Same site as the previous proposal, between Lowfields Way and the River Calder. Its the only possible site in Elland, the only alternative was the old Greetland site.
Its a pretty awful site between an out of town business park, the river and an elevated dual carriagway, which cuts it off from the town. That it would be effectively be a park and ride only station was a major reason why it was cancelled previously. However there are now improved plans for new access routes from the town, better bus provision and even a new footbridge/cyclepath over the river to a new planned development etc.
More details can be found in the current request for budget approval for detailed design work on the
WYCA site. GRIP 1-4 due to complete Dec 2018, but Network Rail can't start work on building it until 2021.