Between Moat lane Junc and Newtown there are piles of new steel sleepers placed alongside the track.
At Caersws there are piles of new concrete sleepers ready to be used, as well as bags on new ballast.
There are also bridge works going on at one of the Severn Bridges outside Newtown, and by the new Mart of Welshpool.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Gareth Marston

Established Member
Joined
26 Jun 2010
Messages
6,231
Location
Newtown Montgomeryshire
Between Moat lane Junc and Newtown there are piles of new steel sleepers placed alongside the track.
At Caersws there are piles of new concrete sleepers ready to be used, as well as bags on new ballast.
There are also bridge works going on at one of the Severn Bridges outside Newtown, and by the new Mart of Welshpool.

Yes I've clocked them to and rail/road vehicles at Newtown.
 

atillathehunn

Established Member
Joined
6 Jan 2010
Messages
1,525
Location
NL
Third-world railway!? Grow up.

Here's an actual third world railway. I know the Cambrian has a bit of a rough time funding wise, but not quite this level ;) This line does have steel sleepers though (you can't quite see it on this photo). I spent many years in this village, which is just outside Kisumu, Kenya.

Incidentally, the train to Butere (where this photo is taken) was delayed by about three days due to derailing in the valley.
 

Attachments

  • Butere (2).jpg
    Butere (2).jpg
    68.5 KB · Views: 49

The Informer

Member
Joined
2 May 2011
Messages
344
Location
Roy's Rolls Cafe
There are also bridge works going on at one of the Severn Bridges outside Newtown, and by the new Mart of Welshpool.

The little longitudinal bridge is being removed at the back of the Market, not sure about the Newtown end but judging by the amount of bagged ballast delivered i reckon it's being filled in also.
 

Llanigraham

On Moderation
Joined
23 Mar 2013
Messages
6,488
Location
Powys
The little longitudinal bridge is being removed at the back of the Market, not sure about the Newtown end but judging by the amount of bagged ballast delivered i reckon it's being filled in also.

If they filled it in they'd be damming the Severn!
 
Status
Not open for further replies.

Top