Thameslink/ Class 700 Progress

Status
Not open for further replies.

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
30,844
Location
UK
Happily, the new 700s and the new Moorgate line trains all have onboard cameras so can stop where they like in the platforms. Albeit the 700s will fill the platform!

Will 377s stop there and stop shorter as they have door cameras? Likewise when the 6 car 700s come, will they all stop further back towards the stairs?

I still think NR should have put up cameras and screens, like the other two platforms. But I think most people are used to it and drivers will often wait a bit (at least on trains due to terminate at WGC) even if it means departing a bit late.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

bramling

Veteran Member
Joined
5 Mar 2012
Messages
20,320
Location
Hertfordshire / Teesdale
Will 377s stop there and stop shorter as they have door cameras? Likewise when the 6 car 700s come, will they all stop further back towards the stairs?

I still think NR should have put up cameras and screens, like the other two platforms. But I think most people are used to it and drivers will often wait a bit (at least on trains due to terminate at WGC) even if it means departing a bit late.

I believe the issue is more to do with the risk of a train stopping at the wrong mark. If an 8-car train was to stop at the 4-car mark then cars would be left hanging off the back of the platform, with the risk of passengers falling out in proximity to the fast line.

Will the 700s have any protection against this risk? Possibly a 12-car wrongly stopping at the 8-car mark could have cars off the back of the platform.
 

A-driver

Established Member
Joined
9 May 2011
Messages
4,482
Strictly speaking, from 2018 London Bridge is restored as the main line, and Victoria becomes the branch. And there are plenty of places to lose a 12 car 700 at Brighton.
--- old post above --- --- new post below ---




Happily, the new 700s and the new Moorgate line trains all have onboard cameras so can stop where they like in the platforms. Albeit the 700s will fill the platform!



Will 377s stop there and stop shorter as they have door cameras? Likewise when the 6 car 700s come, will they all stop further back towards the stairs?

I still think NR should have put up cameras and screens, like the other two platforms. But I think most people are used to it and drivers will often wait a bit (at least on trains due to terminate at WGC) even if it means departing a bit late.


The Hatfield situation is nothing to do with dispatch equipment. The 4 car mirror was removed many years ago to force all trains to carry on to the far end. Hatfield was plagued by a high number of stop short incidents and no one could explain why that location was so bad. The up platform now only has 2 stop points as the 6 car monitors have been taken out of use for the exact same reason.

Try won't be re introduced regardless of new train tech. But most trains will be fixed 6/8 car anyway.
 

Philip Phlopp

Established Member
Joined
31 May 2015
Messages
3,003
Happily, the new 700s and the new Moorgate line trains all have onboard cameras so can stop where they like in the platforms. Albeit the 700s will fill the platform!

Any news on whether they'll be putting the disabled section in the middle 2 cars of the 6 car Class 700s, as per the 8 and 12 car units ?

I think it's a cracking idea, keeping everything (wheelchair space, accessible toilet, bike space and first class) in the same place on each train, and it would be a bit of a shame for the 6 car units not to at least follow with the wheelchair spaces.
 

Class377/5

Established Member
Joined
19 Jun 2010
Messages
5,594
Any news on whether they'll be putting the disabled section in the middle 2 cars of the 6 car Class 700s, as per the 8 and 12 car units ?

I think it's a cracking idea, keeping everything (wheelchair space, accessible toilet, bike space and first class) in the same place on each train, and it would be a bit of a shame for the 6 car units not to at least follow with the wheelchair spaces.

The reason behind it on the 700s will because the Core stations are getting ramps like the Tube does so you don't need staff to assist people off, you can just yourself off reducing dwell times while still allowing those with mobility problems full access to the train.

The Moorgate stock (which is a class variant just like the 707s are, so no guarantee that they will be 700s at all) will not have this feature. However it down present logic and the way Siemens have designed the numbering system on the Desiro Cities will likely mean it's kept that way unless GTR decide otherwise.
 

AM9

Veteran Member
Joined
13 May 2014
Messages
16,019
Location
St Albans
In times of real problems, sending the 700s up/down the BML will be the quickest way to move large numbers of delayed/stranded passengers. Moving 1700+ people per train is preferable to about 1000 especially as the 700s can load and unload far quicker than a crush-loaded Electrostar. I'm sure those complaining that there aren't enough seats/tables will be a drop in the ocean of those who just want to get safely to their destination as soon as possible.
If there aren't paths available for any trains, the length/type of train is irrelevant, nobody will be going anywhere!
If a platform is 12 car length, it can accommodate up to twelve cars, (nominally 12x20m). In terms of passenger capacity, the room on one 12-car train is not going to be less than 3x4-car, 4x3-car or even 6x2-car.
 
Joined
24 Mar 2009
Messages
592
I suppose going north through the Core a wounded Class 700 can be put into the sidings at Cricklewood, but is it also possible to stable a 12-car 700 in the middle platform at Kentish Town?
 

