longer than the longest Southern Region services) - do you want them to be 3+2 seated too?
And, to echo najaB's point earlier - do you not think that the experts have considered this? What spaces in the timetable have you found that the rest of us haven't noticed? In between ten 125mph services per hour plus the 110mph LM services?
HS2 isn't perfect, but it's an option that would give thousands of extra seats and allow dozens of additional services. As things stand, you're offering no alternative.
Either come up with genuine suggestions for how to recast the congested timetable, name the stations that you'd put longer platforms at, give examples of trains that could be lengthened... or accept that we need more radical surgery than tinkering with the number of toilets on trains to cram a few extra seats in.
Last edited: