Could potentially get more 350's onto TPE though... I'm not allowed that familiar with LM, what stopping patterns do their 350's use ?

Near enough all Euston services and all Liverpool services are 350, a few are 321, soon to be 319.

It is I suppose possible that the Tring stopper diagrams going over to Crossrail using Crossrail stock would release some 350s, but more likely it'd just allow the more sensible option of going all-350 on the remaining LM WCML services.

Off topic though, so I guess if we want to go further on it a new thread should be created.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

HowardGWR

Established Member
Joined
30 Jan 2013
Messages
4,981
Mark Hopwood's quote is
"The Great Western network is already seeing the biggest investment since Brunel, and this deal has been designed to match that investment and ambition. "

I would have thought that, in proportion, the Edwardian expansion of the GWR was of a far greater degree (much in permanent infrastructure, new lines, rather than just modern stock) than what is taking place here.
 

WelshBluebird

Established Member
Joined
14 Jan 2010
Messages
5,581
The 165 fleet will remain as 2+3 for suburban seat capacity reasons. SDO is also being fitted to the Turbo fleet.

Don't like the sound of that if they are to be used on the Cardiff-Portsmouth run. Surely that is too long a journey for commuter style seating?
 

387star

On Moderation
Joined
16 Nov 2009
Messages
6,665
Don't like the sound of that if they are to be used on the Cardiff-Portsmouth run. Surely that is too long a journey for commuter style seating?

The 166s will get new air con and mostly 2 plus 2 seating according to earlier posts
 

sprinterguy

Veteran Member
Joined
4 Mar 2010
Messages
11,567
Location
Macclesfield
Don't like the sound of that if they are to be used on the Cardiff-Portsmouth run. Surely that is too long a journey for commuter style seating?
It's not ideal but I would certainly much prefer the 3+2 seating of a 165 over the 3+2 seating of the 150s that crop up on the route at present. And with five carriage trains the services will be much less crowded and three of those carriages, the 166s, will have 2+2 seating anyway.
 

387star

On Moderation
Joined
16 Nov 2009
Messages
6,665
Will the likes of Warminster be lengthened as currently a 158 and 150 struggle to fit though I appreciate that's six coaches so the turbos should fit fine at all stops bar the usual suspects ie avoncliff ?

Regarding Basingstoke electrification will the wires run straight into the bay platform at Basingstoke or will the trains switch to third rail ?

Oxford to Banbury: has this got the go-ahead for electrification?
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
Will the likes of Warminster be lengthened as currently a 158 and 150 struggle to fit though I appreciate that's six coaches so the turbos should fit fine at all stops bar the usual suspects ie avoncliff ?

Regarding Basingstoke electrification will the wires run straight into the bay platform at Basingstoke or will the trains switch to third rail ?

Oxford to Banbury: has this got the go-ahead for electrification?

Network Rail's CP5 infrastructure plan should have the answers: http://www.networkrail.co.uk/cp5-delivery-plan/cp5-enhancements-delivery-plan.pdf

Can't see any mention of Warminster.

DfT have told Network Rail 12 car 319s need to be allowed for on the following

Core routes
• Paddington to Oxford.
• Slough to Windsor and Eton Central.
• Maidenhead to Marlow.
• Twyford to Henley.
• Reading to Newbury.
• Reading to Basingstoke.
Diversionary routes
• Acton East to North Pole junction.
• Reading West Curve

Given a 387 or 365 is the same length as a 319 I don't think the change in type of EMU will cause any changes to that.
 

Hartington

Member
Joined
5 Jul 2013
Messages
165
The recent application by SWT to operate around what I might call the Salisbury/Yeovil/Castle Cary/Westbury/Salisbury square does anyone have a view how this may fit in (or not) with the new service patterns once the Hitachis arrive?
 

iantherev

Member
Joined
3 Apr 2011
Messages
803
Location
Brecon Beacons
The recent application by SWT to operate around what I might call the Salisbury/Yeovil/Castle Cary/Westbury/Salisbury square does anyone have a view how this may fit in (or not) with the new service patterns once the Hitachis arrive?

As the paths down the B&H are already there and used for route refreshining, I shouldn't think it will make that much difference.

