Apologies for the rant, but why is it that Network Rail make such poor quality new buildings?
They seem to love platforms with no shelter, tiny lifts and generally extremely poorly thought out passenger flows. The new footbridge at East Croydon is always windswept and rain soaked, to the extent that the lifts are still not fully working after being deluged (they have been out of order now longer than they have been in service), and let's not forget the new platform at Gatwick, with it's open freezing cold design and single lift, totally unsuited to the vast number of people getting on and off there, destroying the old sensible passenger flow by forcing crowds of people back into the ticket hall (even though there is plenty of space for more facilities or for a connection to the other exit).
And, it looks like London Bridge is going the same way, replacing the old fully covering roof with silly little stylish canopies on an elevated site with very limited weather protection from the wind and rain. I know they are obsessed with preventing people staying on the platforms longer than they need to, but some of us actually have to wait for trains.
Other examples? The new platform at Cambridge, The freezing cold new deck at Reading, the westbound platform at Wokingham, Mitcham Eastfields, and these are just the ones on my South East patch...
They seem to love platforms with no shelter, tiny lifts and generally extremely poorly thought out passenger flows. The new footbridge at East Croydon is always windswept and rain soaked, to the extent that the lifts are still not fully working after being deluged (they have been out of order now longer than they have been in service), and let's not forget the new platform at Gatwick, with it's open freezing cold design and single lift, totally unsuited to the vast number of people getting on and off there, destroying the old sensible passenger flow by forcing crowds of people back into the ticket hall (even though there is plenty of space for more facilities or for a connection to the other exit).
And, it looks like London Bridge is going the same way, replacing the old fully covering roof with silly little stylish canopies on an elevated site with very limited weather protection from the wind and rain. I know they are obsessed with preventing people staying on the platforms longer than they need to, but some of us actually have to wait for trains.
Other examples? The new platform at Cambridge, The freezing cold new deck at Reading, the westbound platform at Wokingham, Mitcham Eastfields, and these are just the ones on my South East patch...