By the looks of it there is quite a bit of disruption on the West Coast Mainline today with flooding at Carlisle and signalling problems in the Milton Keynes area with many delays and cancellations.

Does anyone know where abouts the locations are and what is happening with it all.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Tetchytyke

Veteran Member
Joined
12 Sep 2013
Messages
17,518
Location
Isle of Man
Yesterday there was a broken rail at Kings Langley delaying me by an hour. Today there was a signalling failure at Kings Langley and a points failure at Berkhamsted, together with a broken down train further north, delaying me by an hour. Information? Don't make me laugh.

Now they're saying the Tring stoppers are being replaced by a rail replacement bus service, although helpfully JourneyCheck on one side says we have RRBs but on the train running panel says everything is running fine.

It's abundantly clear that London Midland are happy to take our money from stations like Apsley, but that they and the incompetent Network Rail couldn't give a monkey's about running the train service we've paid for. Sticking on an RRB for us is an absolute disgrace, but hey, we can't possibly have Beardy Rail inconvenienced can we?
 
Last edited:

thenorthern

Established Member
Joined
27 May 2013
Messages
4,712
I was on a Euston train at Manchester Piccadilly and I heard a phrase that I hadn't heard in years "We don't currently have a driver"

Luckily they managed to get one and we departed on time.
 

MidnightFlyer

Veteran Member
Joined
16 May 2010
Messages
12,856
It's abundantly clear that London Midland are happy to take our money from stations like Apsley, but that they and the incompetent Network Rail couldn't give a monkey's about running the train service we've paid for. Sticking on an RRB for us is an absolute disgrace, but hey, we can't possibly have Beardy Rail inconvenienced can we?

I'm not defending the matter, but I thought most main lines had contingencies like that when things go to the wall - I believe on the SWML the Hampton Courts are the first services to be cancelled, on the ECML it's one of the hourly Leeds and on the WCML it's the Tring stoppers?
 

HarleyDavidson

Established Member
Joined
23 Aug 2014
Messages
2,544
I'm not defending the matter, but I thought most main lines had contingencies like that when things go to the wall - I believe on the SWML the Hampton Courts are the first services to be cancelled, on the ECML it's one of the hourly Leeds and on the WCML it's the Tring stoppers?

Hampton Courts, followed by Dorking & Shepperton's. The result is that Cobham's have to pick up the whingers at Raynes Park, New Malden & Berrylands, just to give them a 15' service. Yet making a darn slow journey even slower.

Berrylands I can understand.

Raynes Park - Unnecessary as it will still be served by Loopers, Cheesington & Guildford (Ep) services.

New Malden - Unnecessary as will still be served by Loopers & in times of disruption ½ hourly is quite adequate, especially as you can use an Oyster card on the buses around the area from Surbiton, Tolworth or even Wimbledon.
 

Tetchytyke

Veteran Member
Joined
12 Sep 2013
Messages
17,518
Location
Isle of Man
Oh I don't have an issue with the Tring stoppers being binned at all, that makes sense when the service is up the spout.

But Apsley and Kings Langley always get forgotten about, it seems beyond the wit of London Midland to issue consistent stop orders on other services when it happens. If it happens at all it's on the hoof rather than properly thought out. Running RRBs when proper trains are going through the station is ridiculous.
 

gordonthemoron

Established Member
Joined
4 Sep 2006
Messages
6,726
Location
Milton Keynes
why is NationalRail still referring to a broken down train? It was broken down before 9am, haven't they shifted it yet? Also, the now estimated time for normal service is 16:00, is this realistic?
 

Kristofferson

Member
Joined
23 Nov 2012
Messages
1,132
Is this the "upgraded" Watford/Bushey signalling sitting down and giving up again? It's getting tiresome now.
 

MK Tom

Established Member
Joined
31 Aug 2011
Messages
2,458
Location
Milton Keynes
Breakdown south of Northampton causing cancellations according to the Northampton Chronicle.
 

GadgetMan

Member
Joined
9 Jan 2012
Messages
980
Is this the "upgraded" Watford/Bushey signalling sitting down and giving up again? It's getting tiresome now.

Its not been upgraded yet!

Due to the opposition against the 2 week blockade the work is now being done in dribs and drabs overnight.
 

itsonlyme

Member
Joined
24 Jul 2012
Messages
105
All I can do is just sit and laugh. Day in Day out excuse after excuse. Glad I'm retired and at home most of the time. Heads should roll but that won't happen, the only thing that will roll is bonus's in an upwards direction!

The one job that is well filled is that of Chief Incompetent.
 
Last edited:

whhistle

Established Member
Joined
30 Dec 2010
Messages
2,636
Just to confirm the order of events:

1: Points problem (Bourne End) - trains only able to run north on Down Slow.
2: Signal 3150 on up fast starts playing up - trains talking past.
3: Broken down train just after Bourne End, delaying services by an hour. Trains unable to cross over Bourne End due to points failure.
4: Euston departures suspended for about 30/45 mins.
5: Trains stacked at Milton Keynes, Rugby, Nuneaton.

All lead to many, many delay minutes.
 
Joined
9 Aug 2012
Messages
374
Location
Nottingham
Crosscountry north - east / south west services badly disrupted too - apparently train hitting object at swinton. Some stopping short at bhm & dby, others seems to be going via Leeds
 

Tetchytyke

Veteran Member
Joined
12 Sep 2013
Messages
17,518
Location
Isle of Man
Is this the "upgraded" Watford/Bushey signalling sitting down and giving up again? It's getting tiresome now.

Yes, it's had another paddy this evening too.

I don't know what Network Rail did to the signals (I know the work isn't fully completed) but I wish they hadn't bothered.
 

