• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Least appropriate use of Pacers?

Status
Not open for further replies.

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,414
Location
Yorks
However lots of that will go to waste unless there are enough jobs to service the capacity that such schemes can provide. That needs investment too and a more sensible government policy on employment generation in run down areas. Unless the leeching of jobs south stops soon there will be very little quality employment (or wealth) left in the north. There also needs to be an acceptance that in getting better services and infrastructure some more of the cost has to be carried by the passenger.

How much additional capacity will the trans-pennine route be getting when electrified ? I'm sure it wasn't a huge increase, yet these routes are already crowded a lot of the time.

Similarly, in the case of the 142's we're looking at replacing life expired vehicles (which have already been paid for, lest we forget) before we even get to additional capacity.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Parallel

Established Member
Joined
9 Dec 2013
Messages
4,535
Didn't Arriva send one up the Heart Of Wales line a few months ago?? That can't have been good, although it only made it to Llandrindod as they are not cleared for north of Craven Arms IIRC? And Shrewsbury crews are not trained on how to work them.
 

duffers2324

Member
Joined
1 May 2014
Messages
185
Location
Glasgow
All i can say is thank god we dont get pacers here in Scotland because most people if not all who are subjected to using them day in-day out just downright despise them i think if my mind serves me right i have only had the privilage of being on a pacer once and that was goin on holiday to Morecambe. I think i will stick with our Class 156's and 170's anyday
 

Tetchytyke

Veteran Member
Joined
12 Sep 2013
Messages
17,635
Location
Isle of Man
Fine – but neither are you offering realistic reasons why equal funding would be equitable

Unless the leeching of jobs south stops soon there will be very little quality employment (or wealth) left in the north.

Have you ever stopped to think that these two ideas are linked? People and jobs migrate southwards because that is where the investment is. Invest and people will come, as anyone who's been to Stratford recently will tell you.

Without the infrastructure the northern cities will never be able to retain their top talent. And in most northern cities there simply isn't the infrastructure there to ensure the top regional companies can keep their talent.

Newcastle is choked with traffic because the bypass, built in the late 80s, was overcrowded on the day it opened. The Metro system is overcrowded and life-expired, with no prospect of funding to upgrade it. Leeds is choked with traffic because there is no public transport network that cuts through the traffic queues. In Manchester Metrolink is severely overcrowded and, away from the trams, we're still stuck with 1980s freight wagons instead of proper trains.

London's stations are busier because the infrastructure is there to encourage use. Manchester, Leeds, Newcastle and Liverpool are quieter stations because, quite simply, the poor standard of public transport is not a viable alternative to the car.
 

Wolfie

Established Member
Joined
17 Aug 2010
Messages
7,437
No, because you will just say yours is bigger and better. Size is not everything you know. Don't, won't or can't is perceptive of you. Won't is the answer until the North gets a fairer share of the cake.

50p a mile subsidy and you want more? I suggest you rename yourself Oliver Twist! Oh, and he didn't get what he wanted either!!!
 

DarloRich

Veteran Member
Joined
12 Oct 2010
Messages
32,942
Location
Fenny Stratford
How much additional capacity will the trans-pennine route be getting when electrified ? I'm sure it wasn't a huge increase, yet these routes are already crowded a lot of the time.

Similarly, in the case of the 142's we're looking at replacing life expired vehicles (which have already been paid for, lest we forget) before we even get to additional capacity.

Wont TP electrification require a whole new fleet of trains?

Regardless of having paid for the pacers over and over (and over and over and over again) more of the investment for new rolling stock burden has to be borne by the passenger. That means higher fares.

My point is that with more electrification comes a need for the appropriate investment to deliver new electric rolling stock, helping to remove the older stock.

Have you ever stopped to think that these two ideas are linked? People and jobs migrate southwards because that is where the investment is. Invest and people will come, as anyone who's been to Stratford recently will tell you.

I used to think that but now I am not sure. You could erect vast numbers of shiny new offices and i think they would stand empty UNLESS companies are incentivised to disperse their operations.

