Class377/5

Established Member
Joined
19 Jun 2010
Messages
5,594
So could to move to Allerton have been cancelled to allow another 319 to be refreshed at Wolverton so when both units move up there'll be 2 refreshed units?

While I don't know for sure, my info is its two 319s going under their power to Wolverton then 362/363 go north together. The move to Wolverton still needs to happen for other 319 as the C6 still needs doing.
 

Manchester77

Established Member
Joined
4 Jun 2012
Messages
2,628
Location
Manchester
While I don't know for sure, my info is its two 319s going under their power to Wolverton then 362/363 go north together. The move to Wolverton still needs to happen for other 319 as the C6 still needs doing.

I'd imagine the other 319 will run to Wolverton once 362 and 363 are at Allerton so they can crew train with some units.
 

childwallblues

Established Member
Joined
3 Jul 2014
Messages
3,809
Location
Liverpool, UK
The wires on Allerton Depot are I understand due to go live this weekend. As they have not been used for many years (since the 303/304s left the area) I should imagine a fair bit of testing is required.
Some Northern drivers are route learning Liverpool South Parkway to Crewe prior to full driver training on 319s commencing.
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
Surprising they never thought PIS was useful on a route with a varying stopping pattern and two major international airports on...

Probably because they were introduced well before PIS existed and there's always been a plan to replace them - even if it kept getting delayed.
 

Via Bank

Member
Joined
28 Mar 2010
Messages
760
Location
London
Surprising they never thought PIS was useful on a route with a varying stopping pattern and two major international airports on...

In all likelihood, one very simple reason: £££££££££

Of course, this doesn't mean it's acceptable. Given the 319s' public address system can be a little moody, the Thameslink stopping pattern, as stands, is very irregular especially during the peaks, and it's a 24-hour service serving three international gateways—plus the fact FCC's new CIS doesn't announce the current station on the platforms any more—the fact they have not been fitted with a PIS already is simply not good enough, no matter what reason is put forward for it.
 
Last edited:

AM9

Veteran Member
Joined
13 May 2014
Messages
16,019
Location
St Albans
In all likelihood, one very simple reason: £££££££££

Of course, this doesn't mean it's acceptable. Given the 319s' public address system can be a little moody, the Thameslink stopping pattern, as stands, is very irregular especially during the peaks, and it's a 24-hour service serving three international gateways—plus the fact FCC's new CIS doesn't announce the current station on the platforms any more—the fact they have not been fitted with a PIS already is simply not good enough, no matter what reason is put forward for it.

You can say that, there'll be howls of disbelief here that London and the South East don't get whatever they want irrespective of cost!
 

Islineclear3_1

Established Member
Joined
24 Apr 2014
Messages
6,579
Location
PTSO or platform depending on the weather
But your loss is our gain! :lol:

I only posted because I thought it had already gone to Wolverton...

I know these units are slated by many who travel on them on FCC but lets not forget that 319.361 - 386 were originally built as 319.161 - 186 and are actually newer than their earlier cousins, but from the state of the interiors, one wouldn't think so...

I hope the units are looked after oop north...
 

12CSVT

Established Member
Joined
18 Aug 2010
Messages
2,611
I only posted because I thought it had already gone to Wolverton...

I know these units are slated by many who travel on them on FCC but lets not forget that 319.361 - 386 were originally built as 319.161 - 186 and are actually newer than their earlier cousins, but from the state of the interiors, one wouldn't think so...

I hope the units are looked after oop north...

Give that the 319s are now around quarter of a century old, I don't think being a couple of years later off the production line will make much difference to their overall condition.
 

childwallblues

Established Member
Joined
3 Jul 2014
Messages
3,809
Location
Liverpool, UK
The wires on Allerton Depot are I understand due to go live this weekend. As they have not been used for many years (since the 303/304s left the area) I should imagine a fair bit of testing is required.
Some Northern drivers are route learning Liverpool South Parkway to Crewe prior to full driver training on 319s commencing.
The main line through Liverpool South Parkway was closed yesterday for replacement of the OHLE between Allerton Depot and the Crewe to Liverpool down fast.
 

92002

Established Member
Joined
27 Mar 2014
Messages
1,251
Location
Clydebank
You can say that, there'll be howls of disbelief here that London and the South East don't get whatever they want irrespective of cost!

Given the current state of the 319s and how well they have been looking after them. The solution would seem to give the new 387s to Northern. Don't let them anywhere near Thameslink to be wrecked. They are only after all a stopgap solution there until the 700s are delivered shortly.

Sounds like the mandarins in DfT who try and decide what goes where live and travel on Thameslink.

When the 700s arrive scrap the 319s or do them up and keep the junk down South. Where they can be given more tlc.
 

AM9

Veteran Member
Joined
13 May 2014
Messages
16,019
Location
St Albans
Given the current state of the 319s and how well they have been looking after them. The solution would seem to give the new 387s to Northern. Don't let them anywhere near Thameslink to be wrecked. They are only after all a stopgap solution there until the 700s are delivered shortly.

Sounds like the mandarins in DfT who try and decide what goes where live and travel on Thameslink.

When the 700s arrive scrap the 319s or do them up and keep the junk down South. Where they can be given more tlc.

