Not that Wimbledon ASC or Woking regulate properly anyway. You could put a load of shop mannequins in there and a computer and no one would be able to tell the difference.:roll:
To be fair, we could say the same about half the drivers!![]()
There seems to be delays again this morning, maybe this will be solved after the track works next Jan & Feb. Are they also taking the opportunity at the same time at Wimbledon to build the second Foot bridge at the London end of the Station linking the LUL & NR platforms?
I certainly hope so!
they are doing a lot of works next to platfrom 9 at the moment but I don't know whether that is to just extend the track for the tram service or not?
The 6.33 from Guildford to Waterloo via Cobham was late today awaiting train crew so they cancelled all the stops after Effingham Junction to avoid causing further delays! Some passengers not to happy on Twitter. Can't blame South West Trains for cancelling though as they do need to avoid to many delays with so many trains going I to Waterloo.
Wonder what did cause the congestion in the end though. Only 10 minutes but National Rail Enquiries thought it important enough to mention o the live online departure boards. SWT clearly can't cancel stops of every train to avoid congestion.
Surprisingly my 8.33 train arrived into Surbiton early today. That's along with it arriving on time seems to be rare at the moment. Bear in mind there is a leaf fall timetable to help. The guard was good though as he mentioned that a delay could occur beyond Surbiton. Top marks for keeping passengers informed.
Trains have been delayed between Ascot and Guildford, due to poor rail conditions at Bagshot. Trains have been running at a slower speed than normal, as it has been harder for trains to draw power from the line.
-
A train has now come to a stand at Bagshot station and is unable to get moving again. This means that services are unable to run between Ascot and Aldershot until it can be moved.
I certainly hope so!
they are doing a lot of works next to platfrom 9 at the moment but I don't know whether that is to just extend the track for the tram service or not?
CP5 delivery plan said:...station works at key locations across the route and a package of supporting mainline capacity improvement works.
I don't think the second footbridge is happening in the short term, I think it is now possibly part of the overall Waterloo capacity project in as much as it describes work away from Waterloo as well as connecting the international platforms; so it might be this:
Whatever project eventually does cover it now, the possibilities were last described in some detail in the early draft versions back in 2011 as a 'Wimbledon congestion relief' project; but unfortunately that has disappeared, so the second footbridge is no longer an explicitly described enhancement.
That's a shame if the second foot bridge does not happen at Wimbledon. It is really needed. (I wondered what the works were at Platform 9/10)
Is that due to the leaves and rain? The new timetable starts on the 14th. Be interesting to see what the weather is like by then.I had a trip Guildford-Aldershot and return earlier. Adhesion did seem to be very bad today. Struggled away from Guildford up the bank towards Wanborough. And stopping at Wanborough in the other direction a couple of little slides were audible. Trains on the Cobham route are struggling as well.
they are going to have problems on access to platforms 9/10 at Wimbledon if there is no second footbridge and more trams coming into the station.
there will need to be a one way system up and down like in place to get passengers down to the Waterloo trains on platform 5.
Incident created04/12/2014 16:41Last updated04/12/2014 17:03Route affected
DownloadMapof route afected
South West Trains between London Waterloo and Portsmouth Harbour / Guildford / Exeter St Davids
*
TOC(s) affectedSouth West Trains;*Description
Emergency engineering works near Esher means journeys are being delayed by up to 30 minutes between Wimbledon and Woking / Virginia Water.
There is no firm estimate yet of how long disruption will last but it is likely to continue until at least 19:00.
You can follow this incident using the hashtag*#Esher
To check your journey, please use the National Rail Enquiries real-time*Journey Planner
Yes definitely well done. Would a machine spot it or human eye? If human eye that's very good.Broken rail at Esher tonighthttp://twitter.com/SW_Trains/status/540568864929902592/
Well done to whoever found that, as a passenger and layman it looks like a needle in a haystack!
Some of the comments are amusing.Looking at that pic, had they done somework on the rail before that pic was taken as it looks a little straight and clean
Well I've now signed Farlington to Southampton. So now deeper into SWT land
Funny thing is when I was route learning this week I had to travel on the SWT Pompy to Southampton stoppers. I learned more on how to work 450/455's when chatting to staff than almost the excitements of Hamble. (2 platforms, 4 cars, narrow, signal on the up. Exit rear up, down front via the road bridge. Watch out for the ponies).![]()
Electrical problems around Weymouth today, trains terminating at Dorchester. Predicted until 13:00. Also a now recovered failed train at Moreton.
Familliarise yourself with Fareham bay platform, 377s spend a lot of time there![]()