(Tries not to import discussion on the B&H is a white elephant from another thread, walks away whistling.....;))
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
Wait, Maidenhead to Marlow to be prepared for 12x20m EMUs? Really? that's what that quote seems to say jcollins
 

sprinterguy

Veteran Member
Joined
4 Mar 2010
Messages
11,567
Location
Macclesfield
Will the likes of Warminster be lengthened as currently a 158 and 150 struggle to fit though I appreciate that's six coaches so the turbos should fit fine at all stops bar the usual suspects ie avoncliff ?
I don't know about Warminster specifically, but the West of England DMU Capability Works initiative, contained within the linked CP5 delivery plan (page 102) allows for the following:
a review of station operations at all stations where cascaded DMU trains are due to stop; this may result in platform extensions; selective door opening; revisions to permissive working for attaching; detaching; platform sharing arrangements and alterations to signal controls and signal locations to deal with changes to train operations.
This covers the following routes as a priority:
Group 1 – Core routes (clearance required by December 2016)
• Bristol Temple Meads (BTM) to Cardiff Central.
• Avonmouth to Bristol Parkway plus the Filton chords.
• BTM to Portsmouth.
• BTM to Worcester (including Gloucester).
• Bristol TM to Weymouth.
• BTM to Severn Beach.
• BTM to Portishead (*noting MetroWest Phase 1 proposals).
• BTM to Exeter St Davids (including Weston–super-Mare).
• Routes to and from Bristol St Phillips Marsh depot.
• Swindon to Standish junction.
• Swindon to Salisbury.
• Brighton to Portsmouth.
• Southampton to Poole.
 

jimm

Established Member
Joined
6 Apr 2012
Messages
5,276
Will the likes of Warminster be lengthened as currently a 158 and 150 struggle to fit though I appreciate that's six coaches so the turbos should fit fine at all stops bar the usual suspects ie avoncliff ?

Regarding Basingstoke electrification will the wires run straight into the bay platform at Basingstoke or will the trains switch to third rail ?

Oxford to Banbury: has this got the go-ahead for electrification?

Platform lengths are why the Turbos will be getting selective door locks, as noted above by Clarence Yard.

Basingstoke, no idea, but I doubt they would want to go to the expense of wiring the junction and parts of the main line at this stage if they can just use the bay.

Oxford-Banbury will be done at some point in the future as part of the Electric Spine scheme. The FGW Oxford-Banbury stopping service is pretty sketchy, about a dozen trains each way daily, so not worth wiring just for that.
 

387star

On Moderation
Joined
16 Nov 2009
Messages
6,665
Thanks out of interest avon cliff

Is a big reason why it isn't a request stop because there is a platform starting signal on the down? Though it can be quite busy at times with cyclists
 

fgwrich

Established Member
Joined
15 Apr 2009
Messages
10,630
Location
Hampshire
Platform lengths are why the Turbos will be getting selective door locks, as noted above by Clarence Yard.

Basingstoke, no idea, but I doubt they would want to go to the expense of wiring the junction and parts of the main line at this stage if they can just use the bay.

Oxford-Banbury will be done at some point in the future as part of the Electric Spine scheme. The FGW Oxford-Banbury stopping service is pretty sketchy, about a dozen trains each way daily, so not worth wiring just for that.

I reckon that we will see at least 1 if not 2 of the through platforms wired or even part wired up, as it's not too uncommon to arrive at Basingstoke to see one of the Sprinter twins or a Turbo in 1-4 as well as their usual Platform 5 Bay. Then again, I wonder if the reason as to why Basingstoke is being left till almost last is to fit in with the proposed Basingstoke remodelling NR are keen on (Through platforms reconnected around the back of the station etc...)

What I now wonder, Is how FGW will roll out the GWR brand given a fairly number of the fleet is coming back in Dynamic Lines or Plain Blue at the moment. Can't say I'm that impressed by the artists renditions posted above, i'll reserve final judgment when the first refurbished Sleeper returns in July painted in it. It is Somewhat ironic that Green & Pale White/Cream is making another comeback on the Great Western again though!

I'm also now told that because of the tighter deadline of the IEP2s for the GW, they will be built in Hitachi's Kasado Factory and will be shipped over here as complete trainsets.
 
