The line between Peterborough and Doncaster via Lincoln is an embarrassment for Network Rail. Since the £280m upgrade the line has been and still is failing the general public who use/ cross the line and the train/freight operators in regards to the regular failures of the infrastructure.
As a write this, there are issues in the Littleworth area.
The crossing down times have been well documented by the local press in Spalding with some of the blame aimed at the axle counters.
http://m.spaldingtoday.co.uk/news/l...spalding-after-level-crossing-fault-1-7293183
So I ask the question, when will NR sort out the issues. Could they get rid of the axle counters for another system which would work alongside the OD crossings.
As a write this, there are issues in the Littleworth area.
The crossing down times have been well documented by the local press in Spalding with some of the blame aimed at the axle counters.
http://m.spaldingtoday.co.uk/news/l...spalding-after-level-crossing-fault-1-7293183
The latest problem came after a £280 million upgrade of the Great Northern Great Eastern Line between Doncaster and Peterborough was completed last November.
A Network Rail spokesperson said: “We apologise for the disruption in the Spalding area which was caused by an ongoing problem with a set of points on the track.
“When a fault is detected, the level crossing barriers ‘fail safe’, meaning the barriers are dropped to protect the public.”
So I ask the question, when will NR sort out the issues. Could they get rid of the axle counters for another system which would work alongside the OD crossings.
Last edited by a moderator: