I've heard on the grapevine via Network Rail that it'll open on 3rd Jan
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

bluenoxid

Established Member
Joined
9 Feb 2008
Messages
2,661
That's interesting. NR did say to me that it would open in January.

Will HS2 mean it gets knocked down?
 

leedslad82

Member
Joined
11 Oct 2011
Messages
186
That's interesting. NR did say to me that it would open in January.

Will HS2 mean it gets knocked down?

Images I seen show that the new entrance will stay but with the hs2 platforms where the hilton hotel and direct line offices are
 

HowardGWR

Established Member
Joined
30 Jan 2013
Messages
4,981
Images I seen show that the new entrance will stay but with the hs2 platforms where the hilton hotel and direct line offices are

Well, that's what I wrote here, but someone said I was way out. I just looked at Google Earth and Streetview. Is there a 'Leedsonian' who knows better? You just lay the Higgins report map over the Google map and it seems clear to me.
 

Iskra

Established Member
Joined
11 Jun 2014
Messages
10,701
Location
West Riding
Well, that's what I wrote here, but someone said I was way out. I just looked at Google Earth and Streetview. Is there a 'Leedsonian' who knows better? You just lay the Higgins report map over the Google map and it seems clear to me.

Leodensian, mate ;)
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,678
Location
Nottingham
I believe the southern access to the HS2 station (recent modified proposal) will largely duplicate the southern access that's about to open but further east so it doesn't require it to be demolished. I don't know, and probably nobody knows, whether the existing southern access and station bridge will be demolished.
 

johntea

Established Member
Joined
29 Dec 2010
Messages
3,044
Here is a question I conjured up last night. If there are a set of ticket barriers at this Southern entrance then how does that work with the other ticket barriers?

I can just see a lot of problems relating to 'reject passback' and swallowing tickets! Is it purely meant to be just an 'entrance' rather than an 'exit' point too?
 

61653 HTAFC

Veteran Member
Joined
18 Dec 2012
Messages
19,354
Location
Yorkshire
Here is a question I conjured up last night. If there are a set of ticket barriers at this Southern entrance then how does that work with the other ticket barriers?

I can just see a lot of problems relating to 'reject passback' and swallowing tickets! Is it purely meant to be just an 'entrance' rather than an 'exit' point too?

There's lots of stations elsewhere with exits and barrier lines in more than one place, so I don't think it'll be a major problem... That said, on Saturday evening the existing main gateline at LDS was having a number of issues with valid tickets being rejected (including my own: it seemed to think it was a weekday and was rejecting off-peak tickets) which was causing a lot of congestion at the bottom of the steps from the bridge.
 

Tim R-T-C

Established Member
Joined
23 May 2011
Messages
2,143
I had a look on Wednesday, looks pretty much complete, they were just putting up some signage, although when I was looking at the photos today, noticed this doozy:

CWvoiVyWIAEZWdc.jpg


Have dropped NR a tweet but I wonder if anyone had already seen it?
 

HowardGWR

Established Member
Joined
30 Jan 2013
Messages
4,981
I had a look on Wednesday, looks pretty much complete, they were just putting up some signage, although when I was looking at the photos today, noticed this doozy:

I looked up this word. It says "something outstanding or unique of its kind."

Now I'm confused. What did you mean? Are there such platforms? Is that it?

Perhaps there are two lifts?
 
Last edited:

CaptainHaddock

Established Member
Joined
10 Feb 2011
Messages
2,721
Here is a question I conjured up last night. If there are a set of ticket barriers at this Southern entrance then how does that work with the other ticket barriers?

I can just see a lot of problems relating to 'reject passback' and swallowing tickets! Is it purely meant to be just an 'entrance' rather than an 'exit' point too?

Yes, it looks like there's only about 8 ticket barriers so if they're set to "4 in 4 out" at peak times I can see the queues being so massive that it will be no quicker than using the existing exits even if you are heading south of the station.

A further design fault I've noticed is that passengers arriving on platforms 16 and 17 will have to go up an escalator, to go down another escalator to get to the southern exit, which seems ridiculously poorly-planned. Why on earth did they not think to have additional exit doors at platform level?
 

Haydn1971

Established Member
Joined
11 Dec 2012
Messages
2,101
Location
Sheffield
A further design fault I've noticed is that passengers arriving on platforms 16 and 17 will have to go up an escalator, to go down another escalator to get to the southern exit, which seems ridiculously poorly-planned. Why on earth did they not think to have additional exit doors at platform level?


Really ? That's really dumb ! And probably by design to reduce staffing of gates :-/
 

HowardGWR

Established Member
Joined
30 Jan 2013
Messages
4,981
Look again....closely;)


Yes I saw the confusing messages on the signs. My query was about the word 'doozy'. I didn't see how it applied (still don't).


Edit
The google entry said it was an old American term but it sounds the sort of thing with which an Australian would come out. Not English at any rate.
 