Without the infrastructure the northern cities will never be able to retain their top talent. And in most northern cities there simply isn't the infrastructure there to ensure the top regional companies can keep their talent.

Agreed - However i think that there are insufficient jobs generally in the north and north east in particular - investment in the railways alone wont change that.

We need more jobs and more local opportunities before we need shiny new trains

Newcastle is choked with traffic because the bypass, built in the late 80s, was overcrowded on the day it opened. The Metro system is overcrowded and life-expired, with no prospect of funding to upgrade it.

Which by pass? Do you mean the 60's central motorway? The metro needs investment to continue operation but also to expand services to other areas - but that wont happen soon as there is no realistic prospect of making a return on the investment

Leeds is choked with traffic because there is no public transport network that cuts through the traffic queues. In Manchester Metrolink is severely overcrowded and, away from the trams, we're still stuck with 1980s freight wagons instead of proper trains.

The Leeds trams were scrapped by the last government - A mistake in my mind

London's stations are busier because the infrastructure is there to encourage use. Manchester, Leeds, Newcastle and Liverpool are quieter stations because, quite simply, the poor standard of public transport is not a viable alternative to the car.

I disagree - bluntly the poor number of jobs, the relatively low parking costs and the affordability of housing closer to work makes for less people traveling into the cities by train for work.

The infrastructure can be expanded to meet the demand - in the north the demand isn't there. I cant see how it will be there unless:

a) The government begin a programme of incentivised dispersed activity to the regions. Essentially PAY companies to move and move civil service employees at the same time

and at the same time

b) Promise and deliver targeted infrastructure investment to facilitate better travel
 
Last edited:

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,414
Location
Yorks
Wont TP electrification require a whole new fleet of trains?

Regardless of having paid for the pacers over and over (and over and over and over again) more of the investment for new rolling stock burden has to be borne by the passenger. That means higher fares.

My point is that with more electrification comes a need for the appropriate investment to deliver new electric rolling stock, helping to remove the older stock.

The only reason for paying over and over for rolling stock is to get a new train when the existing one is life expired. If this doesn't happen, there's simply no point in paying over the odds for the stock in the first place.

We have this line trotted out that a higher proportion of investment needs to be borne out by passengers. This is a political choice. The Government could decide not to try and bribe Councils to go to weekly bin collections and spend the money on a fleet of new trains instead, but it chooses not to.
--- old post above --- --- new post below ---
Agreed - However i think that there are insufficient jobs generally in the north and north east in particular - investment in the railways alone wont change that.

We need more jobs and more local opportunities before we need shiny new trains

We already have crowded trains, many of which are life expired. How crowded and life expired do they need to become before investment is forthcoming ? I grew up on the Southern Region which quite rightly built trains to last a long time, but after thirty to forty years, "shiny new trains" become a vital part of the regeneration of the railway, not a luxury.
 

DarloRich

Veteran Member
Joined
12 Oct 2010
Messages
32,942
Location
Fenny Stratford
The only reason for paying over and over for rolling stock is to get a new train when the existing one is life expired. If this doesn't happen, there's simply no point in paying over the odds for the stock in the first place.

We have this line trotted out that a higher proportion of investment needs to be borne out by passengers. This is a political choice. The Government could decide not to try and bribe Councils to go to weekly bin collections and spend the money on a fleet of new trains instead, but it chooses not to.

Agreed - but that is the position of the current government - i imagine it will be a line of policy taken by the next government

We already have crowded trains, many of which are life expired. How crowded and life expired do they need to become before investment is forthcoming ? I grew up on the Southern Region which quite rightly built trains to last a long time, but after thirty to forty years, "shiny new trains" become a vital part of the regeneration of the railway, not a luxury.

But i know many people in the north east who would be more than happy with a job rather than a new train. To them, and many more like them, arguing about how you get to work when you dont have any work is slightly meaningless!

As i have said, to me, the key to better trains is electrification - Sadly investment wont be forthcoming for new diesel trains anytime soon.
 
Last edited:

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,414
Location
Yorks
Agreed - but that is the position of the current government - i imagine it will be a line of policy taken by the next government

Yes, but that's no reason to acquiesce to it.

