Hi All,
Anyone know what work they are doing to the platform (1 and 2) at New Southgate.
Loads of Concrete bags and metal frame bits pilled up on the old goods platform.
--- old post above --- --- new post below ---
-Update-
Spoke to a FCC guy and he said they are adding a fence between the fast and slow platforms.
There will be a fence down the middle of the platforms for health and safety reasons.
Not sure what will happen if your on platform 1 and the next train stops on platform 2
Anyone know what work they are doing to the platform (1 and 2) at New Southgate.
Loads of Concrete bags and metal frame bits pilled up on the old goods platform.
--- old post above --- --- new post below ---
-Update-
Spoke to a FCC guy and he said they are adding a fence between the fast and slow platforms.
There will be a fence down the middle of the platforms for health and safety reasons.
Not sure what will happen if your on platform 1 and the next train stops on platform 2