I'm sure that if they are used as heavily in the north or anywhere else as they have been on Thameslink, and had the same amount of maintenance as FCC afforded them, their condition would be much the same. They are amongst the most intensively used stock in the UK.
The main issue for most of the South-East commuter lines is reliability under such intense working conditions rather than internal cosmetics, despite the larger than UK average white collar ridership.
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
will the next 319 to Liverpool be coming under its own power?

Apparently they need a pantograph change before they can run on the newly installed overheads, so that would need to be changed before they reach Allerton if they are to run under their own power.
 

physics34

Established Member
Joined
1 Dec 2013
Messages
4,083
Given the current state of the 319s and how well they have been looking after them. The solution would seem to give the new 387s to Northern. Don't let them anywhere near Thameslink to be wrecked. They are only after all a stopgap solution there until the 700s are delivered shortly.

Sounds like the mandarins in DfT who try and decide what goes where live and travel on Thameslink.

When the 700s arrive scrap the 319s or do them up and keep the junk down South. Where they can be given more tlc.

Junk??? How dare you say that about these beauties!! :lol:
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,902
Location
Mold, Clwyd
Given the current state of the 319s and how well they have been looking after them. The solution would seem to give the new 387s to Northern. Don't let them anywhere near Thameslink to be wrecked. They are only after all a stopgap solution there until the 700s are delivered shortly.
Sounds like the mandarins in DfT who try and decide what goes where live and travel on Thameslink.
When the 700s arrive scrap the 319s or do them up and keep the junk down South. Where they can be given more tlc.

I'm sure you realize there are reasons Northern can't have the 387s:
- they can't afford them
- 387s would need specialist depots which Northern don't have (though Virgin and TPE do)
- they could not use more than the 14 Liverpool units planned initially, so the 387 fleet would be split which is inefficient

By the end of next year, with a new franchise and rolling stock plan agreed, things might look a little different.
319s are not junk. They are very similar to the splendid 320s you have on Clydeside. ;)
 

AM9

Veteran Member
Joined
13 May 2014
Messages
16,019
Location
St Albans
Apparently they need a pantograph change before they can run on the newly installed overheads, so that would need to be changed before they reach Allerton if they are to run under their own power.

That's interesting. Do they have the Stone-Faiveley or the Brecknell Willis types? What's so special about the new NW knitting that kit that has been thrashing up the MML at 100mph and threading its way through the core for over 20 years can't cope with?
--- old post above --- --- new post below ---
Given the current state of the 319s and how well they have been looking after them. The solution would seem to give the new 387s to Northern. Don't let them anywhere near Thameslink to be wrecked. They are only after all a stopgap solution there until the 700s are delivered shortly.

Sounds like the mandarins in DfT who try and decide what goes where live and travel on Thameslink.

When the 700s arrive scrap the 319s or do them up and keep the junk down South. Where they can be given more tlc.

What a waste of 110mph capable stock. How many miles of 100mph (let alone 110mph) do the Northern routes have?
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
That's interesting. Do they have the Stone-Faiveley or the Brecknell Willis types? What's so special about the new NW knitting that kit that has been thrashing up the MML at 100mph and threading its way through the core for over 20 years can't cope with?

From what I understand it's just the latest standard of wiring in the North West and the existing 319 pantograph can't be used on that.

What a waste of 110mph capable stock. How many miles of 100mph (let alone 110mph) do the Northern routes have?

Routes or services? Northern run a number of stopping services on the West Coast Mainline which has linespeeds of up to 110mph for non-tilting stock. However, as they are stopping services they'd need super fast acceleration to be able to get above 100mph. I don't think the 319s will be able to do above 90mph on the Liverpool-Manchester Airport services but apparently the 90mph 323s have superior acceleration so are better suited to remaining on the services to the likes Crewe and Stoke.

If you going to send 110mph stock to the North then TPE services would be a better place to send them. However, TPE have services which could potentially utilise 125mph stock - Liverpool to Newcastle and Manchester Airport to Scotland.
 
Last edited by a moderator:

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,604
Location
Nottingham
However, TPE have services which could potentially utilise 125mph stock - Liverpool to Newcastle and Manchester Airport to Scotland.

Not as it stands. The speed for non-tilting trains on the WCML remains at 110mph or less, although some of it could be increased if there was a reason to.
 

deltic08

On Moderation
Joined
26 Aug 2013
Messages
2,902
Location
North
I'm sure you realize there are reasons Northern can't have the 387s:
- they can't afford them
- 387s would need specialist depots which Northern don't have (though Virgin and TPE do)
- they could not use more than the 14 Liverpool units planned initially, so the 387 fleet would be split which is inefficient

By the end of next year, with a new franchise and rolling stock plan agreed, things might look a little different.
319s are not junk. They are very similar to the splendid 320s you have on Clydeside. ;)

What do you mean Northern can't afford 387s? Explain.
 

Class377/5

Established Member
Joined
19 Jun 2010
Messages
5,594
What do you mean Northern can't afford 387s? Explain.

They will cost around four times as much as a 319. There isn't the current money to fund that. The four times figures is rental cost of refurbished is twice that of unfurnished and new is twice that of refurbished.
 