Didn't really notice the speed restrictions on there to be honest. Probably says more about the line than it should![]()
1. How many driver changes will there be on that service?
Think this is in fact the link (bit of text missing?)With regard to the Dawlish line and its future, Network Rails chief executive Mark Carne and regional managing director Patrick Hallgate outlined their plans for the future of rail travel in the south west at a breakfast organised by the Institute of Directors at St Mellion International Resort (near Plymouth) this week.
A couple of quotes perhaps show what the railway experts may thinking longer term but whether the politicians will agree with them is another of course, "One added benefit of investment would be that an alternative route would be more suited to electrification in the future . At present, the seven mile coastal stretch of the railway would be difficult to upgrade because it is so vulnerable to the weather, but an alternative route would make it easier for electrification to be extended from Bristol into the peninsula." Note via Bristol!
Also "In the short term, work is now under way to make the Dawlish line more resilient by further strengthening the sea wall". Mr Carne also said: "There is a window of opportunity in the political space . It's up to communities to bring it to a conclusion.
"We're experts in railways, we're not experts in the local economy. You need to help us in being able to sell that story to government."
http://www.westbriton.co.uk/Network-Rail-promises-investment-Cornwall-s/story-
Think this is in fact the link (bit of text missing?)
http://www.westbriton.co.uk/Network...t-Cornwall-s/story-21138103-detail/story.html
but interestingly too, according to the West Briton "In Cornwall, investment is likely to be brought forward in signalling that would see control switch to a centre at Didcot in 2018/9 and 10 signal boxes close in the Duchy. Originally due to take place in 2026, this would allow timetable changes so that long distance services are not held behind local trains and, at the same time, the amount of local trains could be increased".
It certainly seems counterintuitive to close down all the signal boxes in Cornwall in order to control them from hundreds of miles away(via the Dawlish sea wall presumably) in order to ensure that long distance trains are not held behind local ones! Can this be correct?
They could route the fibre optic cables further inland if they wanted to.
They already are.
An upgrade of the signalling in Cornwall is much needed. The present arrangements mean the headway through Cornwall is roughly 20 minutes.
Network Rail announces follow-up work to Dawlish Sea Wall following successful reinstatement of train services
Downloads
Friday 30 May 2014
Wales & West
The footpath to be raised in Dawlish
The plans involve raising the sea wall in front of the site of the main breach, to provide extra resilience and support.
The sea wall runs at a high level in front of Dawlish, except for a 340 metre stretch between Coastguards Footbridge and Rockstone (aka Blackbridge) Footbridge. This section was left at a lower level when the railway was originally built in the 19th century due to pressure from a local landowner.
Now, however, the footpath will run at the higher level along the whole section. In addition to offering greater protection, this will mean that pedestrians will be able to use the footpath at high tide. Before now, the footpath was often flooded by the sea at high tide, meaning that safety diversions were needed.
The work will mean that some access to the footpath and beach is limited, but Network Rail is working closely with the local authorities and community to minimise disruption.
Julian Burnell from Network Rail said: Many residents suggested this solution when we were dealing with the original damage in February and March. Now is the perfect time to raise the footpath and give the sea wall extra protection.
We need to complete this work before next winter, so we will need to work across the late summer and autumn. Weve been here long enough to know how important the tourist season is, so well be making sure we cause as little disruption as we can. Wherever we can we will be bringing in material by sea.
We are also meeting with local residents to discuss any concerns they may have. Were confident that we can maintain our excellent relationships with the people of Dawlish.
Anyone know if they are putting stone cladding on the new wall, not been down there for about 5 yrs but it looked from the piccies on here that the new wall was plain concrete.Mc Alpine would aprove but not Brunel, and I am sure English Heritage would not be happy
Sometimes the needs of the modern world override the need to preserve everything from the past. Robustness of the rail link to Devon and Cornwall is way more important than preserving a bit of stone wall. Yes I know, very unPC of me... That said I would be fairly certain that no doubt Network Rail will make the changes as sympathetically as possible. 
Anyone know if they are putting stone cladding on the new wall, not been down there for about 5 yrs but it looked from the piccies on here that the new wall was plain concrete.Mc Alpine would aprove but not Brunel, and I am sure English Heritage would not be happy
I can't help but feel this is one time where English Heritage should be told where to shove itSometimes the needs of the modern world override the need to preserve everything from the past. Robustness of the rail link to Devon and Cornwall is way more important than preserving a bit of stone wall. Yes I know, very unPC of me... That said I would be fairly certain that no doubt Network Rail will make the changes as sympathetically as possible.
![]()
Building an alternative to a major railway track destroyed in winter storms would be prohibitively expensive, the BBC understands.
The costs of alternatives to the coastal track at Dawlish in Devon were "eye-watering", said sources.
There's no point building it to be a proper mainline link that would be used by long-distance trains every day. A single track line with a passing loop or two would be more than sufficient
Well what was the point of reopening the Waverley? Surely that wasn't for diversion purposes.