But i know many people in the north east who would be more than happy with a job rather than a new train. To them, and many more like them, arguing about how you get to work when you dont have any work is slightly meaningless!

As i have said, to me, the key to better trains is electrification - Sadly investment wont be forthcoming for new diesel trains anytime soon.

But it's not as though money not being spent on transport infrastructure will be diverted to a jobs creation scheme in the North East, so it's a meaningless "choice". If anything, a knackered public transport system will make employment even less likely for those residents.

I agree that electrification is needed, but to try and pin everything on it is the tail wagging the dog. We need to look at the type of railway service we need and whilst electrification will be a big part of that, there's simply no point in running parts of the network into the ground, just to satisfy some ideological fixation against new diesel trains.
 

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,338
Location
Bolton
But i know many people in the north east who would be more than happy with a job rather than a new train. To them, and many more like them, arguing about how you get to work when you dont have any work is slightly meaningless!

Not really, because the quality and pricing of available transport in an economy are very important to predicting how it will grow and change over time. That new transport infrastructure, faster or better trains or new services will have a significant impact on the local economy, where there is a good chance that any such people will be looking for jobs!

The government is not interested in public transport however because its users are not seen as such a key voter group, despite the obvious unsustainability of car economy.
 

infobleep

On Moderation
Joined
27 Feb 2011
Messages
13,453
Not really, because the quality and pricing of available transport in an economy are very important to predicting how it will grow and change over time. That new transport infrastructure, faster or better trains or new services will have a significant impact on the local economy, where there is a good chance that any such people will be looking for jobs!

The government is not interested in public transport however because its users are not seen as such a key voter group, despite the obvious unsustainability of car economy.

If they are not interested in public transport users, why HS2? That's not exactly for car users to drive along is it.
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,414
Location
Yorks
If they are not interested in public transport users, why HS2? That's not exactly for car users to drive along is it.

Shiny new toy. Whitehall and Westminster feel that the day to day needs of passengers on the “bread and butter“ railway are beneath them. Particularly Northern passengers.
 

ChiefPlanner

Established Member
Joined
6 Sep 2011
Messages
8,337
Location
Herts
Didn't Arriva send one up the Heart Of Wales line a few months ago?? That can't have been good, although it only made it to Llandrindod as they are not cleared for north of Craven Arms IIRC? And Shrewsbury crews are not trained on how to work them.

Certainly in late BR days - 143 were used on the Swansea - Llandovery short workings -a crew I spoke to quite liked them for the spacious cab and better vision of some of the tricky crossings on the line.
 

deltic08

On Moderation
Joined
26 Aug 2013
Messages
2,907
Location
North
...compared to the best part of £20m being spent on a new entrance at Leeds (that won't add any extra platforms or allow any trains to be lenghened)?

TBH I think that seventeen platforms would be enough at Leeds if trains were longer. Plus, if you electrify more routes, you improve the interworking (e.g. an incoming Harrogate service currently has to wait at Leeds, taking up platform space, before becoming the next outgoing Harrogate service - if Harrogate were electrified then the incoming Harrogate EMU could form the next outgoing Ilkley EMU, thus less layover required)... the "electric horseshoe would allow London services to only occupy a platform at Leeds for five or ten minutes... little things add up.

The problem that Leeds has is train lengths - the short Pacers and Sprinters at Leeds aren't banging up against platform capacity - I can't think of many platforms where there'd be problems if they became a 4x20m EMU (like a 319).

I totally agree with you on the point about the South entrance, but there is a problem with crowding and flow at the main barrier.

There would be no capacity problems replacing Pacers/Sprinters with 4-car electric units. 333s operate without difficulty and two can be accommodated in the same bay platform to different destinations.

To rid Yorkshire of Pacers an accelerated programme of electrification is required. The Harrogate Loop needs 9 sets (2x2-cars) each day for the timetable. Electrification, costed at £99m for 61 single track miles, would release 18 Pacers for withdrawal replaced by 9 317/319/321 units. NW electrification will replace 30-40 Pacers and trans-Pennine wiring probably another 10. That is half replaced on only five routes electrified at a cost of £700m in infrastructure.

Further electrification is limited by availablilty of displaced units from the Southeast.

Ten minutes is not long enough to turn round a London train at Leeds. It is cleaned, tanked and catering restocked. A bigger margin is allowed for any late running of incoming trains.
 
Last edited by a moderator:

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,368
Yes but the electric horseshoe means trains wouldn't be turned at Leeds.

They would be turned someplace that isn't as hard pushed for platform space.
 

deltic08

On Moderation
Joined
26 Aug 2013
Messages
2,907
Location
North
50p a mile subsidy and you want more? I suggest you rename yourself Oliver Twist! Oh, and he didn't get what he wanted either!!!

He did eventually.
--- old post above --- --- new post below ---
Yes but the electric horseshoe means trains wouldn't be turned at Leeds.

They would be turned someplace that isn't as hard pushed for platform space.

Where do you suggest if not Leeds?
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,368
Where do you suggest if not Leeds?

Considering 225s have sufficient catering supplies, water tanks and similar for a very long run to Glasgow they almost certainly have sufficient supplies to manage a London-Leeds round trip in one go. And KGX is not going to have constrained platform capacity in the future once its reduced to InterCity trains and the Cambridge Cruisers so a longer replenishment there is not a big issue.

If not perhaps they should put some additional catering materiel in the DVT so they can base the 'cold' elements of the first class offering from there, freeing space in the galley.
 
Last edited:

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,061
Location
Reston City Centre
Capable and suitable/appropriate are two different things. Indeed, all the classes you mention are capable of working middle-distance services but the 175 is the only one of those classes which has the door layout to make it appropriate for regional express services. The door configuration of the other units makes them outer-suburban types. Yes, outer-suburban services are middle-distance services, but they arre middle-distance secondary services with more stops. They are not the middle-to-long-distance primary fast services (such as TPE between Leeds/York and Manchester/Liverpool, the Cardiff-Portsmouth service and the Manchester-Swansea part of ATW's MAN-CMN/Milford route)

The fact is that stock with doors closer to the middle of the coaches (166, 170 185, 350s etc) are used on some "middle distance" services.

You may not like this, you may prefer to have all doors at the carriage end, but that's just your personal opinion - most people seem to cope with this okay.

PS: "Outer suburban" suggests a service that doesn't leave the boundaries of one city - it's not a phrase I'd use to describe 100mph units like the ones mentioned above.

You've probably already heard this from me, but if my brother (not a rail enthusiast by any means, and somebody who very rarely uses trains) is sent off to Nottingham (we dropped him at Port Talbot) and reports back that 'the doors were in the wrong place', what does that tell you?

Obviously I don't know your brother, but I think that you come from a relatively rural part of southern Wales (?) - and the majority of stock along the South Wales Main Line has doors at the end of the carriages (142, 143, 158, 175, HST), so it's hardly surprising that someone used to those kind of trains felt that doors closer to the middle of a carriage was "wrong" - if all of your railway experience was of "end" doors then of course you'd be surprised to find the doors somewhere else (just like if all of your railway experience was of diesel trains then you'd be surprised to find electric trains).

Hardly proof that the rest of the world is "wrong" though.

Are you sure about the "poor acceleration", relative to Pacers? My perception as a passenger is that a heavily-laden 142 really struggles to move off from a stand, particularly if the rails are at all slippery

That's hardly damning about Pacers.

Most trains will struggle with a full load of passengers on slippery rails - even the saintly 323s struggle in "leaf fall" season.

How much additional capacity will the trans-pennine route be getting when electrified ? I'm sure it wasn't a huge increase, yet these routes are already crowded a lot of the time

I thought that the plan was for six/ hour on the Manchester - Huddersfield - Leeds corridor (presumably all at least four coaches long, maybe with something like a 365 as a benchmark of the type of stock you could expect - probably a number of services running as six or eight coaches), plus the current couple of stoppers east of Huddersfield, which would add up to a reasonable increase in capacity.

All i can say is thank god we dont get pacers here in Scotland because most people if not all who are subjected to using them day in-day out just downright despise them

They do run to Dumfries, from time to time, AIUI

I totally agree with you on the point about the South entrance, but there is a problem with crowding and flow at the main barrier

I agree that something needs to be done at Leeds, just like I agree that something needs to be done about platform lengths at Waterloo.

The fact is that there are always upgrades that don't increase the number of platforms (such as lenghening the existing platforms at Waterloo, or building a further entrance at Leeds). I just thought it unfair to complain about the money being spent at Waterloo, without giving context.

To rid Yorkshire of Pacers an accelerated programme of electrification is required. The Harrogate Loop needs 9 sets (2x2-cars) each day for the timetable. Electrification, costed at £99m for 61 single track miles, would release 18 Pacers for withdrawal replaced by 9 317/319/321 units. NW electrification will replace 30-40 Pacers and trans-Pennine wiring probably another 10. That is half replaced on only five routes electrified at a cost of £700m in infrastructure

We are already committed to wiring around a thousand miles in CP5, some of which is going to be delayed, so I don't think there's any realistic hope of anything more (beyond the idea of privately financing Selby to Hull).

Whilst I'd like the Harrogate line to be wired, and think it has a good chance in CP6, I can't see it being accelerated.

Ten minutes is not long enough to turn round a London train at Leeds. It is cleaned, tanked and catering restocked. A bigger margin is allowed for any late running of incoming trains.

Yes but the electric horseshoe means trains wouldn't be turned at Leeds.

They would be turned someplace that isn't as hard pushed for platform space.

Where do you suggest if not Leeds?

Considering 225s have sufficient catering supplies, water tanks and similar for a very long run to Glasgow they almost certainly have sufficient supplies to manage a London-Leeds round trip in one go. And KGX is not going to have constrained platform capacity in the future once its reduced to InterCity trains and the Cambridge Cruisers so a longer replenishment there is not a big issue.

If not perhaps they should put some additional catering materiel in the DVT so they can base the 'cold' elements of the first class offering from there, freeing space in the galley.

As HSTEd says, the plan was to run round the "horseshoe", so that a train would go London - Doncaster - (Hambleton) - Leeds - Wakefield - Doncaster - London.

It'd take under five hours, so shorter than many EC services to Scotland (which cope with a ten minute break at Waverley) - which would free up a lot of "platform minutes" at Leeds each hour. Having one platform at Leeds almost solidly occupied by a 225 set is a waste of capacity.
 

Rhydgaled

Established Member
Joined
25 Nov 2010
Messages
4,861
The fact is that stock with doors closer to the middle of the coaches (166, 170 185, 350s etc) are used on some "middle distance" services.

You may not like this, you may prefer to have all doors at the carriage end, but that's just your personal opinion - most people seem to cope with this okay.
Indeed, it is a fact that trains "with doors closer to the middle of the coaches" are used on middle-distance services, including some (eg. the Cardiff-Nottingham service I mentioned, which of course is worked by 170s) which I refer to as 'regional express'. Yes, I do not like this and yes it is my opinion, but I'm not the only one with that opinion.

It is also true that passengers can cope with it, but just because something:
(a.) is possible,
(b.) does happen and
(c.) can be coped with
doesn't make said something a good thing.

PS: "Outer suburban" suggests a service that doesn't leave the boundaries of one city - it's not a phrase I'd use to describe 100mph units like the ones mentioned above.
Outer-suburban is a term I'm pretty sure I've seen used to describe class 350s/450s, SWT's blue livery and services worked by their 450s and 458s. If the ATW Cardiff-Cheltenham stoppers are not 'outer-suburban' (which is what I have been calling them) then what would you call them? That type of service (as, I suspect, is the LM Euston-Birmingham service) is something quite different from what I would call 'regional express'.

Obviously I don't know your brother, but I think that you come from a relatively rural part of southern Wales (?) - and the majority of stock along the South Wales Main Line has doors at the end of the carriages (142, 143, 158, 175, HST), so it's hardly surprising that someone used to those kind of trains felt that doors closer to the middle of a carriage was "wrong" - if all of your railway experience was of "end" doors then of course you'd be surprised to find the doors somewhere else
Yeah, we are fairly rural in this part of south Wales. That occasion was some years ago and I can't think of an occasion he's used the train since. And I think his last use of a train prior to that was probably some years earlier still, so I doubt it is a case of being 'used' to end-doors.

We are already committed to wiring around a thousand miles in CP5, some of which is going to be delayed, so I don't think there's any realistic hope of anything more (beyond the idea of privately financing Selby to Hull).

Whilst I'd like the Harrogate line to be wired, and think it has a good chance in CP6, I can't see it being accelerated.
I can agree with you there, would be nice to see the Harrogate line electrified but unlikely to be possible in CP5 due to the volume of other work.
 

Hophead

Established Member
Joined
5 Apr 2013
Messages
1,400
As HSTEd says, the plan was to run round the "horseshoe", so that a train would go London - Doncaster - (Hambleton) - Leeds - Wakefield - Doncaster - London.

It'd take under five hours, so shorter than many EC services to Scotland (which cope with a ten minute break at Waverley) - which would free up a lot of "platform minutes" at Leeds each hour. Having one platform at Leeds almost solidly occupied by a 225 set is a waste of capacity.

I have to say that I'm at a complete loss as to why a train can approach Leeds from the Selby direction and continue to London via Wakefield within 10 minutes, but a train cannot arrive from Wakefield and depart the same way in less than 60 or so.

If the will is there (and matched by paths), there is surely no problem.
 

deltic08

On Moderation
Joined
26 Aug 2013
Messages
2,907
Location
North
As HSTEd says, the plan was to run round the "horseshoe", so that a train would go London - Doncaster - (Hambleton) - Leeds - Wakefield - Doncaster - London.

It'd take under five hours, so shorter than many EC services to Scotland (which cope with a ten minute break at Waverley) - which would free up a lot of "platform minutes" at Leeds each hour. Having one platform at Leeds almost solidly occupied by a 225 set is a waste of capacity.

This is too simplistic. The idea of the Horseshoe was to assist increasing Leeds-London service interval to thirty minutes as it was thought at the time that the Leeds-Doncaster line didn't have the capacity with new stations and thirty minute interval stopping service. It stalled because of capacity constraints on the Doncaster-Hambleton-Micklefield-Leeds route not Leeds-Doncaster. This is still a problem to-day between Micklefield and Leeds after opening of the North Doncaster chord has eased the problem for now on the ECML.

Linked to the Horseshoe was the ability to call at a proposed East Leeds Parkway station adjacent to the M1 extension. Capacity problems at this point will not allow additional stops here on a two track railway. NR have stated money will have to be spent on quadrifying Leeds-Micklefield but there is no funding in the pipeline.

Journey time to/from Leeds would be reduced considerably this way but would Wakefield passengers want to travel via Leeds?
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,368
I have to say that I'm at a complete loss as to why a train can approach Leeds from the Selby direction and continue to London via Wakefield within 10 minutes, but a train cannot arrive from Wakefield and depart the same way in less than 60 or so.

If you go in the same direction the driver stays at his post and simply waits until everyone is off the train, then waits for the dispatch and drives on as if it is a normal station stop.
If you want to reverse the train he has to get off, walk the length of the train and reboard, then perform a full set of brake and control line tests.
Additionally they then have to make a conflicting move back over the western approach.

You would run trains round the horsehoe in both directions if necessary, trains would remain on the left side of the station and would not have to cross the throat.
Although running it only in one direction would have the operational benefit that the correctly chosen direction would simplify the moves to the west of the station.
This way the horsehoe trains could be routed into either one or two platforms all the time (depending on if this is a one or two way scheme). This simplifies passenger information. (To get to London just wait on this platform).
 
