59CosG95
Established Member
No idea what Liverpool will get to replace the 507/508s, but maybe we could get a 3-coach 378 variant, the 388 RingoStarr?
the 388 RingoStarr?![]()
Bearing in mind the nature of the network, they might also offer something from their Movia range. (LU's S Stock is a Movia product.)I think maybe a 6 car Aventra would be good, I'm sure that's what a Bombardier bid would entail
S Stock cars are 15.5m long (17.5m for cars with driving cabs), so similar Movia trains would seem to be perfect for Merseyrail. I'm not sure about the need for them to be "built to mainline standards" though... what do you have in mind?The vehicles of the class 503 sets that ran on the Wirral line when the loop first opened were 17m rather than the 20m of the 507/508s (and admittedly the similar 502s). Something based on the S-stock (though built to mainline standards) would be a better idea IMHO...
If anything the DfT should only permit such a order to be undertaken on the grounds that the Class 313 fleet should be replaced first followed by a addon order to replace the Class 507/508 fleets this being due to the Class 313s being the oldest EMUs indeed oldest Multiple Units in passenger service.
S Stock cars are 15.5m long (17.5m for cars with driving cabs), so similar Movia trains would seem to be perfect for Merseyrail. I'm not sure about the need for them to be "built to mainline standards" though... what do you have in mind?
S Stock cars are 15.5m long (17.5m for cars with driving cabs), so similar Movia trains would seem to be perfect for Merseyrail. I'm not sure about the need for them to be "built to mainline standards" though... what do you have in mind?
Well, that might depend on a signalling upgrade: T&W Metro and heavy rail (including freight) happily (and safely) co-exist sharing tracks and there are a few proposals for tram-train operation on NR.Well, by "mainline standards" I was mostly meaning that they might need better crash resistance than is required on LUL, along with things like OTMR. A higher top speed for the Southport & Chester runs would probably be welcome too. Oh, and yeah dual voltage capability as stated above.
Well, by "mainline standards" I was mostly meaning that they might need better crash resistance than is required on LUL, along with things like OTMR. A higher top speed for the Southport & Chester runs would probably be welcome too. Oh, and yeah dual voltage capability as stated above.
They already share (LUL) tracks with Chiltern from Harrow to Amersham.Won't S-Stock run on Network Rail infra anyway, to Richmond?
The 313's are in a good condition, ten times better than South Eastern's 465/466 fleet
I was more meaning that as 'National Rail' stock there may be certain regulations and standards that the S-stock doesn't currently meet. It's not my area of expertise though, and as stated above, S-stock currently runs on NR lines anyway.
Well, by "mainline standards" I was mostly meaning that they might need better crash resistance than is required on LUL, along with things like OTMR. A higher top speed for the Southport & Chester runs would probably be welcome too. Oh, and yeah dual voltage capability as stated above.
I can't profess to having been on one for a couple of years, but they certainly don't look it on the outside... Are the 465s really that bad?
Apart from Hooton to Bache, the distances between stations are mostly too short for higher speed to be worthwhile - better acceleration capabilities would be more useful.
Agree up to a point, but it will also depend if and where the Merseyrail network is extended and if as a result the new trains will travel beyond the Merseytravel boundary. Extensions to Preston, Wigan, Warrington or Wrexham would increase the distances to be travelled making a higher turn of speed desirable especially on sections also used by "mainline" stock.
I know alot of people on The Kirkby - Wigan section would be very passionately opposed to Connection to the merseyrail network if this ever happened myself included and more actively looking for faster (Electric??) trains to Manchester maybe even a later service on the line. Only solution id accept is Dual voltage through trains to Liverpool.
The loadings headings towards Kirkby are pathetic in comparison to Wigan/Manchester bound sometimes can be 15/20x the volume.
I know alot of people on The Kirkby - Wigan section would be very passionately opposed to Connection to the merseyrail network if this ever happened myself included and more actively looking for faster (Electric??) trains to Manchester maybe even a later service on the line. Only solution id accept is Dual voltage through trains to Liverpool.
The loadings headings towards Kirkby are pathetic in comparison to Wigan/Manchester bound sometimes can be 15/20x the volume.
How about something like a class 377 and a class 378 combined? Both dual-voltage, good acceleration, maybe seating like a class 377?
And how much of the route do they actually run at 75mph?How long would it take for the Pacer's higher speed to allow it to make good its slow start compared to the S-stock's?
S Stock cars are 15.5m long (17.5m for cars with driving cabs), so similar Movia trains would seem to be perfect for Merseyrail. I'm not sure about the need for them to be "built to mainline standards" though... what do you have in mind?