I appreciate the points you make,about the return 0824 service to the large towns of Shropshire, only time will tell,but i'm wondering what occurred when the up 0530 train from Chester went to Maesteg, did it split at Shrewsbury?

I've just seen a letter from the Minister to my AM stating December 2014 will be the biggest timetable change in North Wales since 2008.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Class 170101

On Moderation
Joined
1 Mar 2014
Messages
8,662
A connection that is surprisingly popular.



It's worked by a Cardiff crew from there to Shrewsbury, so it's an early sign on.

Then signing on earlier isn't exactly going to prove popular if it departs earlier from Cardiff to connect at Shrewsbury,
 

PHILIPE

Veteran Member
Joined
14 Nov 2011
Messages
13,472
Location
Caerphilly
I appreciate the points you make,about the return 0824 service to the large towns of Shropshire, only time will tell,but i'm wondering what occurred when the up 0530 train from Chester went to Maesteg, did it split at Shrewsbury?

I've just seen a letter from the Minister to my AM stating December 2014 will be the biggest timetable change in North Wales since 2008.

No Bob. Just 1 through unit and connected into a starter at Shrewsbury to Birmingham, which now starts back at Chester with 2x158s.
 

merlodlliw

Established Member
Joined
8 Mar 2009
Messages
5,852
Location
Wrexham/ Denbighshire /Flintshire triangle
No Bob. Just 1 through unit and connected into a starter at Shrewsbury to Birmingham, which now starts back at Chester with 2x158s.

Thanks for that Philipe.

I note a special "Route Proving Run" run is to take place between Wolverhampton and Shrewsbury next Saturday according to todays North Wales news board.Is this the first Voyager to visit Shrewsbury.

North Wales News Board 14th October written by Charlie Hume Editor
"Virgin Trains are planning a 'Route Proving Run' with a Class 221 Voyager on Saturday 18 October in advance of the start of through service between London and Shrewsbury. Train 1Q62, Wolverhampton dep 10:32, Shrewsbury arr 11:32. 1Q63 Shrewsbury dep 13:15, Wolverhampton 13:46-13:49, continues to Barton-under-Needwood depot 14:54. It would be interesting to see a picture of this at Shrewsbury."
 

merlodlliw

Established Member
Joined
8 Mar 2009
Messages
5,852
Location
Wrexham/ Denbighshire /Flintshire triangle

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,723
Why would it be a passenger service? The very nature of it tells you it wouldnt be. It will be to test stepping distances, station operations, running times etc....
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,060
Location
Reston City Centre
Why would it be a passenger service? The very nature of it tells you it wouldnt be. It will be to test stepping distances, station operations, running times etc....

Going off topic, but do you reckon we'll ever be able to just "model" such runs, without having to run a "Route Proving Run" service?

Given that we surely know the dimensions/envelope of the Voyager and what trains already fit along the line to Shrewsbury, I wonder whether one day we'll be able to trust that one would fit (e.g. if a 23.71m 175 coach* can fit then do we need to find a spare Voyager/ find a spare path/ find spare crew to test the clearances? can't we trust the timings that 175s cope with?)

Does the Network Rail New Measurement Train not provide all of the answers?

(obviously there'll need to be driver training etc done, it just seems like quite an expensive/ complicated/ time consuming exercise to go for in the modern age)

* - figure taken from Wiki, I appreciate that 23.62m long 170s and 23.2m 153/158s are more regular on that route than a 175, and that the extra fourteen centimetres between a Voyager coach and a 175 coach will have to be taken in to account, but this is more of a general question about whether computer simulations will one day be enough to certify route clearance etc
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,723
All of it has been computer modelled, from the running times to the gauge clearance etc, but all of that is a desktop exercise and what happens in reality is always better to find out before you go into service.
 

Rich McLean

Established Member
Joined
6 Feb 2012
Messages
1,757
Also Cosford Station has been rebuilt since they last run on the line. Not likely to be an issue, but always worth double checking
 

Class 170101

On Moderation
Joined
1 Mar 2014
Messages
8,662
This modelling is all well and good providing humans (a) stick to the rules and (b) the rules make sense in the first place.

