swt_passenger
Veteran Member
- Joined
- 7 Apr 2010
- Messages
- 34,287
I was at a meeting in Basingstoke attended by Stuart Palmer, who was SWT's MD back in about 2008, at which he referred to their plans to run some 10-coach trains from Salisbury into London. It was about the time they'd just acquired the eleven class 158s. But although the platforms were extended the lengthened trains didn't appear.
The reason was probably something to do with those DMU trains which run peak-hours diagrams from Basingstoke towards Southampton. I wonder if SWT were expecting to operate them with EMUs and then decided to use the EMUs on some other services.
I think the simple answer is yes, because the tender issued in April 2009 for significantly more EMUs (120-180 vehicles) should have allowed for internal cascades by about 2011/2 - all things being equal a greater number of 10 car services from Salisbury could have run by then.
As we now know, after many delays, that tender eventually turned into the ongoing 458/5 and 456 conversion projects. Even if they are all in service by next summer's timetable change, say April or May 2015, that will have been 6 years since the process began. The 10 car platform lengthening from Salisbury towards Basingstoke was underway in late 2008, but it was quite a while before even the single 10 car train ran.
Last edited: