how tight on headroom are the Merseyrail tunnels? Is there future scope for 25kV overhead rail electrification?
Another problem area for overhead wires are the steep drop into Green Lane Station into the cutting.
Another problem area for overhead wires are the steep drop into Green Lane Station into the cutting. With the reporting that the FCC 313's are to be replaced, I think it makes more and more sense to send them up here for electrification projects. Maybe even some for Northern Rail and they could even run services from Manchester to Southport, Ormskirk or Kirkby via Hunts Cross and Liverpool Central or even Manchester to Ellesmere Port, Chester, West Kirby or New Brighton via the stock interchange line![]()
Bringing us back on topic though, perhaps re-engineered D-stock could be a 'low cost' option for Merseyrail?![]()
That's actually quite a funky idea fair dos, D stock already cover long routes (Upminster to Richmond/Wimbledon/Ealing Broadway is quite a fair way!) so clearly they are fine for lengthy runs.
How much more life could be dragged out of D stock though? They are getting a bit old now (built 1978 IIRC) so I can't seem them lasting that long, re-engineered or not. Maybe 20 years, but would the cost of re-engineering the D stock to be replaced in 20 years afterwards at the most be worth it compared to replacing the 507s and 508s with brand new trains?
Well, there's the rub I suppose... I'm not sure what the details of the Harrogate proposal were (other than a promise to fit toilets!), or whether it was costed and researched or drawn up on the back of a fag-packet. But even now the D78s do seem far newer than they actually are, especially now they have paint on them, and no longer have wood-effect flooring and seats that match the Leyland Atlanteans I travelled on as a small child!
Bringing us back on topic though, perhaps re-engineered D-stock could be a 'low cost' option for Merseyrail?![]()
That's actually quite a funky idea fair dos, D stock already cover long routes (Upminster to Richmond/Wimbledon/Ealing Broadway is quite a fair way!) so clearly they are fine for lengthy runs.
How much more life could be dragged out of D stock though? They are getting a bit old now (built 1978 IIRC) so I can't seem them lasting that long, re-engineered or not. Maybe 20 years, but would the cost of re-engineering the D stock to be replaced in 20 years afterwards at the most be worth it compared to replacing the 507s and 508s with brand new trains?

No I'm sorry, some of the suggestions on this thread are silly, but this is just ludicrous.
Why re-engineer trains that are older than what we have and less suitable than what we have?
Sometimes people on here need to give their head a wobble.
Lord no, second worst LU stock ever - only beaten by similarly-designed (and thankfully long-scrapped) 1983 stock. The single-leaf doors might have made a bit of sense in a time of falling passenger numbers - but quite frankly are ridiculous for a busy metro service.As much as anything, it's just a shame that the D-stock will most likely be scrapped in a few years time when it certainly doesn't seem to be life-expired (though perhaps depot staff could correct me on this!) and even before the refurbishment was the best and most comfortable stock on the SSLs.
how tight on headroom are the Merseyrail tunnels? Is there future scope for 25kV overhead rail electrification?
The original tunnels were double track and built for steam, so I wouldn't have thought there would be any height problems there.
The 1970s single-track tunnels were built for 3rd rail and I don't know what the clearance situation is, but it looks "generous" to me.
The Moorfields-Central-St James tunnel on the Northern Line is fairly straight and re-uses some of the original Mersey Railway tunnel (now the stock interchange line from Central to James St).
The deep level Loop tunnel on the Wirral line does a 180-degree turn but the bends seem to me to be less pronounced than in some places on the original line (eg either side of Birkenhead Central).
The burrowing junction at Hamilton Square is also single-track.
I would have thought the first challenge is to accommodate full-size stock with a retracted pantograph (like the Thameslink Snow Hill tunnel).
I don't think anybody is contemplating stringing up the existing 3rd rail routes just yet.
I don't understand all the talk about conversions and overhead cables etc. Merseyrail works fine as it is, any extensions that are required, if ever they so happen to the network can be catered for by third rail.. Personally I can see the current trains being re-engineered, I presume if the 318 refurb program is a success, this will no doubt probably be a deciding factor. The problem is, as a network, Merseyrail works pretty well, and yes while the trains will need replacing, with the hard work put in, they still keep going, are relatively clean and alot of the time, run to schedule. Merseyrail will look to keep costs down if they can. New builds will cost a fortune in design costs alone, re-engineering whilst not ideal, will in effect enhance an already successful product, which can be added to when units down south come free again probably at a lower cost than a complete renewal. This is just my opinion and is probably far off the truth, but for far too long we in Liverpool have had grand ideas about what our rail network should be, when in reality nobody will stump up the cash to make this possible. The public perception and an enthusiast perception is very different and I wouldn't be surprised if many commuters think the new livery being applied, is actually a new train, hence why a rework is being mentioned. Public want reliable trains, and won't have a clue how old they are..
Not surprising, since the 313s and the 507/508s have exactly same body.Interesting I note from Wikipedia that 313003/005/013/063 were tested on the Northern Line back in the 1970's before the 507/508's were ordered implying the clearance in the new tunnels could be sufficient for them and other similar stock to operate on the network.
c) It's not just the power draw that makes OHLE preferable, but the fact that only ~2% of the energy going through the wires is wasted, as opposed to ~27% for third rail due to the increased surface area third rail has and the lower efficiency of high wattage DC vs. AC. Therefore it's wrong to assume it's cheaper to have third rail over time simply because maintenance costs are lower.
a) Merseyrail may want to extend over rails that NR will at some point want to electrify with 25kV AC (or over lines that already are). Dual voltage stock would be all very well, and I'm sure whatever replaces the current stock will have at least the provision for AC, but the point is that the stock will probably require it at some point.
Should definitely get more trains, the 507s and 508s were all rammed on the Northern line on Saturday. The Wirral line lot were also getting very busy by 1100 too. All 3-car trains too, made for some less than comfortable journeys. As did the lack of facilities on the 507s and 508s, especially when you've got lengthy waits at places like Little Sutton and Capenhurst which are unstaffed!
Next Thurs-Saturday will be far busier still on the Northern Line, especially if the weather is nice. It's usually 6 car trains on the regular Liverpool Central-Ormskirk line and a few extras as far as Aintree.
Anyone got any tips for Saturday by the way?![]()
According to the posters, there's services which call at Central, Moorfields and Aintree only, with a 7.5 minute frequency of trains calling there (obviously including the normal Ormskirk trains) during the Aintree festival.
Thankfully I'm nowhere near Aintree for it, and in all fairness I daresay the Northern line would have been far busier if Liverpool had been playing at home (or indeed Everton) with football passengers to/from Sandhills.
Do the FA not normally avoid any games at Anfield or Goodison on Grand National Saturday?
Yes whichever team has the home match that weekend usually plays on a Sunday or Monday night.