Wiring has begun between Ordsall Lane and Victoria.
A single run of earth wire is now up between Ordsall Lane and Salford Central.
Edit Update:
A new run of return wire is up past the Pilkingtons site west of St Helens Central, about a mile long.
All the mast sections now appear to be up near Victoria, although there are still some portal sections missing.
Mast count between Sankey Viaduct and Earlestown station now up to 4.
There are about 8 new mast bases over about half a mile between Wavertree station and the Wavertree Road overbridge, interspersed with the old masts.
All this section must be being rewired.
I counted 10 mast bases on the north side of the layout between Huyton Jn and Roby Jn.
Still impossible to visualise how this stretch will be wired, and what changes will be needed later for the 4th track.
The Balfour Beatty wiring train was parked up at Edge Hill, loaded with copper wire.
Man Vic wire is splendid news.
I toured Lime St-Wigan NW-Roby-Earlestown-Lime St today.
I made it seven masts between Sankey Viaduct and Earlestown, 3 on the North side, 4 on the South. Maybe I had double vision?
I agree all your other observations.
I could only see one missing and one possibly missing base on the South side between Huyton Station and Huyton Quarry, and that could be because the base is down the side of a section of steep embankment. If I'm right then the base piling activity discussed recently seems to have taken place.
On the North side of the same stretch I think some new bases have appeared.
I can't see any bases on the North side of Track 4 between Roby Jct and Roby Station, can anyone see any from the playing fields?
Several previously mastless bases dotted around the project now carry metal, eg North side of the North end of St Helens Central Station and off the North side of Lea Green Station.
Power wires now reach beyond Ince Moss Junction over the southbound track. Several new signals between Carr Mill and Springs Branch Jct look complete, one bagged, the others lying down.
New seats and a waiting shelter have been erected at Bryn, northbound platform. The shelter was being glazed as I passed.
I couldn't see any evidence of electrification work or preparation work on Earlestown (main line) or Rainhill stations (though the paint job at Earlestown looks good.)
Nor could I see anything on the major viaducts.
An Orange Team were laying ducting behind the fence of the eastbound platform at Wavertree Technology Park Station.
Roby lifts not yet working, but contain workings. Seats have been installed in Platform 2/3 waiting shelter.
I have added nine photos here: