Has electrification to Windermere been authorised?

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,349
Location
"Marston Vale mafia"
We are talking about Windermere long distance services.

I know. My point is that it would be easier to fit them in on a clockface basis. And indeed they used to be clockface-ish, on a two hourly pattern I believe. The present messy pattern has I think something to do with availability of 185s.

Neil
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,349
Location
"Marston Vale mafia"
Lol, read what I originally wrote.

I did. You stated it may be difficult to path the service on the WCML with a clockface timetable. I stated that that was not the case because other existing services on the WCML are clockface, so if there is room for it at all there is room for it at the same time each hour.

Neil
 

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
I said they didn't have the stock to manage a regular service. As to the clockface issues im referring to the timings of the service, its harder to fit into slots on a busy existing schedule without significant downtime, they don't have the stock to let something sit around doing nothing to allow even timings. The other issue is that while there is a clockface timetable the paths aren't always available, e.g. certain hours slots could be given over to freight or extra peak services.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,349
Location
"Marston Vale mafia"
I said they didn't have the stock to manage a regular service. As to the clockface issues im referring to the timings of the service, its harder to fit into slots on a busy existing schedule without significant downtime

Not sure what you mean by "downtime", but as it's a branch it wouldn't be hard to schedule it to fit the slots on the WCML, as it doesn't depend on anything else.

The reason why TPE don't run a full through service now is indeed 185 availability, I understand.

they don't have the stock to let something sit around doing nothing to allow even timings. The other issue is that while there is a clockface timetable the paths aren't always available, e.g. certain hours slots could be given over to freight or extra peak services.

You tend to get variance from clockface in the peaks - but that isn't a reason not to run clockface all day. Freight, maybe, but the north WCML is hardly full.

Neil
 

Class 170101

On Moderation
Joined
1 Mar 2014
Messages
8,661
I think you'll find down time is turnaround time.

Insufficient of which leads to poor performance and too much = poor stock utilisation.
 