mister-sparky
Member
Gotta say terminating the 07.31 WC to LBG and 08.15 Beck to LBG at S Berms is utter madness!
Would you rather they terminated them at South Bermondsey, or cancelled them entirely?
Gotta say terminating the 07.31 WC to LBG and 08.15 Beck to LBG at S Berms is utter madness!
What is causing the Gatwick Express service at 8.46 to be cancelled?
Are these changes going to increase passenger traffic in South Ber.... . If so, i could not imagine that station coping with the increased passengers.
It technically isnt as it is being "covered" by this service which starts from Brighton at 0813 and leaves Gatwick at 0850, which currently runs 4 minutes after the current service.
http://www.realtimetrains.co.uk/train/W60070/2014/09/02/advanced
I doubt passengers are expected to travel to South Bermondsey, it's just a convenient reversing point. I think they'll want you to transfer onto LO at one of the previous stations...
Have they mentioned anything about buses?
I don't know the local area around South Bermondsey but I expect a lot of people will be put off and change to LOROL at Peckham Rye for the City (after another change at Surrey Quays?).
I don't know the local area around South Bermondsey but I expect a lot of people will be put off and change to LOROL at Peckham Rye for the City (after another change at Surrey Quays?).
Guess it's the best place to reverse without getting in the way of too much!
To be fair there are three trains within 15 minutes of one another around 7pm, although perhaps from what your saying, one of these might go. Perhaps Redhill customers should get up earlier or travel in later.
With the ongoing works when will the bridge just to the right of the line into London Bridge on the northern approach see track laid?
Its the bridge they put into place about 2 years back, no idea of exact location as its not a regular route of mind![]()
Borough Viaduct track laid from autumn 2015 and trains running over it from beginning of 2016. To become the Up and Down Charing Cross.

Bald Rick would know for sure, but I believe, from a presentation I posted a link to on the thread below, the Borough viaduct will be brought into use from January 2016.
http://www.railforums.co.uk/showthread.php?p=1850289#post1850289
Borough Viaduct track laid from autumn 2015 and trains running over it from beginning of 2016. To become the Up and Down Charing Cross.
I thought it wasn't going to be in use until everything's completed in 2018 I'm sure I read somewhere.
I thought it wasn't going to be in use until everything's completed in 2018 I'm sure I read somewhere.
There are 2 sections 2 the new works.
The new bridge across the market and a short section on the opposite side of the track when the cannon street reversing loop comes around.
Is it possible that this 2nd section won't see any use until Thameslink trains resume running though London Bridge (in 2018 if I understand correctly)
I think that's part of what Temple was getting at in his earlier post - it's certainly in the same area...
Problem (as always) seems to be that some media reports cherry pick whatever part of the story meets their agenda - in this case they would possibly be aiming to prove that the works at Borough Market weren't needed (at the time of their writing), because it could have been delayed until one weekend in late 2018 - which of course completely ignores the practicalities of conducting a phased approach to the station rebuild project...
I must say I have been wondering why the work was done so early on only to be left empty for a couple of years.
I'm sure there are good reasons though.
Maybe to do with workforce being required elsewhere at the crucial moment, or to do with site access being difficult while other works are taking place nearby.
Or maybe the bridge needs time to bed-in or something weird like that?
Or maybe, given all the controversy, there was a keenness to get past the point of no return before permission was revoked?
These are all just wild guesses of course.