Last edited:

jayah

On Moderation
Joined
18 Apr 2011
Messages
2,057
There's lots of stations elsewhere with exits and barrier lines in more than one place, so I don't think it'll be a major problem... That said, on Saturday evening the existing main gateline at LDS was having a number of issues with valid tickets being rejected (including my own: it seemed to think it was a weekday and was rejecting off-peak tickets) which was causing a lot of congestion at the bottom of the steps from the bridge.

It has never been very good at working out what is valid or not. Usually someone has one of the side gates held open doing cursory manual checks, making the whole thing rather pointless.

What that station really needs is another entrance from Platform 8 facing towards Boar Lane instead of making everyone from the east platforms walk all the way down and back again. And some way to prevent people going from 1-5 not leaving via the gateline having to pass right across the motorway of traffic between the transfer deck and the gateline. That bit really wasn't well thought out.
 

HowardGWR

Established Member
Joined
30 Jan 2013
Messages
4,981
I think the spelling includes the "doozy".

Ah I now see the spelling mistake (myopia problem) thanks. I still don't see what 'doozy' has to do with it. What is 'outstanding or unique of its kind' in a spelling mistake?
 

Crossover

Established Member
Joined
4 Jun 2009
Messages
9,493
Location
Yorkshire
Ah I now see the spelling mistake (myopia problem) thanks. I still don't see what 'doozy' has to do with it. What is 'outstanding or unique of its kind' in a spelling mistake?

Isn't it amazing what the human mind can correct!
 

MarkRedon

Member
Joined
16 Sep 2015
Messages
292
Story in today's Yorkshire Post:

http://www.yorkshireeveningpost.co....south-entrance-to-open-this-weekend-1-7652371

Leeds train station’s new £20m south entrance to open this weekend

The new £20m Southern Entrance at Leeds train station will be unveiled to the public on Sunday, benefitting thousands of commuters.

The state-of-the-art entrance will provide a direct link to the city’s growing south bank area – saving passengers up to an hour of travelling time each week.

Up to one fifth of the station’s 100,000 daily users are expected to benefit from the entrance, which also aims to ease congestion at the existing tickets gates.

The train station is the UK’s second busiest outside London and has seen rising demand for a southern entrance with the development of major office spaces in the area such as Bridgewater Place, ASDA’s UK headquarters, Holbeck Urban Village and Leeds Dock
.

Read more: http://www.yorkshireeveningpost.co....-to-open-this-weekend-1-7652371#ixzz3w60f56h6
--- old post above --- --- new post below ---
We seem here to have another example of significant cost inflation. When the southern entrance was originally planned, it was expected to cost £15 million:

http://www.theguardian.com/leeds/2010/mar/04/leeds-station-new-entrance

That article carried the sub-heading:

Are plans a brave bid to ease congestion at station - or a £15m white elephant?

That would be even more the case if it had to be demolished to make way for the recently-proposed HS2 concourse and platforms, which must come perilously close to the new structure.
 

jayah

On Moderation
Joined
18 Apr 2011
Messages
2,057
Story in today's Yorkshire Post:

http://www.yorkshireeveningpost.co....south-entrance-to-open-this-weekend-1-7652371

.

Read more: http://www.yorkshireeveningpost.co....-to-open-this-weekend-1-7652371#ixzz3w60f56h6
--- old post above --- --- new post below ---
We seem here to have another example of significant cost inflation. When the southern entrance was originally planned, it was expected to cost £15 million:

http://www.theguardian.com/leeds/2010/mar/04/leeds-station-new-entrance

That article carried the sub-heading:



That would be even more the case if it had to be demolished to make way for the recently-proposed HS2 concourse and platforms, which must come perilously close to the new structure.

Good grief - even on todays railway that is seriously expensive.

The 2001ish redevelopment only came to £165m and that included months of overnight Transpennine diversions, resignalling, new platforms, the transfer deck, passenger lifts, more running lines and the Eastern concourse.
 

deltic08

On Moderation
Joined
26 Aug 2013
Messages
2,907
Location
North
Good grief - even on todays railway that is seriously expensive.

The 2001ish redevelopment only came to £165m and that included months of overnight Transpennine diversions, resignalling, new platforms, the transfer deck, passenger lifts, more running lines and the Eastern concourse.

£20m is enough to open three stations or three miles of reinstated railway.

I have been lobbying Leeds City Council and West Yorkshire Metro to reinstate Cross Gates-Scholes where 10,000 houses are being built each side of the trackbed and P&R provision on the A64 adjacent. Transit time by rail with one stop at Cross Gates, 9 minutes loading 500+ on each train. Transit time by bus more than double that with 80 on each bus.

Two years ago it was costed at £17m but no interest shown as it is planned to bus people into Leeds City centre. We could be looking at 2-3,000 in the peaks. That is a lot of buses in an already gridlocked Leeds.

Priorities are all wrong in West Yorkshire as far as rail is concerned.
 

bluenoxid

Established Member
Joined
9 Feb 2008
Messages
2,661
They're pinning their hopes on Leeds East Parkway.

A railway line/very high frequency connection to an appropriate point is needed for this area. I've seen the estates going up (they're massive) and I'm shocked that they think it will work without a heavier form of transport.
 