I suspect that the old question about could Messi/ Ronaldo do it on a wet Wednesday night in Stoke argument about talented footballers slumming it in unspectacular surroundings is being replaced by could a cascaded train from London do it on a Northern Rail diagram to Stoke. Weve already had hundreds of posts pointing out that 100mph 319s couldnt, now the D78s are getting the same complaints (DESPITE THERE BEING NO SUGGESTION THAT THEYLL BE USED ON FAST SERVICES ON THE WCML :roll

.
I watched the Look North feature on them last night, pretty unremarkable they pointed out that they still had copies of the Evening Standard strewn about on them and District Line diagrams on the wall as if anyone would be daft enough to think that theyd go into service elsewhere in the UK in such condition... (oh, wait...)
The D78s aren't intended for a 40 year life, but as a stopgap to fill in for a temporary shortage
Agreed the theyre not fit to last another forty years argument is as thin as the theyre not going to be able to cope with 125mph paths on the ECML/WCML argument people opposing D78s are really exaggerating in their arguments against them (which is why Im coming round to be in favour of D78s) they are intended as a short term solution to specific lines only.
I wouldn't be too surprised to see more 317s (both those currently with GN and those with LO) end up with GA
If I were organising the many cascades thatll happen over the rest of the decade then Id put all the 317s with GA since itd make more sense to have eight/twelve coach services on the GEML run by units with corridor connections (compared to a 321).
I will return to this thread, somewhat in a better frame of mind than two weeks ago, just to make the point that having a unit with a top speed of 60mph does not automatically mean that this will be treated as the average speed during a journey.
Well, yes, obviously, just like the top speed of a Pacer/Sprinter does not mean that they reach 75mph on each journey.
Ive previously said on this thread that I dont think that Pacers are timed to get above 60mph around Sheffield (am talking about what the speeds the services are timed to do, which isnt necessarily the same as the top speed of the units or the line speed) I could be wrong there are obviously some routes diagrammed for Northerns 158s that see higher speeds and I think that there are some Pacer run services that do require fast running (the Dearne Valley service from Sheffield to Leeds being one) - but I think that a significant number of Northerns diesel services *could* be run with a 60mph top speed.
If people were proposing D78s for Nottingham Leeds or Stoke Manchester then itd be A Bad Idea, but I think that there are plenty of slower routes that they could cope with.
Turns out the reason the mock ups have Huddersfield on them and the computer simulated trials were on the Penistone Line was because the idea was first presented at Connected North rail conference held at Huddersfield University.
I wondered if it was because Huddersfield is a nice neutral destination to show since it may relate to a service from Manchester, from Leeds or from Sheffield i.e. they arent limiting it to one route/depot.
Speaking of which, Ive not heard of that opinionated professor from Huddersfield for a while...
Just seen the BBC report.
Apparently they'll be used for '2 or 3 years or until the lines are electrified'
2/3 years fine, but 20-40 years until lines are electrified, erm... haven't we already had one long-lived poor quality cheap solution
They wont be required in forty years time, despite how many times people on this thread claim it. I dont think theyll be required in ten years time tbh.
I honestly don't get it. People on this forum seem to be angry at the thought of more carriages coming to help relieve overcrowding through a series of cascades. They aren't replacing pacers like for like, they are replacing pacers on certain lines so that these displaced pacers can be sent to strengthen diagrams where people are getting left behind on the platform
Basically, its an excuse for the Chip On The Shoulder brigade to complaint about something else (despite these being additional capacity, i.e. to provide extra DMUs over the next five years, before electrification starts allowing withdrawals).
Maybe people should reserve judgement until we actually see how these D trains perform. In this day and age it would seem sensible to me to look at ways of re-using and re-engineering old trains, why wouldn't you try if it was a lot cheaper and you ended up with something useful?
Agreed about waiting until we have more evidence, but some on here are more knee-jerk than others...
