The S&C reprieve anniversary got me thinking again about this.
Excluding the ECML through Selby, which was specifically replaced, what other lines could be described as really important, as opposed to obscure branch lines? ie Strategic through routes which carried main line trains.
I'm thinking...
Great Central main line
Waverley Line
Lincolnshire main line
Dumfries-Stranraer direct
Somerset & Dorset
Matlock-Buxton
Kirkham-Blackpool Central was one of the busiest to close...
Hard facts. Lines we need now.
Because of the politically motivated and poorly planned way in which the closure programme was carried out, there are unfortunately so
The problem with this scenario is that this same situation could have been played out on many of the lines put forward for retention in this thread - however all would have been loss making and the subsidy/investment/renewal jam spread thinner over more route mileage. This would probably have made the startling (compared to 60yrs ago) frequency improvements on many secondary services that currently remain all the more unlikely to have happened.
How many of these lines can't be reopened now or could be? In other words how much building over the lines has happened?
Sent from my Nexus 5 using Tapatalk
It could indeed, but then again, to make such a statement, we have to consider what has been driving the frequency improvements.
Overall, there hasn't been a set amount of funding to be stretched depending on whatever route mileage there happens to be. If anything, the decision to maintain "unprofitable" route mileage has been political, with the service (particularly in the franchised period) following. Certainly in the franchise period, funding seems to have in turn followed the service provision, rather than the other way round.
To look at it from another angle, if we'd have had another round of closures, say the Whitby branch, Settle - Carlisle, Heart of Wales etc, do you think we would have had the same amount of funding provided as at present, with the "saved" money being spent on surviving routes ? Personally, I think that's unlikely. Instead, services would have been decided for the surviving routes with funding provided largely to match.
In short, I think if Government and railway management had taken a decision to pursue rationalisation rather than closure sooner, we probably would have more routes, albeit singled, and we probably would be looking at ways of improving capacity on these lines (as with the SW line to Exeter). However, we would be in a much better position as a Country.
One thing that is clear: the political, social and economic environment has changed out of recognition since 1962! The railways were in financial crisis in 1962 and there was no appetite to provide funding to match the route mileage that was in operation then. Rationalisation costs money to implement, and that kind of investment money was not available at the time, partly because the remaining railway needed large quantities of money to modernise as well. It is an interesting thought (although completely useless) to contemplate what kind of funding level would be tolerated today (5 % larger network, 10%, 25% ???); or would we merely have lots of infrequent and slow (through deferred maintenance) services on both the lines which were shut and on the rest of the network which had insufficient money to modernise?
We also can't assume that an up to 25% bigger network will bring a proportional number of additional users. It may do of course.
Sent from my Nexus 5 using Tapatalk
How many of these lines can't be reopened now or could be? In other words how much building over the lines has happened?
Sent from my Nexus 5 using Tapatalk
What's become of the Leigh line track bed now?
Reading the discussion of how a choice at the time was for rationalisation, rather than closure, reminded me that these kind of works began on the York-Beverley route. I can't think where the source was at the moment, but I'm sure I recall that the first Automated level crossing trials took place on the line, and DMUs came early.
I wonder if that shows that local management considered the line a good prospect, as compared to the view taken by "head office"?
personally the day trains stopped on the croxley green branch line was a sad day.
other lines that closed - Northampton - Mkt Harborough - a mistake now one thinks
The first trials were in the approach road to Marylebone station goods yard, used only by BR vehicles and convenient for the Top Bananas from BR headquarters over the way at 222 Marylebone Road to nip over to see in action.York-Beverley route. I can't think where the source was at the moment, but I'm sure I recall that the first Automated level crossing trials took place on the line
The first trials were in the approach road to Marylebone station goods yard, used only by BR vehicles and convenient for the Top Bananas from BR headquarters over the way at 222 Marylebone Road to nip over to see in action.
Reading the discussion of how a choice at the time was for rationalisation, rather than closure, reminded me that these kind of works began on the York-Beverley route. I can't think where the source was at the moment, but I'm sure I recall that the first Automated level crossing trials took place on the line, and DMUs came early.
I wonder if that shows that local management considered the line a good prospect, as compared to the view taken by "head office"?
According to Martin Bairstow (Railways in East Yorkshire)
"... in 1953 the first continental style level crossing with lifting barriers was installed at Warthill."
He goes on to say that contracts were placed in 1960 for equipment that would have modernised all the level crossings on the line, but the scheme was abandoned in Feb 1962.
How many of these lines can't be reopened now or could be? In other words how much building over the lines has happened?
Sent from my Nexus 5 using Tapatalk
Whilst we're on the subject of Yarmouth, can anyone explain how it is that that there are still two routes between there and Norwich, one via Acle, the other via Berney Arms; it seems a bit extravagant considering that much of East Anglia was stripped of its railways. How is this justified?