Last edited:

jimm

Established Member
Joined
6 Apr 2012
Messages
5,276
I reckon that we will see at least 1 if not 2 of the through platforms wired or even part wired up, as it's not too uncommon to arrive at Basingstoke to see one of the Sprinter twins or a Turbo in 1-4 as well as their usual Platform 5 Bay. Then again, I wonder if the reason as to why Basingstoke is being left till almost last is to fit in with the proposed Basingstoke remodelling NR are keen on (Through platforms reconnected around the back of the station etc...)

What I now wonder, Is how FGW will roll out the GWR brand given a fairly number of the fleet is coming back in Dynamic Lines or Plain Blue at the moment. Can't say I'm that impressed by the artists renditions posted above, i'll reserve final judgment when the first refurbished Sleeper returns in July painted in it. It is Somewhat ironic that Green & Pale White/Cream is making another comeback on the Great Western again though!

I'm also now told that because of the tighter deadline of the IEP2s for the GW, they will be built in Hitachi's Kasado Factory and will be shipped over here as complete trainsets.

I know that use of the bay is not a hard and fast rule but if cost is a concern - as it clearly is with the current state of the GW electrification - then why bother wiring the junction and main line platforms, when you can get it done on somebody else's tab for the Electric Spine, especially with the possible remodelling on the agenda as well?

Re construction in Japan, Paul Clifton said that was the plan in a report on BBC South Today last night - still on iPlayer at the moment. Not surprising as Newton aycliffe will be presumably be busy with the other IEP orders and Scotrail emus.
 
Last edited:

Class377/5

Established Member
Joined
19 Jun 2010
Messages
5,594
Mark Hopwood's quote is
"The Great Western network is already seeing the biggest investment since Brunel, and this deal has been designed to match that investment and ambition. "

I would have thought that, in proportion, the Edwardian expansion of the GWR was of a far greater degree (much in permanent infrastructure, new lines, rather than just modern stock) than what is taking place here.

The eletrification And resignalling work is all being done, the stock is the finalpiece ofthe puzzle, so it's quite true this is the biggest investment in the time since it was built.
 

Xavi

Member
Joined
17 Apr 2012
Messages
854
Baseline B&H AT300 proposal is hourly Exeter - London semi-fast (typically 2 hr 29 min). Bi-hourly Penzance - London (hourly up early morning / hourly down late afternoon) with Plymouth - London in the gaps (Exeter - London 2 hr 9min stopping Tiv, Taunton, Reading). The semi-fasts will have a 10 min connection at Exeter into the Plymouth/ Penzance fasts.

Semi-fasts would be 6 x 9-car units (heavy Wiltshire loadings). Penzance is 6 x 5-car with 4 x 2 x 5-car (8 units) on the Plymouth cycle and extra 4 x 5-car Plymouth portions on the Penzance trains. So 18 x 5-car and 6 x 9-car for base service plus maintenance. Torbay extensions and extra evening / morning Frome will be one more 5-car (likely to be swapped with 9-car on lightly used semi-fast diagram).

Or the DfT may say no...
 

ADRboy

Member
Joined
13 Jul 2008
Messages
160
On the Avantix replacement point. ScotRail are due to have it in place by summer 2016. Smartphone powered.
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,052
Location
Reston City Centre
How nice to see a thread about the south west without the Crayonista stuff about Okehampton/ Waterloo to Barnstaple/ finding a future for 222s/ fanboy posts about the LSWR...

A few thoughts:

Firstly, a five coach IEP-style train is going to be 130m long – given the space “wasted” by doors in shorter carriages, that may mean that a five coach IEP has more seats than a conventional six coach DMU – and a five coach IEP could have more than half the seating of an HST – so not the *huge* reduction it may appear.

Secondly, the frequency increase (both in terms of Paddington services and Bristol services) will make quite a difference to overall capacity in Devon/ Cornwall. The current situation (where awkward gaps in the timetable mean that the first direct service for a couple of hours is bound to be disproportionately busy) isn’t going to be the case in the future.

Thirdly – an hourly (158 operated) service from Bristol/ Taunton to Exeter/ Plymouth/ Cornwall could make a big difference to loadings on the parallel XC service – especially if three coach 158s (which will be comparable in capacity to a four coach Voyager).

