Would you support any of the routes I listed?
It depends on how viable they are, certainly I doubt Skipton - Colne, York - Beverley, and Penrith - Keswick would meet my criteria.
Last edited:
Would you support any of the routes I listed?
Would you support any of the routes I listed?
Well it's true. There is usually a reason or other why individual lines and stations shouldn't close. The biggest one of all though, is that if you make it easy to close a lightly used route, it makes it easier to close less lightly used routes. Nobody really trusts Government not to go too far. It seems to me to be a good strategy to ensure that closures remain as politically toxic as possible.
Newhaven Marine is a case in point. It is basically closed. You can't buy a ticket there, so Southern doesn't have to even run it's replacement taxi service. With the status quo, Southern keeps it's handy reversing siding, the official closure process remains difficult and nothing untoward changes. The only people who lose out in this scenario are those with an agenda to make closure easier elsewhere.
Don't tar us all with the same brush. Some of us are not looking at the UK rail network with tunnel vision, some of us look at the social implications (easier if it's a local route to be fair) and purposes other than just passenger trains where applicable.
Here's a thought, Marylebone was going to close once upon a time, to become a bus/coach station. Now look at it, it and the route through the Chilterns serves a very well used part of the network which we wouldn't be without these days. I therefore suggest that even a station closure needs to be incredibly carefully considered, let alone a route closure.
Drastic improvements in certain places make the world of difference. I still stand by my long-standing view that re-doubling Shelwick Junction (north of Hereford) to Ledbury would make a massive difference to performance levels, as well as open up opportunity for more services. Even just a passing loop would help a fair bit, although not by as much as re-doubling the relevant 11.5 or so miles of route. Mind you, a passing loop at Colwall would be good too, no long waits at Malvern Wells for a late running eastbound train.
Quite, further east we could easily have performance levels increase by having the crossovers between the single line sections from Henwick to Worcester Foregate Street moved, put them east of the platforms instead. Further east again, re-doubling the line west from Evesham to Worcester (I've forgotten the junction name) would get rid of that stupidly annoying wait at Evesham for eastbound trains when you're heading west. We got rid of the wait at Evesham when the route was re-doubled to Ascott under Wychwood, now we just want to get the other bits done!
Having morning trains between Hereford and Worcester (and onwards to Birmingham) on Sundays have proved to be very popular and well worth the investment made. The only other thing we need now is throgh ticketing onto country buses at Hereford, and improved connections that are reliable.
70014 Iron Duke, I take issue with your suggestion that Llan'dod (locally used way of saying Llandrindod, before anyone asks) and Llandovery is not necessary. I highly recommend you thoroughly read my post on page 6 of this thread on the issue, I look forward to reading your reply! Llangraham (sorry if I've spelt that wrong!) is clearly local to the line and area, he knows what he's on about with the Central Wales/Heart of Wales line!
Personally, I think the line in the UK with the best business case of all is from Edinburgh to Perth via Halbeath and Kinross.
True if you want to reinstate it following the original alignment. However, use an alignment 5m or so to the left and the costs come down significantly.You are aware that to reinstate the line, the M90 needs to be re-routed for a significant distance of its length, aren't you ?
The best business case for what though, on what figures ?
You are aware that to reinstate the line, the M90 needs to be re-routed for a significant distance of its length, aren't you ?
True if you want to reinstate it following the original alignment. However, use an alignment 5m or so to the left and the costs come down significantly.
Station I'd close - Tees-side Airport
Worle to Burnham old line (not via Weston Super Mare).
Worle to Burnham old line (not via Weston Super Mare).
Let's save some time - if you want a purely financial railway it will look something like this:
Let's look at it another way. If you had to close a railway line in the UK, which would you get rid of? (Excluding Newhaven Marine, obviously).
Station I'd close - Teesside Airport
Line I'd close - Bromley North line
Bear in mind, that's the Plan B map which retained some unprofitable lines where the impact of closure would have resulted in unpalatable side effects such as excessive traffic congestion.Wow, that's surprising. Even Serpell wanted to keep the Uckfield Line!
