Yeah much better to scrap the perfectly usable 143/144s and then try to squeeze everyone into a crush loaded 150 etc (if they can physically get on) than travel on a 143/144 (refurbished or not) wouldn't they! :roll:
Scrapping 442s, yes I wouldn't argue with that, but scrapping the 144s when they still have useful life in them yet is stupid.
So we want to keep trains in service which will carry the same number of passengers as a double decker bus but want to scrap newer trains which can carry the same number of passengers as four double decker buses because the recycled electrical equipment is life-expired? That's a good way to ensure the overcrowding problem is never solved.
--- old post above --- --- new post below ---
Pacers have the benefit of being here already and could be compliant with all legal requirements (including DDA 2020 if it needs to be spelt out separately for some) with relatively low-cost modification.
It's been pointed out numerous times before that the ePacer will not be 100% complaint and that Porterbrook were hopeful of getting minor exemption orders from the Secretary of State for Transport.
You're also ignoring the fact that the ePacer project will affect a maximum of 46 Pacers, when in total there are 140 Pacers. 94 Pacers need replacing regardless.
The cost of a fully compliant DMU design in relatively small quantities may be far above expectations and may signal a further push to release more existing stock by advancing the electrification programme.
Advancing the electrification programme by a year or two would only put it back on schedule! Manchester-York electrification was due by December 2018, DfT said in the TPE ITT it will happen after December 2020, with Roger Ford suggesting it'll be December 2021.
Don't forget as well as the Pacers there's almost 140 class 150s which will need replacing at some point in the not too distant future.