• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Creation of class 230 DEMUs from ex-LU D78s by Vivarail

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

sprinterguy

Veteran Member
Joined
4 Mar 2010
Messages
11,572
Location
Macclesfield
If they can go 60mph then they should forget the transit engines and make these steam railcars!
How fast can they go?
I don’t think that typically they would have operated at more than about 45mph, however there are reports that the GWR Railmotors were capable of 70mph and at least one of the LNER Sentinel steam railcars was tested at up to 63mph. :p
 

Emyr

Member
Joined
8 Apr 2014
Messages
656
a unit with a top speed of 60mph does not automatically mean that this will be treated as the average speed during a journey.

Physics says the average speed must be lower than the top speed if the start and end states are stationary, unless the top speed is 0.
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
I don’t think that typically they would have operated at more than about 45mph, however there are reports that the GWR Railmotors were capable of 70mph and at least one of the LNER Sentinel steam railcars was tested at up to 63mph. :p

The permitted maximum speed of a train is not the same as the top speed a train can reach during testing. For instance, the 350s were always capable of running at 110mph (or even faster) but they weren't permitted to run at that speed in passenger service initially.
 
Last edited by a moderator:

sprinterguy

Veteran Member
Joined
4 Mar 2010
Messages
11,572
Location
Macclesfield
The permitted maximum speed of a train is not the same as the top speed a train can reach during testing.
Yes, but converting old London Underground stock to steam power based on the performance characteristics of rolling stock 80 years ago is hardly a serious suggestion. :lol:
 
Last edited:

sprinterguy

Veteran Member
Joined
4 Mar 2010
Messages
11,572
Location
Macclesfield
Someone at DfT reading this thread just went "What! It wasn't?" :D
They’ve probably got a team of “analysts” checking Wikipedia for stats as we speak. ;)

That use of the GWR railmotor on the Looe branch a while back? That wasn’t just a magnanimous gesture to the preservation movement – there’s a master plan. :lol:

(Apologies, this is going rapidly off topic. :oops:)
 

Dstock7080

Established Member
Joined
17 Feb 2010
Messages
3,515
Location
West London
The permitted maximum speed of a train is not the same as the top speed a train can reach during testing.
D Stock are currently permitted to operate at 45mph across the District Line but have been known to achieve 51-53mph on certain sections.
60mph would only be possible with the planned removal of the PCM camshaft equipment.
 

Taunton

Veteran Member
Joined
1 Aug 2013
Messages
12,278
... reports that the GWR Railmotors were capable of 70mph ...
Many of the GWR Railmotors were later converted to push-pull auto trailers by removal of the power unit.

An account in a rail magazine in the late 1950s describes a train timer on a Bristol to Gloucester express doing 70 mph past Stonehouse, where they caught up with one of these older auto trailers being propelled by a 14xx 0-4-2T tank loco (running in reverse) where the Stroud to Gloucester line ran parallel. It speeded up, as was common there when two trains ran together, and ran side by side with the express.
 

61653 HTAFC

Veteran Member
Joined
18 Dec 2012
Messages
19,352
Location
Yorkshire
AIUI all trains are tested, when introduced, at maximum permitted speed +10%. Therefore when the D78s are trialled part of the acceptance process will involve running them at 66mph, even though they won't normally run at that speed. Likewise the 442s have run at 110mph (and more!), even though prolonged running at >100mph on 3rd rail causes issues I believe.

Did notice an article in the Independent about the Vivarail project, complete with numerous reference to "Tube trains" and a photo of Piccadilly line stock! :roll:
 

Nym

Established Member
Joined
2 Mar 2007
Messages
9,784
Location
Somewhere, not in London
In fairness the 73TS on the picc is basically the same base design as the D78, quite a few differences afterwoulds though
 
Last edited:

47802

Established Member
Joined
6 Mar 2010
Messages
3,454
Should the manufacturers raise objections to these trains, after all they are being asked to build new trains to ever more stringent standards of crashworhiness, yet a train here is being potentially allowed which wasn't even built to BR crashworthiness standards at the time it was built.

And if they are treated as tram train light vehicles doesn't that mean that TPWS will be required at every signal on the routes they will be used, which would mean an extra cost compared to just buying new heavy rail units or refurb existing heavy rail units?
 