Why is everyone basing Line Closures on Passenger Numbers. SOME of these routes are key for freight, even if they are not for passengers. Take the S&K between Moorthorpe via Baghill to Milford. If this line was shut, as has been suggested, all the freight would end up on the already busy West Riding to Hare Park competing with East Coast Trains, other freight, and succesfully busy stoppers between Donny/Sheff to Leeds. Maybe this should be about Station Closures, not Line Closures? Just because a line does not see many passenger trains/passengers, does not mean it is not vital to freight! But, then again, i work for the railway, so know that keeping a railway open is about a lot more than how many passengers use Pontefract Baghill, or Garsdale. FREIGHT. Nobody ever sees the bigger picture, bringing it back to if the S&K was shut, the problems then go right back to Masborough Junction (Rotherham), because then all the freight has to be regulated as far as at least Hemsworth Loop which is already busy. Moorthorpe Loop is too short to be practical. So freight would potentially need a clear run all the way from Rotherham to Hare Park, dodging highspeed trains, commuter trains and freight already pathed that way. Impossible. But hey, just because Baghill is quiet with passengers.
70014 Iron Duke, I take issue with your suggestion that Llan'dod (locally used way of saying Llandrindod, before anyone asks) and Llandovery is not necessary. I highly recommend you thoroughly read my post on page 6 of this thread on the issue, I look forward to reading your reply! Llangraham (sorry if I've spelt that wrong!) is clearly local to the line and area, he knows what he's on about with the Central Wales/Heart of Wales line!
A lot of people suggesting the Barton Line for closure which probably doesn't make a huge amount of sense. The line could be quite easily run without signalling and would be probably never need to be electrified as a battery EMU would probably be sufficient.
The line also surves rural communties with poor road connections. Goxhill and New Holland generate 20,000 pasangers each.
The line is a strange case but shutting it completely is not the answer. As with most lines mentioned on this thread there should be efforts to rationalise, increase efficiency and develop revenue streams. For example basing units at Cleethorpes would be a good start. Using tram trains or similar lighter weight vehicles and increasing the fequemcy is another way to cut cost and boost revsnue.
The signalling will soon be done from York ROC so wont be so much of a worry regards signal box staffing cost
Apologies if this has been done before, but which rail line in the UK do people think has the best case for closure?
Personally, I would guess that the Fishguard branch, the Heysham branch and the Stranraer branch have the best cases for closure - they won't close because of the sheer effort and money involved, but they're the most likely to, I guess.
...
70014 Iron Duke, I take issue with your suggestion that Llan'dod (locally used way of saying Llandrindod, before anyone asks) and Llandovery is not necessary. I highly recommend you thoroughly read my post on page 6 of this thread on the issue, I look forward to reading your reply! Llangraham (sorry if I've spelt that wrong!) is clearly local to the line and area, he knows what he's on about with the Central Wales/Heart of Wales line!
I'm going to weigh in here purely from the comments on the Heart of Wales line.
tbtc does not know the line whatsoever, this is obvious from the comments he made on it. Same for 70014 Iron Duke. I might not use it too often, due to connecting buses being stripped out, but even the central section is well used in my experience even in winter.
Buses would not provide an acceptable alternative, that much is a promise. It's also worth noting it's not like the roads are that great in many places along that route, ertainly they're not fast ones! Adding more traffic to these areas is simply a nonsense idea, the area especially through the Llanwrtyd area can get pretty busy in the summer. I haven't been on the roads around there for ages so if it's got better in the last few years then my bad.
My point is that section is well used for sure.
It's worth pointing out that closing that bit would mean no rail route all the way to Builth Road for the Royal Welsh Show. Yes I know that's only once a year for a few days, but it does bring in a large amount of people to the line.
Did I seriously see a suggestion that people from Llandod going to Swansea would be better off going via Craven Arms then down via Cardiff? Outrageous comment of the week! For one, that would take quite some time, and for two the fares to do that would be quite significantly higher than via Llandovery, so no-one would make the journey!
ie he does not say: I use the line every week/month or some such, right? sounds more like 3-4 times a year max. Which is, possibly, part of the problem. ie even those that live in the area only use the HoWL as a last ditch solution for transport, probably because it's so slow and inconvenient.
You "take issue" ? Of course, this is a discussion forum.
"Llangraham (sorry if I've spelt that wrong!) is clearly local to the line and area, he knows what he's on about with the Central Wales/Heart of Wales line!"
Except, if you read his posts, he says "every time I've used it" - it doesn't sound that often, does it?
ie he does not say: I use the line every week/month or some such, right? sounds more like 3-4 times a year max. Which is, possibly, part of the problem. ie even those that live in the area only use the HoWL as a last ditch solution for transport, probably because it's so slow and inconvenient.