Iskra
Established Member
There's already a direct Sheffield-Carlisle service via the S & C but it only runs once each way on a Sunday.
It dwells unnecessarily for 17 minutes on route and runs twice a week. It's hardly a proper service is it...
There's already a direct Sheffield-Carlisle service via the S & C but it only runs once each way on a Sunday.
I recall getting a through train from Appleby to Nottingham back in the 1970s. Loco hauled Mk.2s!Or maybe extend some of the Nottingham-Leeds services to Carlisle via the S & C?
It's mentioned here, http://www.railforums.co.uk/showpost.php?p=2389043&postcount=90, but I think that's meant to be a historical reference to the franchise operator coming full circle (for the North East operation), and Arriva's previous use of class 37s on the S&C during 2004.
Has there been any word regarding improvements to catering services? The Settle-Carlisle route could do with having more trains with catering. The Carlisle-Newcastle has no catering whatsoever. The Cumbrian coast could also do with catering, they'd make a fortune if every basher bought just one cup of tea!
On that background, I'm not sure we should be scrapping any Pacers quite yet.
Currently the S&C catering is provided by volunteers (the Friends of Settle Carlisle railway?) so improved catering would depend on them. I personally would like catering on Middlesbrough to Newcastle routes and Newcastle to Carlisle too.
Catering is provided by the Settle-Carlisle Railway Development Company. Improved catering on trains is great (and appreciated when good service is provided) but can be difficult to get adequate returns.

Hmm they wont achieve this by stopping at every station. The line would be much better operated by running Sheffield-Worksop/Retford stoppers and then Sheffield-Worksop-Retford-Gainsborough LR-Saxilby-Lincoln only services anyway, IMO. How many people at Kiveton Park and Shireoaks want to go as far as Lincoln? Cant wager many and if they do they can change at Worksop or Retford.
Lincoln-Sheffield will become part of the Northern Connect network, operated by new trains, with a minimum of 10 trains per day in each direction running through to Meadowhall, Barnsley, Wakefield and Leeds
Just realised Leeds to Nottingham is to be Bradford to Leeds to Wakefield Westgate to Nottingham.
Just realised Leeds to Nottingham is to be Bradford to Leeds to Wakefield Westgate to Nottingham.
Just realised Leeds to Nottingham is to be Bradford to Leeds to Wakefield Westgate to Nottingham.
Yup, although Barnsley seemingly gains an extra Leeds-Sheffield semi fast service to make up for it.
Strictly speaking, the current Leeds to Nottingham via Barnsley is diverted to Lincoln. The new service is the Bradford to Nottingham via Leeds and Wakefield Westgate.
There's an announcement of a new Sheffield-Bradford. Does anyone know if that's via Leeds or via Brighouse?
Considering the Northern franchise is slightly similar to the Scotrail franchise I am still quite surprised by the complete lack of catering commitments required. Scotrail has catering on trains (156s, 158s) going to all corners of the network: Wick/Thurso, Kyle, Oban, Mallaig and soon Dumfries, as well as their intercity routes. Yet Northern have nothing! Northern have a number of routes that would benefit from a franchise catering commitment. I guess if you're not used to catering the lack of it wont bother you much. Just remember to take a flask when you travel with Northern!
I've worked out what the 12 x Northern Connect routes will be:
Manchester Airport to Barrow (new DMUs)
Manchester Airport to Windermere (new EMUs)
Manchester Airport to Blackpool (new EMUs)
Manchester Airport to Liverpool via Warrington (new DMUs)
Chester to Leeds via Bradford (new DMUs)
Liverpool to Leeds via Bradford (new DMUs)
Manchester Airport to Leeds via Bradford (new DMUs)
Leeds to Lincoln via Sheffield (new DMUs)
Sheffield to Scarborough (new DMUs)
Middlesbrough to Newcastle (refurbished 158s)
Newcastle to Carlisle (refurbished DMUs - 158s?)
York to Blackpool (new DMUs)
Only the Liverpool/Wigan-Airport will be EMUs until TP wiring is complete
Presumably the services on the western end of the line are unchanged, plus an occasional TPE Liverpool-Wigan-Glasgow.
Will the Wigan services extend to Windermere in certain hours (the Windermere text does not specify a route)?
This also looks like Wigan's only Airport service (ie none via Bolton/Atherton).
This also means no direct Southport-Airport service (diverted via the Calder Valley instead?).
Presumably all this assumes the Ordsall Chord and Huyton 4-tracking will be finished, plus the very vague "Manchester-Bradford journey time improvements".
Considering the Northern franchise is slightly similar to the Scotrail franchise I am still quite surprised by the complete lack of catering commitments required. Scotrail has catering on trains (156s, 158s) going to all corners of the network: Wick/Thurso, Kyle, Oban, Mallaig and soon Dumfries, as well as their intercity routes. Yet Northern have nothing! Northern have a number of routes that would benefit from a franchise catering commitment. I guess if you're not used to catering the lack of it wont bother you much. Just remember to take a flask when you travel with Northern!
4tph via Atherton including Barrow and Windermere services
I've worked out what the 12 x Northern Connect routes will be:
Manchester Airport to Barrow (new DMUs)
Manchester Airport to Windermere (new EMUs)
Manchester Airport to Blackpool (new EMUs)
Manchester Airport to Liverpool via Warrington (new DMUs)
Chester to Leeds via Bradford (new DMUs)
Liverpool to Leeds via Bradford (new DMUs)
Manchester Airport to Leeds via Bradford (new DMUs)
Leeds to Lincoln via Sheffield (new DMUs)
Sheffield to Scarborough (new DMUs)
Middlesbrough to Newcastle (refurbished 158s)
Newcastle to Carlisle (refurbished DMUs - 158s?)
York to Blackpool (new DMUs)
Do you have a source for that?
I know the trains used on such services will have to provide a catering service, wi-fi and plug sockets but not the stations.
that MetroCentre and Hexham will become Nborthern Connect stations, open from 6am until 10pm with free Wi-Fi and refreshments available for purchase
I still remain to be convinced that there is NO difference in what it describes as 'New' and 'Brand New' and that the 'New' might mean new to Northern and end up being 185's or 170's, not that I would be unhappy with that if that was the case.
So Windermere is being electrified but its Manchester service sent via Atherton rather than Bolton, is that right? The interactive map certainly suggests that, but maybe it goes via Golborne/Parkside Jns.
The section on improvements to the Newcastle - Carlisle line includes a statement about Northern Connect stations on that route - I imagine theat is the spec for others as well
Yes, I think there is a good chance there is a distinction here, and "new" means "not old" i.e. "not Class 15x".