Fourthly – now that 800s are being ordered beyond the initial batch, presumably the “unit cost” comes down a fair bit (given that a lot of the expense being complained about related to the design costs being spread over the initial first bunch of units only), which must make them more attractive for future bids (TPE, MML) – bi-mode means that the slow pace of electrification on those lines isn’t the barrier we thought it might be.

Fifthly – if we can order 26m coaches for the twisty turny route through Devon/ Cornwall, does this mean we can forget about the “IEP will need billions of pounds of route clearances” froth?

Sixthly – whilst I don’t want to turn yet another thread into a “Northern” one, the new Northern franchise will need over 86 EMUs in total by the end of CP5 (based on current timescales, assuming no additional wires east of Stalybridge in that period). I’m not saying that they’ll take on all of the 319s, but they could do if they wanted to (albeit at the cost of losing some/all of their 321/ 322/ 323/ 333s). That’s for the future, but they could be a home for all 86, given there’ll be around fifty additional EMUs required for all of the “Lancashire Triangle” stuff. The overall numbers work out fairly well for "all the 319s plus ten 350/4s for the posher services"...

Seventhly – I agree with LNW-GW Joint’s comment about the government slowly moving away from ROSCOs. No big announcement that’ll spook investors, no sabre rattling from a tubthumping politician, but they’re subtly ensuring that a lot of new stock is ordered independent of the “big three” at the same time as insisting that hundreds of existing ROSCO carriages (the Pacers) are unsuitable for major franchises - will the ROCSOs react to their market being slowly squeezed, or will they accept a “death of a thousand cuts”? And will the “direct from the manufacturer” model become the norm for other orders?

Eighthly – if I were a ROSCO with a large number of 125 mph stock (180s, Voyagers, 91s etc), I may be a little concerned about their long term prospects, since we could be seeing a surplus by the end of the decade – such stock may not be the cash cow that we would have assumed a few years ago. It could be a buyer’s market if you are bidding for new franchises though (with the option of refurbished HSTs versus midlife 180s versus new bi-modes... make the ROSCOs compete against each other)?

Ninethly - maybe there’ll be regrets in Scotland that they didn’t wait for a subsequent batch of shiny new bi-mode 80Xs, and are getting 1970s HSTs instead? I know that the mindset of enthusiasts is to envy the greener grass north of the border (and to use the freak circumstances of the Borders branchline as some kind of benchmark for what could/ should be built in England "if only things were more enlightened"), but maybe that attitude will change? New bi-modes in Cornwall, over a hundred self-powered coaches at Northern... whilst almost all post-privatisation diesels to leave Scotland?

Tenthly – maybe ordering trains similar to the Oxford/ Swansea/ Bristol order means that the operator will be able to swap units on busy summer weekends, to ensure that everything heading to Cornwall is nine coaches during the school holiday weekends (i.e. it’s not leaving a microfleet)?

**​

re the 222s comment: The four coach 222s weren’t an “Operation Princess” on the MML, they were to replace three coach 170s on existing services (which had previously replaced two coach 170s, which had been introduced to run brand new services – with no reduction to the existing HST services).

Since MM didn’t get permission for their proposed hourly London – Leeds service, they didn’t need the nine coach 222s, so changed the plans (with some HSTs replaced by seven coach 222s, but this was not an attempt to replace HSTs with four coach 222 – the comparison to the “double the frequency at half the length” seen elsewhere isn’t entirely fair).
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
Sixthly – whilst I don’t want to turn yet another thread into a “Northern” one, the new Northern franchise will need over 86 EMUs in total by the end of CP5 (based on current timescales, assuming no additional wires east of Stalybridge in that period). I’m not saying that they’ll take on all of the 319s, but they could do if they wanted to (albeit at the cost of losing some/all of their 321/ 322/ 323/ 333s). That’s for the future, but they could be a home for all 86, given there’ll be around fifty additional EMUs required for all of the “Lancashire Triangle” stuff. The overall numbers work out fairly well for "all the 319s plus ten 350/4s for the posher services"...