As for re-engineering, this is a good point Ive seen many people talk about how the HSTs could be patched up for another thirty years (following the Triggers Broom approach) the D78s have still got some life in them, though arent needed on their current line(s) around London - same principal applies.
Electrification and IEP are going to free up lots of loco hauled stock, midland main line and Southampton northward freight core electrification will free up lots of Voyagers and Northern Hub will free up lots of 185s. None of these seem terribly suited to the Northern metro stopping services
One of the problems Ive had with CP5 electrification is that its more about the main lines than the branches (GWML, MML, Transpennine etc not the lines where the 75mph DMUs are located in large numbers), so the DMUs directly replaced by EMUs will be dominated by 170/180/185/220/221/222s.
There are some cascades that could be done to facilitate Pacer replacement, but few Pacers will be directly replaced by EMUs (other than on the Valley Lines).
However, if D78s can tackle the quieter/slower end of the spectrum then maybe well be able to withdraw Pacers sooner.
Adrian Shooter's claiming TOCs are approaching him rather than the other way around. All we know is the other 'interested' TOCs are in 'other parts of the country.'
Bloke paid to promote D78s is boasting that lots of people are keen to use D78s in their franchise bids?
Yet despite this, some on here seem to think that the only franchise theyll go to is Northern and that the only routes theyll be used on are express ones where they can clog up 390s?
For non-stop mainline running sections the top speed will be most important factor. Who would pay for the late running fines incurred as a result of 60mph DEMUs being used on mainlines? Some Northern services in the 'South Manchester' area are only 2-3 minutes ahead of XC and EMT services using a 75mph and running on-time. If a 60mph train is used that gap would be reduced to around 1 minute
On congested parts of the WCML (like the example I gave) using a train that doesn't do 75mph when the line speed is > 75mph for a few miles is simply not an option
You're missing the point here.
A Northern service running express between Stockport and Manchester could have a XC or EMT service on the same line 2 or 3 minutes behind it. The Northern services which are operated by 75mph DMUs and run non-stop are around 90 seconds slower than a train capable of doing 100mph (whether that be a Pendolino, Voyager or 185.)
A Northern service which stops between Stockport and Manchester is on a slow line and won't have a regional/Intercity service following closely behind.
Most of the stopping services are operated by 323s (especially at peak times when paths are at a premium) due to their better acceleration. The DMUs need to get up to 75mph and stay at that sort of speed to not cause congestion.
If paths are for 75mph trains, in some instances there may be less paths if 60mph trains are used in lieu. Less paths could result in fewer services at peak times (even if the services that run have more carriages) and then that would mean less work for ASLEF members.
Heaton Chapel and Levenshulme have 4tph to and from Manchester. So to do what you propose would require 4 diesel services per hour at peak times between Stockport and Manchester - that could work two to Chester and two to Buxton. However, for Buxton services to stop at Heaton Chapel and Levenshulme in the northbound direction would require them to cross all the lines and the same applies to Chester services in the southbound direction, which obviously isn't good for maximising the number of available paths.
Then to put converted D78s on Chester and Buxton services they would need to be cleared for both lines - clearance for the Buxton line would be unlikely due to D78s being wider than conventional trains and 142s and 153s already failing tunnel clearance.
Then the platforms on the Chester and Buxton lines take up to 4 car Sprinters, so to use D78s the longest formation they would take would be a pair of 2 car D-Trains which would provide just 200 seats, opposed to the 260-300 seats a 4 car Sprinter provides.
Also could a 60mph D78 do Chester-Manchester stopping at Heaton Chapel and Levenshulme without taking more than the permitted 92 minutes?
So there's loads of reasons not to use converted D78s on South Manchester services and just one benefit - they are cheap
Whos talking about putting D78s on fast services from Stockport to Manchester though?
Youre finding strawmen to argue with...
When FGW took on a load of 75mph 150s from LM/LO a couple of years ago, nobody was naive enough to complain that theyd end up on Bristol Paddington expresses deputising for HSTs!