Considering the signalling has not even been upgraded yet, it just proves how much this upgrade is needed!
Considering the signalling has not even been upgraded yet, it just proves how much this upgrade is needed!
More delays again today through Harrow & Wealdstone.
All Line Rover:1975545 said:More disruption on the WCML this morning. Signalling problems through Watford Junction (again) causing delays of up to 45 minutes.
This is getting silly now. The WCML has gone from one of the most reliable railways in the country, to a joke that rivals the GEML for unreliability.
Dear Network Rail... just give up, pack up, and go home. If it ain't broke, don't mess with it!
Moggie's post further up is probably what's happening.
The resignalling works HAVENT added anything to the current signalling system. Maybe it's just bad luck?
They sort of have and sort of haven't. Many of the new signals are now in place, especially at the north of Watford, where today's signal failure was. They're not activated, but the infrastructure is in. I've seen others on here, like Moggie, mention that the issue seems to be the new hardware is trying to operate when it shouldn't, and it's confusing the system. I'm no signalling engineer so I don't know if that's true, but it would figure.
It should have been done properly or not at all. The current situation is ludicrous. It may hopefully get a little better in December; the equipment will still be rubbish but the "Watford flyer" from Junction to Euston will not be running, so there are fewer trains.
The delays through Watford were quickly resolved. Everything was back to normal by 10am.
I'm now up to sixty quid in rail vouchers since July, which is impressive given that a 30 minute delay is only £3.70.