I understand a Class 91 set dragged by a Class 67 went around the Durham Coast before they were offically route cleared and that a 170 went to Liverpool Street via Cambridge, Harlow, Tottenham Hale and Hackney Downs before they were route cleared.
 

merlodlliw

Established Member
Joined
8 Mar 2009
Messages
5,852
Location
Wrexham/ Denbighshire /Flintshire triangle
North Wales Rail website have pictures of the Shrewsbury Voyager Trial,taken from the signal box. Heres some comment written by the editor

"We hoped someone would photograph 18 October's gauging run to Shrewsbury by a Virgin Trains Class 221 Voyager in preparation for the start of the through trains to London in December, and here they are, with many thanks to Mike Jones, signaller at Abbey Foregate. Above, it is heading for bay platform 5 after checking for fit, platform edges and 'S stop' sign placement."

link http://nwrail.org.uk/nwnews.htm
 

craigybagel

Established Member
Joined
25 Oct 2012
Messages
5,829
Theres one at the north end of platform 4, it's been there a few weeks. The existing S board on platform 4 has been moved further north as well.
 

merlodlliw

Established Member
Joined
8 Mar 2009
Messages
5,852
Location
Wrexham/ Denbighshire /Flintshire triangle
Theres one at the north end of platform 4, it's been there a few weeks. The existing S board on platform 4 has been moved further north as well.
At least it wont be like Wrexham,here the arriving voyager has to travel a good mile past the Hospital box on the up line to be switched on the down to platform
two, I watched this on Tuesday morning, very time consuming.
Has an aside, building work has commenced on the new joint Ambulance/Fire station on the South of the hospital thus eventually taking away emergency vehicles from near the hospital level crossing on Rivulet Road,
The current Ambulance station is next door to Morrison's,which is built on the old Croes Newydd engine sheds area, the store was delayed over a year due to traffic concerns for ambulances, The fire station is currently situated next to the Bidston line railway bridge East of the hospital level crossing.

Bob
 
Last edited:

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,311
Location
Bolton
Modern Railways reported this month that VT were looking at a dedicated First Class crew for these trains. I wonder if anything came of it. Some of their First Class hosts are almost too enigmatic for their own good as it is. Anyway we'll see if anything comes of it I suppose.
 

crewmeal

Member
Joined
1 Dec 2007
Messages
462
Location
Birmingham
Modern Railways reported this month that VT were looking at a dedicated First Class crew for these trains. I wonder if anything came of it. Some of their First Class hosts are almost too enigmatic for their own good as it is.

Probably because the Transport Minister plus local MPs were onboard for the first service. After all they require first class service where ever they go :(
 

Gareth Marston

Established Member
Joined
26 Jun 2010
Messages
6,231
Location
Newtown Montgomeryshire
Around 40 people in Standard on departure of the 1524 to Euston today, about 1 in first. they held it in 5 since arrival earlier so 1519 arrival from INTL went onto 4 instead of 5 and 1525 arrival from Aberystwyth was kept stopped on the posts on English Bridge and arrived slightly late into 5 instead of the usual 4.
 

vtpendolino

New Member
Joined
16 Dec 2014
Messages
2
Not sure if VT crewing will be able to roster a fixed crew on these trains every day, but as it stands all Shrewsbury services on the weekdays are rostered with three members of staff on what I believe is a single voyager (going forwards from Birmingham New Street) as opposed to the usual two members of staff rostered on other services. All Shrewsbury services are operated with Wolverhampton based catering crew, with the exception of the back set of the 10:23 departure which has two Euston based crew working it who only go as far as Birmingham and then return on the 12:30 departure south.

An interesting point to make is the 16:33 Blackpool North service is actually crewed by Carlisle based catering crew! So would be interesting to know their knowledge, if any, of what to see and do in Blackpool. It's also a very long day for them, they travel down to London on the 09:40 ex Glasgow, up to Blackpool, pass back on empty stock to Preston and then pick up the 18:30 ex Euston to take them home.
 

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,875
Location
East Anglia
An interesting point to make is the 16:33 Blackpool North service is actually crewed by Carlisle based catering crew! So would be interesting to know their knowledge, if any, of what to see and do in Blackpool. It's also a very long day for them, they travel down to London on the 09:40 ex Glasgow, up to Blackpool, pass back on empty stock to Preston and then pick up the 18:30 ex Euston to take them home.

Seems rather excessive to bother with catering between Preston & Blackpool. Wonder how long it will be until the shop closes after Warrington with crew bailing at Preston to head home?
 

vtpendolino

New Member
Joined
16 Dec 2014
Messages
2
Exactly, any delay on the way up from London and they will bail at Preston to ensure they don't miss their departure from Preston, even if it means a lengthy wait there.

I agree with the reasoning for what surely will be a very small demand for catering facilities between Preston and Blackpool North. Spare a thought for the morning crew (Preston based) who have to board the empty stock at 04:50 to take them to Blackpool. Randomly, the train is only timetabled to wait there 7 minutes before departing (arrival 05:18, dep 05:25) which from my memory of Blackpool North's archaic boarding procedures, doesn't leave much time!!
 