A-driver

Established Member
Joined
9 May 2011
Messages
4,482
Only after the Canal Tunnels are commissioned, surely. Until then, I'd have thought Cricklewood was a reasonable place to dump a poorly 700.


As far as I'm aware they are commissioned. If they arnt they will be before any 700s enter service on the TL.
 

Class377/5

Established Member
Joined
19 Jun 2010
Messages
5,594
Canal Tunnels should be commissioned after the first 700 runs in service.

Cricklewood will be the place to put a failed 700 on the MML. Limping back to depot would be an overnight thing and depending on the fault either depot could take it.
 
Joined
24 Mar 2009
Messages
592
O/T I know, but would it be possible to use the Canal Tunnels for railtour purposes, such as ECML to somewhere in 3rd rail land? If so, what traction would be passed for the tunnels, the Core and the banks up to Farringdon & Blackfriars?
 

Domh245

Established Member
Joined
6 Apr 2013
Messages
8,426
Location
nowhere
O/T I know, but would it be possible to use the Canal Tunnels for railtour purposes, such as ECML to somewhere in 3rd rail land? If so, what traction would be passed for the tunnels, the Core and the banks up to Farringdon & Blackfriars?

I don't think any diesels would be OK'd to go through, so it would have to be a dual voltage unit (hooray?) or a 92. All hypothetical of course because the core will be so busy you wouldn't even be able to fit anything through it other than the service trains.
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,157
I assume there'd be some sort of 'traditional' signalling overlay for test trains, if there is a requirement to do so?
 
Last edited:

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,624
O/T I know, but would it be possible to use the Canal Tunnels for railtour purposes, such as ECML to somewhere in 3rd rail land? If so, what traction would be passed for the tunnels, the Core and the banks up to Farringdon & Blackfriars?

700s, 365s, 319s are all that were planned to be cleared. I suspect 377s, 313s and the new Moorgate line stock will be clear. Anything else will need a gauging exercise. Having walked through the tunnels myself, I suspect the issue is more likely to be the existing line south of St Pancras station than the new tunnels.
--- old post above --- --- new post below ---
I assume there'd be some sort of 'traditional' signalling overlay for test trains, if there is a requirement to do so?

Lights on sticks remain. You can see the signals on the TL core map of open train times.
 

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
30,844
Location
UK
Changing subject a bit, but how noisy are the 700s when entering St Pancras from the south? It's ear piercing now and quite horrid waiting at that end for a southbound service, so I'd hope the 700s might be a bit kinder on the ears?
 

southern442

Established Member
Joined
20 May 2013
Messages
2,266
Location
Surrey
Changing subject a bit, but how noisy are the 700s when entering St Pancras from the south? It's ear piercing now and quite horrid waiting at that end for a southbound service, so I'd hope the 700s might be a bit kinder on the ears?

Considering it's a pretty tight curve I'm doubting there will be much reduction in noise levels, maybe a bit quieter at the most.
 

Skimble19

Established Member
Joined
12 Dec 2009
Messages
1,508
Location
London
700s, 365s, 319s are all that were planned to be cleared. I suspect 377s, 313s and the new Moorgate line stock will be clear. Anything else will need a gauging exercise. Having walked through the tunnels myself, I suspect the issue is more likely to be the existing line south of St Pancras station than the new tunnels.
--- old post above --- --- new post below ---


Lights on sticks remain. You can see the signals on the TL core map of open train times.

Probably a daft question but why would 365s need to be cleared down there?
 

AM9

Veteran Member
Joined
13 May 2014
Messages
16,019
Location
St Albans
Probably a daft question but why would 365s need to be cleared down there?

So that Cambridge commuters don't have to travel on the class 700 'cattle trucks' and can continue to enjoy the luxurious accommodation that they have been accustomed to. :)
 

Hadders

Veteran Member
Associate Staff
Senior Fares Advisor
Joined
27 Apr 2011
Messages
18,106
So that Cambridge commuters don't have to travel on the class 700 'cattle trucks' and can continue to enjoy the luxurious accommodation that they have been accustomed to. :)

Not exactly luxurious - the latest refresh does see them downgraded with the removal of the carpets, fewer bay seats etc. so the introduction of the 700s is not seen as so much of a retrograde step!
 

Class377/5

Established Member
Joined
19 Jun 2010
Messages
5,594
*Points to Steam on the Met*

*Wonders at potential to up-size to rail tours through the TL Core on Sunday evenings*

Its not going to happen. Comparing to the Met is pointless as due to OHLE and Ity Th a melink design, you have to shut the Core and isolate the overheads to allow permitted diesel taction, let aloe other types. Unless its dual voltage unit then its never going to happen.


Intriguing that they seem to be moving the units in smaller sections to Aachen West, where I guess they are formed into the longer train for movement via Belgium / France.
https://www.flickr.com/photos/jeroen17/23771052194/in/photostream/

That picture is at Krefeld where the 700s are build. They are then shipped off to Wildernrath for commissioning so shouldn't be on its way here unless it went back to the factory. (That makes some sense with recent events).
 