DarloRich

Veteran Member
Joined
12 Oct 2010
Messages
32,909
Location
Fenny Stratford
Yes, it's had another paddy this evening too.

I don't know what Network Rail did to the signals (I know the work isn't fully completed) but I wish they hadn't bothered.

But with respect, people just like you (commuters into Euston and the TOCS) didn't want a long blockade to get the work done in one go. Cake and eat it?
 

Tetchytyke

Veteran Member
Joined
12 Sep 2013
Messages
17,518
Location
Isle of Man
The problem isn't that the work is being done at a more leisurely pace, the problem is that the work is being done incompetently. I genuinely believe that the project manager for this should be getting their P45, the train hitting the signalling cabinet sums their competence up perfectly.
 

DarloRich

Veteran Member
Joined
12 Oct 2010
Messages
32,909
Location
Fenny Stratford
The problem isn't that the work is being done at a more leisurely pace, the problem is that the work is being done incompetently. I genuinely believe that the project manager for this should be getting their P45, the train hitting the signalling cabinet sums their competence up perfectly.

Whilst i am sure you know best others might disagree.

BTW what industry do you work in? I would be interested so, with no real idea about the challenges faced in your daily work i can come on the internet and castigate you and your competency. Please let me know.
 

Tetchytyke

Veteran Member
Joined
12 Sep 2013
Messages
17,518
Location
Isle of Man
If the work had been done properly it would work. As it is, London Midland may as well permanently stick "delays due to signalling failures in the Bushey area" on their website. It's pathetic and it's getting tiresome.

I suppose yesterday's broken rail at Kings Langley was an interesting change from the usual, although it doesn't make me think Network Rail are any more competent.
 
Last edited:

DarloRich

Veteran Member
Joined
12 Oct 2010
Messages
32,909
Location
Fenny Stratford
If the work had been done properly it would work. As it is, London Midland may as well permanently stick "delays due to signalling failures in the Bushey area" on their website.

I suppose yesterday's broken rail at Kings Langley was an interesting change from the usual.

Interesting you dont want to let me know what you do for a living. Seems ok for you to throw wild accusations around but not accept any your self.

Also you seem certain that the recent work done at Watford was responsible for the problerms today.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,915
Location
Mold, Clwyd
Just to confirm the order of events:

1: Points problem (Bourne End) - trains only able to run north on Down Slow.
2: Signal 3150 on up fast starts playing up - trains talking past.
3: Broken down train just after Bourne End, delaying services by an hour. Trains unable to cross over Bourne End due to points failure.
4: Euston departures suspended for about 30/45 mins.
5: Trains stacked at Milton Keynes, Rugby, Nuneaton.

All lead to many, many delay minutes.

Nothing to do with the Watford work then.
This is the "off the shelf" kit that should be fully bedded in and reliable.
 

HarleyDavidson

Established Member
Joined
23 Aug 2014
Messages
2,544
Nothing to do with the Watford work then.
This is the "off the shelf" kit that should be fully bedded in and reliable.

You cannot expect the cheap crap that they install on the network to be reliable. The British want excellent reliability & resilience, but aren't prepared to pay for it, so buy cheap and you get this sort of cr4p.
 

carriageline

Established Member
Joined
11 Jan 2012
Messages
1,897
But is it actually new kit? I understand Watford box is mostly SSI anyway, and most of the work thus far has been Pway, removing some points and OHL work. Therefore nothing should be being added. Normally the work would be done when it's being resignalled, as the two control systems are often different.

Although in this case, both WEmbley mainline and Watford are both solid state interlockings, therefore it will just be a recontrol when it goes to wembley. So it's a possibility things have been put in, and signed into use at Watford as it uses the same control as Wembley.


Sent from my iPhone using Tapatalk
 

Kristofferson

Member
Joined
23 Nov 2012
Messages
1,132
Deary me, it hit a signalling cabinet?

I'm starting to think the blockade would have been better!
 

carriageline

Established Member
Joined
11 Jan 2012
Messages
1,897
To be honest, even if it was a long blockage the same could of happened then.


Sent from my iPhone using Tapatalk
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,915
Location
Mold, Clwyd
You cannot expect the cheap crap that they install on the network to be reliable. The British want excellent reliability & resilience, but aren't prepared to pay for it, so buy cheap and you get this sort of cr4p.

It was so cheap it only cost £8 billion. :cry:
Seriously, I thought the Rugby SSC work was quality stuff to the best spec, and had the best NR brains on it.
If not, why not?
 

harz99

Member
Joined
14 Jul 2009
Messages
913
And the flooding at Carlisle, its been quite a day for Virgin Trains.

It was north of Lockerbie. When I walked past LOC station at 0950 there was a northbound 185 sitting in the platform that was still there at 1030. It affected both lines and caused delays of 60+ minutes to several services.
 

455driver

Veteran Member
Joined
10 May 2010
Messages
11,329
If the work had been done properly it would work. As it is, London Midland may as well permanently stick "delays due to signalling failures in the Bushey area" on their website. It's pathetic and it's getting tiresome.

I suppose yesterday's broken rail at Kings Langley was an interesting change from the usual, although it doesn't make me think Network Rail are any more competent.

If the work could have be done from start to finish in one go then it would work (probably), but because you lot didnt want a blockade it is being done bit by bit, new bits are being cobbled onto the old stuff, next week that old stuff will be replaced with new stuff with the tie-in being further along, the week after that bit will be replaced with new etc etc.

If it could have been done in one hit then there would have been a lot less connections, it could have been properly tested and would have been handed back complete!

Would you take your car in for half a repair and then back the following week for the rest to be done?
No!
Why not?
 