Arent we forgetting something?
TPE Direct award extension? its getting really really late now.
TPE Direct award extension? its getting really really late now.
Arent we forgetting something?
TPE Direct award extension? its getting really really late now.
Looking at the Northern ITT they are required to run the following services as a minimum from December 2017:
- Hourly Crewe to Piccadilly via the Airport stopper
- 8 trains a day from Airport to Barrow
- 2 trains a day from Airport to Windermere.
- Hourly Airport to Liverpool via Chat Moss service
- Hourly Airport to Liverpool via Warrington service
- Hourly Airport to Blackpool service
- Additionally an hourly stopper unless the Chat Moss service acts as a second stopper
TPE are required to provide:
- Hourly Airport to Scotland service
- Half-hourly Airport to York service
- Hourly Airport to Cleethorpes service
Plus additionally Northern will have to provide an hourly Airport-Leeds via Bradford service from December 2019.
I think the Airport to Liverpool Chat Moss will have to be all-stops between the Airport and Piccadilly otherwise they'll be 11tph between Piccadilly and the Airport post-2019 and I'm pretty sure Network Rail said the maximum could be 10tph.
If that is the case it would likely free up some 323s from the Airport line which could then be used to run the additional Macclesfield-Manchester services without any issues about 319s not accelerating quickly enough to run stoppers ahead of Pendolinos.
Would it not be a good idea for some 319s to go south of Manchester anyway if there's still services diagrammed for diesels there. (Is there still a DMU Alderley Edge diagram?). The Macclesfield stopper will have less distance and fewer station calls in front of the expresses, so could they not be run by slightly lower performance stock?
I thought it was established previously in this thread that while Liverpool-Warrington-Airport is stated in the consultation response there isn't actually a requirement for it in the TSR spreadsheets.
Can't see 10 Class 350s being enough though.
Surprised at that. I expected Manchester to Blackpool to require more than four diagrams, nearer 6 diagrams so doubling up would be 12 units.
One option would be a Brighton Express style refurbishment of some 319s. But as the 350s are suitable, and LM will operate 319s, it would make more sense if that was being considered to use 350s instead.
I was thinking of the 319s here for Northern. The Class 360s would create a sub-fleet at LM which cannot work with the Class 350s. 350/4s won't have this issue.
Is it confirmed that Windermere services will remain as a shuttle? Albeit one unit on the shuttle is clearly all thats needed.
It would be two for some of the day. They will have to pass each other somewhere not too far south of Oxenholme otherwise there would be a big gap in the timetable of shuttles on the branch itself.
I don't see why that has to be the case. There's no requirement for the regional EMUs to run the shuttle so you could have a 319 running the shuttles and either have:
(...) 2. The regional services providing additional services to the hourly shuttle, which could be very useful between the start of the Easter school holidays and September. The spec shows the minimum requirement for services, not the maximum requirement.
On the other hand, if there are no other 319 workings north of Preston, it's probably just as easy and not much more expensive to keep with present practice.
They have to run a minimum of 87 Blackpool (North or South)-Preston services per day.
A minimum of 19 must be Blackpool- Manchester Airport
A minimum of 16 must be Blackpool-Leeds via Burnley
A minimum of 14 must be Blackpool-Liverpool
A minimum of 17 must be on the Blackpool South branch.
That leaves 21 services where the bidders can choose the final destination. Although, I imagine most of them will be stopping services between Blackpool North and Victoria.
The spec provides for hourly services to both termini, but not that they have to be through workings as far as I can see. And given that only the East Lancs services will be diesel, there's not much room to manoeuvre.
Blackpool South will still be diesel too!
Given the lack of bay platforms at Preston (those that exist require the trains to cross over to the fast line side of the station) I don't imagine there will be much change to this service.
Passenger numbers on this line aren't huge because demand is suppressed by capacity and service quality - including reliability.The only change I can foresee happening here is conversion to tram-train or pure tram operation. Conversion would be the least implausible way of upgrading the line, as it would be unjustified to spend huge amounts of money on redoubling and electrifying the line when passenger numbers aren't huge and there's a light rail system designed for tram-train operation only 100m away. With the proposed extension of the tram to Blackpool North, and by converting the route to tram operation all the way to a set of tram platforms at Kirkham and Wesham, you would lose very little in terms of connectivity.
Yeah 26th June, though the Northern bidders preliminary rolling stock plans had to be in by 13th March so they could be reconciled with TPE and other franchise bidders.
First Managing director being interview briefly on Sky about their bus order, asked whether they were still committed to UK rail and insisted that they were as they had only submitted their bid for TPE yesterday. So they submitted their bid on the very last day, risky, must have been working furiously on polishing it to try and regain a foothold in rail.
That's what I mean, they thousands of pages, if you leave it to last moment what if you have a power cut, corruption, printer failure, other emergency etc....
I know from experience if you plan to hand in coursework on the final day then whatever can go wrong will go wrong.
Keolis might also be able offer a complementary bid to Govia's for Northern (ie shared fleets/facilities etc).
Stagecoach have to approach it cold, having never been closely involved in the area other than with Virgin on inter-city services (WC, EC).
In train procurement, they are all close to Siemens, with growing involvement with Hitachi.
The Bombardier and Alstom links are harder to judge.
Digital copy and paper submission, LNW is right they are tens of thousands of pages long, crates and crates of paper. You wont be printing a fresh draft multiple times a day, most of it (evidence, plans, supporting documentation like quotes) will be finalised with only an periodically updated index and figures likely in flux to the end as they are massaged, even a decent photocopier overheats after a few hundred pages straight.
even a decent photocopier overheats after a few hundred pages straight.
So they submitted their bid on the very last day, risky, must have been working furiously on polishing it to try and regain a foothold in rail.