I would hope that the SWML main line would be converted to overhead from Waterloo down to as far as Poole, ideally all the way to Weymouth. The other that could do with overhead would be from Waterloo to Exeter St Davids.
The Thameslink route south of the Thames (all the 3rd rail section) maybe could benefit from OLE to Brighton. Would any of the main lines in Kent benefit from being converted to OLE?
When any given section of 3rd rail is knackered, what's the relative costs for renewal and replacement with OLE?
It's definitely supposed to be cheaper at full renewal. That's one of the fundamental reasons the subject is being proposed at all by the DfT.
It is to my mind conceivable that 25KV could get as far north as Woking, north of there or anywhere in the Suburban area, no chance.
When the third rail electrification is worn out it is basically a case of renewing cables and craning in replacement substations/TP huts or replacing their innards. This can be done with fairly minimal disruption - as was shown on the fairly recent SR power upgrades where a large number of new substations were provided.
Replacing numerous bridges and installing OHLE as well as replacing/immumising most of the signalling and telecommunications kit (the older of which is probably not 25kV a.c. immunisable at all and will have to go and some of which is owned by third parties who would need compensation for any disruption to their commercial comms networks) would cause absolute chaos with weekend and overnight closures in all directions for years. Bear in mind the signalling and telecoms would have to be immunised for both a.c. and d.c. electrification as the d.c. can't be switched off until the a.c. is commissioned and in service.
Even if the a.c. could be done more cheaply (which is highly doubtful to say the least given the above) I'm convinced the disruption would make it politically unacceptable. Imagine the number of possessions to provide OHLE on the throats of Waterloo, Victoria and London Bridge and renew or immunise the S&T!
--- old post above --- --- new post below ---
You can't up the line speed without altering the signalling, and the two track sections mean your prospective 125 mph train will just catch up all the existing 100 mph EMUs, and the 2 x 75 mph freights per hour more quickly.
Unless your cunning plan include 4 tracking throughout, I may have missed that...![]()
I was assuming that the SWT desiros would be regeared for 110mph running. Or maybe even some proper intercity IEPs provided for Weymouth services with 125mph capability (alright that is flying pig territory...)
You may well be right that some freight loops would be needed, and a flyover at Basingstoke from the Reading line to the down "slow". It is not inconceivable though that the freights may end up running via Andover and the laverstock loop to Redbridge eventually.