The biggest issue is that where Hartford Station is presently sited (on a two track section) impairs the WCML capacity significantly every time a train is stopped there. This is probably the greatest impediment to the open access operators who wish to add Hartford to their services (notably between Blackpool and the South).
A small distance away and it is already quad tracked. The other and smaller benefits of relocation are numerous, but just that (smaller).
--- old post above --- --- new post below ---
It is 2 miles and 54 chains from Acton Bridge Station to Hartford Station.
Source:
Railway Clearing House distances between the stations and junctions of the railways of which the clearing system is in operation volume VI, published January 1884.
A small distance away and it is already quad tracked. The other and smaller benefits of relocation are numerous, but just that (smaller).
--- old post above --- --- new post below ---
You need a better measuring stick.Those distances you've given would put Hartford station north of Acton Bridge station! ...
It is 2 miles and 54 chains from Acton Bridge Station to Hartford Station.
Source:
Railway Clearing House distances between the stations and junctions of the railways of which the clearing system is in operation volume VI, published January 1884.