Last edited:

childwallblues

Established Member
Joined
3 Jul 2014
Messages
3,881
Location
Liverpool, UK
Plenty of stock will be surplus from the South East in the next few years. I can think of 313, 315, 317 and 319 for a start. I know that they are old and "cast offs" but all could be considered better than a Pacer. When the 319s start operating out of Liverpool and Manchester early next year passengers will find four car trains replacing two car trains in a majority of cases. These passengers will certainly not complain about "hand me downs" and will probably not notice whether it is diesel or electric powered. But they will certainly notice that they have a better chance of a seat.
 

DT611

Member
Joined
7 Nov 2013
Messages
464
Plenty of stock will be surplus from the South East in the next few years. I can think of 313, 315, 317 and 319 for a start. I know that they are old and "cast offs" but all could be considered better than a Pacer. When the 319s start operating out of Liverpool and Manchester early next year passengers will find four car trains replacing two car trains in a majority of cases. These passengers will certainly not complain about "hand me downs" and will probably not notice whether it is diesel or electric powered. But they will certainly notice that they have a better chance of a seat.
completely agree. getting rid of the pacers and an increase in seating is the ultimate goal. yes the 313/315/317/319s are not new trains but if they make those 2 goals i mentioned be realized then isn't that worth been given them?
 

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,473
Location
A typical commuter-belt part of north-west England
Plenty of stock will be surplus from the South East in the next few years. I can think of 313, 315, 317 and 319 for a start. I know that they are old and "cast offs" but all could be considered better than a Pacer.

The 319 Class are a known class that will be moving northwards. Of the class 313, 315 and 317, based on the current condition, which of these are the least likely to make the journey northwards?
 

petersi

Member
Joined
24 Apr 2012
Messages
453
Class 313 they will be almost 42 years old by the time they are replaced in 2018. So unlikely to be casscaded
 

childwallblues

Established Member
Joined
3 Jul 2014
Messages
3,881
Location
Liverpool, UK
I think that when electric services start early next year the displaced stock will be used to strengthen existing overcrowded services. When Manchester-Preston-Blackpool North together with Wigan NW-Bolton and Victoria-Stalybridge are electrified by 2017 then a start may be made on a cull of the 142s.
About 2017 DMUs in significant numbers should be surplus from Scotrail which may see the Pacers disappear faster than previously anticipated.
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
How much additional capacity will the trans-pennine route be getting when electrified ? I'm sure it wasn't a huge increase, yet these routes are already crowded a lot of the time.

Current suggestion is 4 x 20m EMUs will replace 170s (which operate in mainly 4 car formation) and 185s. There will be one additional service per hour between Huddersfield and Selby (the additional service will be Manchester-Selby but the Victoria-Huddersfield stopper will go meaning the same number of trains between Manchester and Huddersfield but with revised stopping patterns.)
--- old post above --- --- new post below ---
Why not look at all of the people who travel from Grindleford - Manchester (inclusive) to stations on the Southport line? Plus all of the other potentially pacerified stations in suburban Manchester to places on the Southport line, and so on? The problem is that clustering these together increases the likelihood of making a longer journey by pacer significantly.

Exactly.

As an international comparison I made a journey on a couple of all-stops services in Italy in the last few days.

One was an all-stops service operated by TrenItalia (equivalent to Buxton-Manchester) which they classed as a regional service and price tickets at 8 Euros each way.

The other was on the Roma-Lido Railway operated by ATAC, for some reason ATAC decided they could use the same type of trains as operate on the Rome Metro which have longitudinal plastic seating for a service which end to end is probably similar in length to Northwich to Manchester. However, a standard 1 Euro 50 single fare applies and is valid for onward travel in Rome, provided the journey doesn't exceed 100 minutes in length.

Now imagine if Northern classed Buxton-Manchester as a 156/158 only route and charged £6.50 each way with no return fares or onward travel allowed on the £6.50 ticket. While, on the other hand, they classed the Mid-Cheshire line as a 142 only route with a £1.20 ticket being available for Northwich-Manchester (or a shorter distance on the line), which allowed onward travel on the Metrolink or local bus services. Who would be complaining the most then?
 
Status
Not open for further replies.

Top