That's interesting. NR did say to me that it would open in January.
Will HS2 mean it gets knocked down?
Images I seen show that the new entrance will stay but with the hs2 platforms where the hilton hotel and direct line offices are
Well, that's what I wrote here, but someone said I was way out. I just looked at Google Earth and Streetview. Is there a 'Leedsonian' who knows better? You just lay the Higgins report map over the Google map and it seems clear to me.
Thanks mate.Leodensian, mate![]()
Thanks mate.![]()
Here is a question I conjured up last night. If there are a set of ticket barriers at this Southern entrance then how does that work with the other ticket barriers?
I can just see a lot of problems relating to 'reject passback' and swallowing tickets! Is it purely meant to be just an 'entrance' rather than an 'exit' point too?
Leodensian, mate![]()
I was grateful to @Iskra. At least we've moved on from the down-market catering facilities!Thought it was Leodian.

Thought it was Leodian.
Leodensian, mate![]()
I had a look on Wednesday, looks pretty much complete, they were just putting up some signage, although when I was looking at the photos today, noticed this doozy:
Look again....closely...Now I'm confused. What did you mean? ...
Here is a question I conjured up last night. If there are a set of ticket barriers at this Southern entrance then how does that work with the other ticket barriers?
I can just see a lot of problems relating to 'reject passback' and swallowing tickets! Is it purely meant to be just an 'entrance' rather than an 'exit' point too?
A further design fault I've noticed is that passengers arriving on platforms 16 and 17 will have to go up an escalator, to go down another escalator to get to the southern exit, which seems ridiculously poorly-planned. Why on earth did they not think to have additional exit doors at platform level?
Look again....closely![]()
I think the spelling includes the "doozy".Yes I saw the confusing messages on the signs. ...
There's lots of stations elsewhere with exits and barrier lines in more than one place, so I don't think it'll be a major problem... That said, on Saturday evening the existing main gateline at LDS was having a number of issues with valid tickets being rejected (including my own: it seemed to think it was a weekday and was rejecting off-peak tickets) which was causing a lot of congestion at the bottom of the steps from the bridge.
I think the spelling includes the "doozy".
Ah I now see the spelling mistake (myopia problem) thanks. I still don't see what 'doozy' has to do with it. What is 'outstanding or unique of its kind' in a spelling mistake?
.Leeds train stations new £20m south entrance to open this weekend
The new £20m Southern Entrance at Leeds train station will be unveiled to the public on Sunday, benefitting thousands of commuters.
The state-of-the-art entrance will provide a direct link to the citys growing south bank area saving passengers up to an hour of travelling time each week.
Up to one fifth of the stations 100,000 daily users are expected to benefit from the entrance, which also aims to ease congestion at the existing tickets gates.
The train station is the UKs second busiest outside London and has seen rising demand for a southern entrance with the development of major office spaces in the area such as Bridgewater Place, ASDAs UK headquarters, Holbeck Urban Village and Leeds Dock
Are plans a brave bid to ease congestion at station - or a £15m white elephant?
Story in today's Yorkshire Post:
http://www.yorkshireeveningpost.co....south-entrance-to-open-this-weekend-1-7652371
.
Read more: http://www.yorkshireeveningpost.co....-to-open-this-weekend-1-7652371#ixzz3w60f56h6
--- old post above --- --- new post below ---
We seem here to have another example of significant cost inflation. When the southern entrance was originally planned, it was expected to cost £15 million:
http://www.theguardian.com/leeds/2010/mar/04/leeds-station-new-entrance
That article carried the sub-heading:
That would be even more the case if it had to be demolished to make way for the recently-proposed HS2 concourse and platforms, which must come perilously close to the new structure.
Good grief - even on todays railway that is seriously expensive.
The 2001ish redevelopment only came to £165m and that included months of overnight Transpennine diversions, resignalling, new platforms, the transfer deck, passenger lifts, more running lines and the Eastern concourse.