Does anyone have any more information regarding the problems at KGX tonight?
NRE are reporting signalling problems just outside the station, anyone know exactly what's happened?
Isn't there any sort of backup system in place that would allow reduced running (before it reached the point of needing temporary block working) - especially for a major station like Kings X
Nope. Unfortunately signalling doesn't ring up the signaller and say "Sorry I'm going sick, you're going to have to do without me" It just goes kaput without warning.
So if trains were running from 10pm, why were GNR unable to run an acceptable service the following day?
Isn't there any sort of backup system in place that would allow reduced running (before it reached the point of needing temporary block working) - especially for a major station like Kings X
So if trains were running from 10pm, why were GNR unable to run an acceptable service the following day?
So the answer to GNR providing an unacceptable service this morning, was it failed to anticipate the resource needed to get the trains in the correct location in the following 7 hours.
How on earth do you expect them to anticipate this sort of thing with sufficient notice to get crews in to shuffle things around overnight? Drivers don't grow on trees, and clearly the crystal ball was broken that day...So the answer to GNR providing an unacceptable service this morning, was it failed to anticipate the resource needed to get the trains in the correct location in the following 7 hours.
So the answer to GNR providing an unacceptable service this morning, was it failed to anticipate the resource needed to get the trains in the correct location in the following 7 hours.
It might be ok from a driver's point of view, but I don't like the sound of the signalman being required to carry out the duties of two handsignalmen as well as his own already inflated duties. Putting virtually all of the responsibility for the safe working of trains through the affected section onto one chap doesn't sound like the best idea either - the handsignalmen are there for a reason, after all!Of course you can always use a Temporary Special Working Ticket system, which is on long term trial on SWT.
I've used it and it's quite easy to instigate and it keeps things moving providing the driver has the correct form on them.
The service that they managed to cobble together with the available resources.
May I recommend the following alternative modes of transport as you are obviously so completely dissatisfied with the service that they managed to cobble together with the available resources.
Bus, Bike, Scooter, Motorcycle, Tube, Taxi, Car, Walk.![]()
Exactly, it was a cobbled together service this morning, rather than a professionally delivered service.
It is not rocket science to model various problems and the solutions you need to take to solve them.
However GNR (and FCC before them) don't seem to have any desire to do so.
Why were there insufficient trains at Peterborough this morning? Was it impossible to get the trains there, or could someone simply not be bothered, because there is no downside if they run short trains?
Trains are now slowly departing London; the 22:00 Kings Cross to Newcastle isn't expected to get into Newcastle until 04:46, should have arrived at 02:14 if that gives a idea of the disruption.
Haven't we already answered your last question? Some of the trains that should have been at Peterborough would have finished in the wrong place as a result of the disruption. The late turn drivers, already delayed, would be running out of hours to start shifting things around overnight (even if they were willing to). There might have been a certain amount of spare cover on nights, but nowhere near enough again. What else do you expect them to do?Exactly, it was a cobbled together service this morning, rather than a professionally delivered service.
It is not rocket science to model various problems and the solutions you need to take to solve them.
However GNR (and FCC before them) don't seem to have any desire to do so.
Why were there insufficient trains at Peterborough this morning? Was it impossible to get the trains there, or could someone simply not be bothered, because there is no downside if they run short trains?
Haven't we already answered your last question? Some of the trains that should have been at Peterborough would have finished in the wrong place as a result of the disruption. The late turn drivers, already delayed, would be running out of hours to start shifting things around overnight (even if they were willing to). There might have been a certain amount of spare cover on nights, but nowhere near enough again. What else do you expect them to do?
There's an infinite number of scenarios - not just "signalling failure at X", but also considering the position of all the trains and crews at the time of the failure, the estimated time of rectification, time of day and travel patterns at that time and many more. Yes, there'll be a set of contingency plans that can be brought off the shelf if necessary, but none of them could ever hope to be an exact fit to the situation as it stands.
My thoughts exactly. I don't doubt that it's good for performance, and that, in turn, reduces the risks elsewhere on the job (trains approaching signals at danger etc). Does the increased risk of an oopsie outweigh that? I don't know, but I don't to be the one who puts two in a bed because of the excessive workload and removal of some of the controls associated with proper TBW...!I do agree with both of you, but knowing the pressure we can be put under, I can quite easily see someone having 2 in a section at some point. The idea on paper is good, and you say it's easy yes, but who for? The driver is near enough no different, But it puts more a lot more pressure on the signallers, who is also dealing with countless drivers calling in, control, trust clerks, S&T trying to fix the fault, people else where requesting line blockages, signalling normally in unaffected sections, Aswell as trying to be HSM. in times of failure when you have no indications or describes it could create a scenario where you could accidently put one in an occupied section.
From what I understand, the trial wasn't the busiest stretch of line? Try doing thay on the fasts and slows through clapham junction and see what a brilliant idea it is then!
Sent from my iPhone using Tapatalk
...yet we (the industry as a whole, not us personally) still seem to be expected to pull drivers out of a hat at a moment's notice!Pretty much what I said in #post 7 but of course you're done so in more detail![]()
Haven't we already answered your last question? Some of the trains that should have been at Peterborough would have finished in the wrong place as a result of the disruption. The late turn drivers, already delayed, would be running out of hours to start shifting things around overnight (even if they were willing to). There might have been a certain amount of spare cover on nights, but nowhere near enough again. What else do you expect them to do?
There's an infinite number of scenarios - not just "signalling failure at X", but also considering the position of all the trains and crews at the time of the failure, the estimated time of rectification, time of day and travel patterns at that time and many more. Yes, there'll be a set of contingency plans that can be brought off the shelf if necessary, but none of them could ever hope to be an exact fit to the situation as it stands.
Handsignallers are difficult to source, and not readily available like they once was.
Out of interest, where do you source them from? I assume they are Network Rail employees diverted from other duties, but what would they normally be doing?