Last edited:

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,379
Location
"Marston Vale mafia"
Well I think the jury will be out on that one.

We only have what Vivarail are saying to go by. If it turns out they are lying, which to me there is no evidence to suggest they are, then they may well fail to sell any of their product.

Certainly this:
http://www.vivarail.co.uk/new-technology-proven-package/

says they will build a new cab structure, which is a big part of the crashworthiness requirement.

Neil
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
Turns out the reason the mock ups have Huddersfield on them and the computer simulated trials were on the Penistone Line was because the idea was first presented at Connected North rail conference held at Huddersfield University.
 

route:oxford

Established Member
Joined
1 Nov 2008
Messages
4,949
Should the manufacturers raise objections to these trains, after all they are being asked to build new trains to ever more stringent standards of crashworhiness, yet a train here is being potentially allowed which wasn't even built to BR crashworthiness standards at the time it was built.

Possibly. But follow that through to the logical conclusion and nothing pre-2000 would be allowed on the national rails.
 

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,425
Location
A typical commuter-belt part of north-west England
Looking back at some the postings, I am sure there are those who have made contributions to this thread would be more that happy to see the Northern Rail franchise equipped with a plethora of "dandy" horse drawn rail carriages of the type that once ran on the Port Carlisle Railway..<(
 

47802

Established Member
Joined
6 Mar 2010
Messages
3,454
Possibly. But follow that through to the logical conclusion and nothing pre-2000 would be allowed on the national rails.

Yes but a least other stock is built to what ever crash regulations were in force at the time for mainline stock, having said that if I were a driver I'm not sure would be particularly impressed swapping 15 year old locomotives for 50 year old locomotives on the Scottish Sleeper for instance.
 

Mikey C

Established Member
Joined
11 Feb 2013
Messages
8,261
Should the manufacturers raise objections to these trains, after all they are being asked to build new trains to ever more stringent standards of crashworhiness, yet a train here is being potentially allowed which wasn't even built to BR crashworthiness standards at the time it was built.

And if they are treated as tram train light vehicles doesn't that mean that TPWS will be required at every signal on the routes they will be used, which would mean an extra cost compared to just buying new heavy rail units or refurb existing heavy rail units?

But then it's not as if manufacturers (for various reasons) have equivalent new products on sale anyway, which is part of the problem.
 

route:oxford

Established Member
Joined
1 Nov 2008
Messages
4,949
Yes but a least other stock is built to what ever crash regulations were in force at the time for mainline stock, having said that if I were a driver I'm not sure would be particularly impressed swapping 15 year old locomotives for 50 year old locomotives on the Scottish Sleeper for instance.

Ah, you must be one of the Aslef members who "fears" the re-engineered 73.
 

GrimsbyPacer

Established Member
Joined
13 Oct 2014
Messages
2,254
Location
Grimsby
Looking back at some the postings, I am sure there are those who have made contributions to this thread would be more that happy to see the Northern Rail franchise equipped with a plethora of "dandy" horse drawn rail carriages of the type that once ran on the Port Carlisle Railway..<(

Only if prices become alot cheaper!
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
Does this group prefer to bounce around at the front of a woefully overloaded Pacer, as long as it's going 15mph faster?

If paths are for 75mph trains, in some instances there may be less paths if 60mph trains are used in lieu. Less paths could result in fewer services at peak times (even if the services that run have more carriages) and then that would mean less work for ASLEF members.
 

Clip

Established Member
Joined
28 Jun 2010
Messages
10,821
Looking back at some the postings, I am sure there are those who have made contributions to this thread would be more that happy to see the Northern Rail franchise equipped with a plethora of "dandy" horse drawn rail carriages of the type that once ran on the Port Carlisle Railway..<(

Why not? Especially if they were all called 'Dandy'. Great idea Paul.
 

67018

Member
Joined
14 Dec 2012
Messages
486
Location
Oxfordshire
Why not? Especially if they were all called 'Dandy'. Great idea Paul.

Only, of course, if some horses could be found that are no longer required in the South. Do they still have the donkeys at Greenwich Park? - they could send them North after they retire <D
 
Status
Not open for further replies.

Top