Instead it was "this is the model we are making. you can pick what colour it is in but nothing else".
Still better than Ford and the Model T where you couldn't even choose the colour
Instead it was "this is the model we are making. you can pick what colour it is in but nothing else".
Class 170s are DOO (P) approved and have done DOO (P) work between Ipswich and Liverpool Street and still do between Ipswich and Colchester.
--- old post above --- --- new post below ---
Correct but where is the electric stock currently to displace the 170/ 171s?
I'd guess if Southern had truly been able to specify the 171s, they'd have had the same bodyshell length and width as the Electrostars?
Class 170s are DOO (P) approved and have done DOO (P) work between Ipswich and Liverpool Street and still do between Ipswich and Colchester.
We are fairly soon going to be swimming in 100mph EMUs with nowhere to go.
Class 319s for example, and Class 317s.
If there are not enough 319s to go around, send 317s up north in lieu of 319s and put the 319s to work.
Or use Class 365s if any are shaken lose by the musical depot-roads game being played at Thameslink.
Not on Southern's safety case they aren't.
Seem to remember there are just a few 319s looking for a home shortly.
No 'homeless' 319s until mid 2016. They ones released have been snapped up.
Isn't that Bombardier's philosophy to try and keep to a standardised design, especially if its for a relatively low number of trains, nothing wrong with that in my view, and how do you know they wern't more customer focused but the costs of changing the design might have been too high for the customer. Obviously a large order may justify significant changes to the design.
Dick Fern (the then boss of Irish Rail) said it in an article of "Modern Railways" IIRC.
All they wanted was a change in the door positions. Adtranz said no.. So off to Japan with 400 million of cash that could have gone to Derby had they been more flexible.
And the Irish Rail order was large enough (234 Vehicles). CAF can do small orders and Siemens seem willing also. Derby is just lazy and wonder why they lose orders:roll:
Unfortunately for Derby, after getting nowhere with flogging the Turbostar concept to IE, they then put forward the 172 to NI Railways for the New Trains Two programme - Whilst the 172's layout would have been more suited to this rolling stock procurement than the IE attempt, the two things that let them down were the compatibility wanted by NIR to work with the 3000s and the late running of the Class 172 build programme. So another case of You want this, but we will only build you this.
And whilst they replaced the Mk3 sets, the 22000s as built by Hyundai Rotem / Mitsui are rather pleasant units to travel on. The same MTU powerpack as a Class 170, but with the ambiance of the Mk3s they replaced. One of Dick Fearn's key clauses of the new DMU fleet was to be based largely around the Mk3s they were set to replace, and it's a job they've managed to do rather well. I reckon that had a batch been built for Scotland, we wouldn't be seeing the 170s being sent away.
Dick Fern (the then boss of Irish Rail) said it in an article of "Modern Railways" IIRC.
All they wanted was a change in the door positions. Adtranz said no.. So off to Japan with €400 million of cash that could have gone to Derby had they been more flexible.
And the Irish Rail order was large enough (234 Vehicles). CAF can do small orders and Siemens seem willing also. Derby is just lazy and wonder why they lose orders:roll:
CAF can do small orders and Siemens seem willing also.
And whilst they replaced the Mk3 sets, the 22000s as built by Hyundai Rotem / Mitsui are rather pleasant units to travel on. The same MTU powerpack as a Class 170, but with the ambiance of the Mk3s they replaced. One of Dick Fearn's key clauses of the new DMU fleet was to be based largely around the Mk3s they were set to replace, and it's a job they've managed to do rather well. I reckon that had a batch been built for Scotland, we wouldn't be seeing the 170s being sent away.
Anyway, as for the topic, I take it that confirmation has been received that ScotRail are sending some 170/4s down to Southern in the near-ish future? .
Govia Thameslink Railway (GTR) deal boosts capacity on crowded Sussex line GTR has revealed plans to give passengers vital extra capacity on the Uckfield to London Bridge line by deploying 12 additional carriages of Class 170 diesel trains, etc, etc.
http://www.railforums.co.uk/showpost.php?p=1960502&postcount=144
swt_passenger:1967885 said:Anyway, as for the topic, I take it that confirmation has been received that ScotRail are sending some 170/4s down to Southern in the near-ish future? .
Yes, post #144 gave the public confirmation:
Govia Thameslink Railway (GTR) deal boosts capacity on crowded Sussex line GTR has revealed plans to give passengers vital extra capacity on the Uckfield to London Bridge line by deploying 12 additional carriages of Class 170 diesel trains, etc, etc.
http://www.railforums.co.uk/showpost.php?p=1960502&postcount=144
These units have recently been spruced up and have a nice interior. All first class sections removed and are now std class only (suburban turbos) we call them.
Will these units be doo operated? They can have 393 that unit failed today
--- old post above --- --- new post below ---
Also heard recently that 170 405-415 leases are up very soon and nothing has been don't to rectify this. Being honest these 1st gen turbos are not in the best condition inside and out. They get hammered everyday on e and g's or Aberdeens, Inverness and Dunblane services. Not unusual to see them on Fife circles either.
I'd expect a Southern refurb tbh. Maybe some will enter whilst some are off being southernised.
I'd expect a Southern refurb tbh. Maybe some will enter whilst some are off being southernised.
Will they be doo?
Considering no other 171s are... I'd go with no.
I'm meant to know that how? Thee 170s are set up for do working by the way. All they need are mirrors or cameras at the stations.
Nobody up here has heard anything about this happening yet.
I'm meant to know that how? Thee 170s are set up for do working by the way. All they need are mirrors or cameras at the stations.
Will they be doo?
It would be amusing - Ashurst is entirely without ticket issuing facilities, which would mean free journeys from there using the Southern DOO model!![]()