AGA don't have 158/159s though so wouldn't there be kerfuffle and red tape for safety cases etc?
probably a silly question but could you not trim the leaves of a tree with a strimmer, like a hedge, before they fall off?
No, they've always operated 158s - the first Lowestoft and back from Norwich has been an EMT 158 with Anglia crew for years. They spot hire one from time to time if they're stuck in the evening.
probably a silly question but could you not trim the leaves of a tree with a strimmer, like a hedge, before they fall off?
Not quite as dumb as it sounds.
There have been pictures of other lines in recent times where the tree foliage is so close to the track they obscure signals.
Have NR cut downon tree maintenance this year I wonder?
Not quite as dumb as it sounds.
There have been pictures of other lines in recent times where the tree foliage is so close to the track they obscure signals.
Have NR cut downon tree maintenance this year I wonder?
So are there enough DMU's back to run a service tomorrow, or more buses?
Abellio Greater Anglia would like to advise customers that from Monday 23 November, Great Yarmouth to Norwich, Ipswich to Felixstowe and Sudbury to Marks Tey train services will be restored.
From Abellio`s website confirming that there will be trains from Monday.
Sam
No trains on Ipswich - Peterborough though as it currently stands, also from the Abellio Greater Anglia website.
Doubtful.Heard a conductor this morning say that 2 units are on their way here from
Scotrail!
Well bearing in mind scotrail is tight on stock at the moment as it is I doubt that as its not even like the DfT can force it as transport is devolved. Unless they are talking about the scotrail units Southern took and seem determined not to use but southern seem to want them sitting around doing nothing.
sng7 said:but southern seem to want them sitting around doing nothing.
No trains on Ipswich - Peterborough though as it currently stands, also from the Abellio Greater Anglia website.
For AGA to use any of the Southern units, would their staff need to do any kind of "changeover" course (assuming that Southern would even loan them the units in the first place)?
Ah, but the 171s have Dellner couplings, meaning you'd need to take a whole new unit learning course...
I am not an engineer but I would have thought it would take a couple of hours to reprofile the wheels, Vids on you tube look like the reprofile is done on something like a MOT rolling road.
If they put all the staff on max overtime it would not take a week to do the DMU s. I understand they have other stock to do but if you could run the machine say 16 hrs per day on 2 shifts you could do a lot of stock
Abellio Greater Anglia has cancelled trains due to "poor rail conditions"
Train services across the East have been cancelled because light diesel trains are being damaged by mulched leaves, according to a rail expert.
Abellio Greater Anglia (AGA) has stopped services on lines between Norwich and Great Yarmouth, Ipswich, Felixstowe, Cambridge and Peterborough.
Philip Sutton, editor of Rail Exclusive, said leaves lodged in wheels often catch fire, causing damage.
AGA said up to two damaged trains per day were having to be withdrawn.
This has led to service cancellations across the network.
'Poor rail conditions'
Mr Sutton said: "Trains are lighter now so they don't squash the leaves as the heavier trains used to.
"If leaves get caught between the steel wheels it burns and causes stresses on the wheel."
Network Rail, which is responsible for ensuring tracks are clear, said is is running extra rail clearing trains.
A spokesman said: "We are doing everything we can to minimise disruption and will continue to work with Abellio."
An AGA statement added: "The problems are due to some of our diesel trains suffering wheel damage, as a result of poor rail conditions."
The company said it is working with Network Rail to "improve rail conditions to prevent further damage" and restore a normal service.