Yep, Kestrel was 4000HP. The point of the size of cooler groups in relation to loading gauge is a good one.
Have you seen the size of the arse end of an ES44AC?
And the AC6000, well I think we'd need a separate wagon coupled behind just to carry the cooler group!
Anyway, I digress. I think we've seen the last of anything from Progress Rail (EMD) or G.E in this country from now on. I think that's rather unfortunate as I don't see anything from the rest of Europe being a worthy alternative in the long term scheme of things.
Its a slippery slope from now on IMO.
I also don't think we should forget in a hurry that EMD locomotives have been exported to over 70 country's world wide since their inception in 1922 and
there's good reason for that.........
They're bloody good!
unfortunate as I don't see anything from the rest of Europe being a worthy alternative in the long term scheme of things.
Its a slippery slope from now on IMO.
I also don't think we should forget in a hurry that EMD locomotives have been exported to over 70 country's world wide since their inception in 1922 and
there's good reason for that.........
They're bloody good!
I think Kestrel was 4,000hp, it was a beast anyway. Problem iirc was that a certain percentage of power goes as waste heat and in the case of 4,000hp the UK loading gauge is not large enough to allow for the amount of heat exchanger's (radiators) required in a single locomotive design. I think it went to Russia where the lower ambient temperatures probably gave the loco a chance !.
Obviously that was years ago but I suspect there are still practicalities like this to consider. Even though things might be more efficient there is a law of physics somewhere in my brain that dictates a certain amount the power in an internal combustion engine HAS to go as heat.
66's are incredibly reliable and solid, they just don't break. Even when they are abused on trains that are way too heavy for them, they just keep going.
But the end of the 66 production line is great news, it is going to give the railway scene some variety that is so desperately needed. Plus, a lot more loco failures from the new unproven designs.
It is/was boring to see 66's at the head of nearly every diesel-hauled freight. They also had a rather poor sounding exhaust unless they were being thrashed in notch 8. They never failed which made every day more predictable.
We may now start to see more "micro fleets" on the freight scene as different operators try out different unproven designs, rather than 66 monotony. This has already given us an impressive variety of new DMU's & EMU's in the passenger sector, with all the different operators having "micro fleets" of various different units rather than one unit having a monopoly on everything. The freight scene could be heading the same way, rather than the yawn fest it has been where every new engine is a 66.
Unfortunately with railfreight unlikely to increase much (or at all) over the next 5 years & with virtually no outdated traction that needs replacing now, we may not see that many new loco designs coming over here unless more 66's get exported.
Was broken up some years ago too!
Today's whereabouts:-
70801 - Tinsley
70803 and 70805 - Eastleigh
70804 - Westbury
Tinsley as in Sheffield? What is it doing there?
But the end of the 66 production line is great news, it is going to give the railway scene some variety that is so desperately needed. Plus, a lot more loco failures from the new unproven designs.
It is/was boring to see 66's at the head of nearly every diesel-hauled freight. They also had a rather poor sounding exhaust unless they were being thrashed in notch 8. They never failed which made every day more predictable.
So having a single reliable design, with the efficiencies which that brings, is less important than seeing a range of haulage, even if that means more failures with the inevitable effect of delays and added cost to freight and passenger services?
So having a single reliable design, with the efficiencies which that brings, is less important than seeing a range of haulage, even if that means more failures with the inevitable effect of delays and added cost to freight and passenger services?
Don't forget maintaining them badly so that the engines sound hellfire.:roll:Yes because its not as interesting for spotters which lets face it are the main focus of the FOCs. ....
But the end of the 66 production line is great news, it is going to give the railway scene some variety that is so desperately needed. Plus, a lot more loco failures from the new unproven designs.
It is/was boring to see 66's at the head of nearly every diesel-hauled freight. They also had a rather poor sounding exhaust unless they were being thrashed in notch 8. They never failed which made every day more predictable.
Not Tinsley in Sheffield but a place called Tinsley Green (?) near Three Bridges. Perhaps someone with local knowledge of the area can confirm as TOPS says TINSLEYGN.
Persistent loco failures will eventually result in the loss of rail freight to the motorways. How on earth can this be seen as being a bonus?
a) I would not describe the 70s record as "persistent failures" anywayI never saw Freightliner suddenly lose loads of rail freight to the motorways when the Class 70 arrived on the scene with persistent failures ?
I think your exaggerating.
Have to agree with this.a) I would not describe the 70s record as "persistent failures" anyway
b) The clue is in the word "eventually". If the product you are offering is perceived as unreliable, you will lose business whatever business you are in. That is why the boringly reliable 66s are the standard entry-level new loco. However, it is also good business sense to build towards the future. FL took a batch of locos small enough not to cause major problems (including reputational) if it proved a complete failure - which it wasn't, but probably not good enough for their future plans
Have to agree with this.
Look what happened to mail on rail!
Im happy to be proved wrong but didn't RM get ****ed off with unreliability of rail whilst the industry struggled with worn out equipment like 47's etc.
I know its a little OT but I think that was atleast one of the problems IIRC.
Todays freight customer is very intolerant and sensitive of any delay / failure attributed to the hauliers equipment.
I never saw Freightliner suddenly lose loads of rail freight to the motorways when the Class 70 arrived on the scene with persistent failures ?
I think your exaggerating.
It appears that you would prefer loco failures at the expense of FOC performance. And yet you call yourself a rail enthusiast.