Northern have 41 EMUs (excluding 319s) currently, so if they have a fleet of only 319s and 350/4s that will still mean a lot of EMUs to find new homes for. I've created a future use of 319 discussion thread here: http://www.railforums.co.uk/showthread.php?t=113742
 

JamesRowden

Established Member
Joined
31 Aug 2011
Messages
1,762
Location
Ilfracombe
I know that use of the bay is not a hard and fast rule but if cost is a concern - as it clearly is with the current state of the GW electrification - then why bother wiring the junction and main line platforms, when you can get it done on somebody else's tab for the Electric Spine, especially with the possible remodelling on the agenda as well?

The Western Route Study draft anticiaptes a hourly Basingstoke to Manchester via East West Rail service in 2019. As a result I doubt that one short AC platform at Basingstoke will be enough for a reliable service.
 

RPM

Established Member
Joined
24 Sep 2009
Messages
1,531
Location
Buckinghamshire
In the longer term I could see that line ending up with Chiltern and having Padd Heathrow Slough High Wycombe Aylesbury Milton Keynes services on it.

Reopening from Bourne End to High Wycombe you mean? Absolutely zero chance of that. The trackbed has been extensively built over and it is in the heart of conservative NIMBYland.
--- old post above --- --- new post below ---
I can't see very much about the North Downs line. Presumably this will remain class 165/166 operated?
 

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
Heard there is a 3-4% cap and collar, First gets revenue support if their annual margin is below 3% and Dft keeps all profits above 4%.
 

G_A_C_C_C

Member
Joined
11 Dec 2008
Messages
127
Location
High Wycombe
And they've just applied to make the remains of the line a cycle route. I live by the line (Stratford Drive, Bourne End [BNE]), I work by the line (Loudwater) and it goes right passed my allotment in BNE...I'd rather the whole lot (Maidenhead, Marlow, BNE, High Wycombe) was converted to Tram
 
Last edited by a moderator:

jimm

Established Member
Joined
6 Apr 2012
Messages
5,276
The Western Route Study draft anticiaptes a hourly Basingstoke to Manchester via East West Rail service in 2019. As a result I doubt that one short AC platform at Basingstoke will be enough for a reliable service.

I would have thought that SWT would be none too thrilled at the idea of having someone's else's services turning round in the main line platforms every hour all day, which problem leads us towards the idea of remodelling the station anyway, as fgwrich noted - thus sticking it on someone else's tab...
 

JamesRowden

Established Member
Joined
31 Aug 2011
Messages
1,762
Location
Ilfracombe
I would have thought that SWT would be none too thrilled at the idea of having someone's else's services turning round in the main line platforms every hour all day, which problem leads us towards the idea of remodelling the station anyway, as fgwrich noted - thus sticking it on someone else's tab...

There is a siding to the West of Basingstoke station on the north side of the line. Perhaps the Basingstoke to Manchester service could turn around in it to minimise the time spent occupying the platform.
 
Last edited:

The Ham

Veteran Member
Joined
6 Jul 2012
Messages
12,036
How nice to see a thread about the south west without the Crayonista stuff about Okehampton/ Waterloo to Barnstaple/ finding a future for 222s/ fanboy posts about the LSWR...

A few thoughts:

Firstly, a five coach IEP-style train is going to be 130m long – given the space “wasted” by doors in shorter carriages, that may mean that a five coach IEP has more seats than a conventional six coach DMU – and a five coach IEP could have more than half the seating of an HST – so not the *huge* reduction it may appear.

Quite, a 5 coach class 800/801 has 59% of the capacity of a HST, because a 9 coach or a pair of 5 coach trains has 118% of the capacity of a HST.

Secondly, the frequency increase (both in terms of Paddington services and Bristol services) will make quite a difference to overall capacity in Devon/ Cornwall. The current situation (where awkward gaps in the timetable mean that the first direct service for a couple of hours is bound to be disproportionately busy) isn’t going to be the case in the future.

Also as the new stopping services are likely to be class 158's it could also limit the number of people who opt to use the Intercity services over the local services.
 

Class 170101

On Moderation
Joined
1 Mar 2014
Messages
8,661
There's no particular explanation as to why Maidenhead - Marlow isn't going to be electrified. There's an apparent willingness to reconfigure Bourne End to allow a half hourly service without changing trains, but the need to extend platforms or set up two car or three car electrics seems to rule out the wires.

Why not turn over the branch to a light railway and just run 2 car trains on it like the DLR cars?
 