• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Virgin Trains to Shrewsbury

Status
Not open for further replies.
Joined
8 Jun 2006
Messages
622
Location
Hopton Heath
That's the answer - get Shropshire to become part of Wales !!

Well, in one sense we pretty much are with ATW covering most passenger services and stations!

I wouldn't mind if the Wales & Borders franchise was somehow controlled by the Welsh government - might be a positive thing.

But in all seriousness, the electrification of Shrewsbury - Wolverhampton really should be higher up NR's priorities. It would be a game changer not only for Shrewsbury - London services, but also Shrewsbury-Telford-West Midlands metro services.
--- old post above --- --- new post below ---
So what else would you suggest, since it is only 158's that are currently ERTMS equipped?

Well, not doing an Aberystwyth-London service, or - shock horror - fitting other trains (several managers at ATW/NR are now fainting) with ERTMS!

Frankly this ERTMS installing on the Shrewsbury-Aber line has really limited that line's usefulness... at least until ERTMS is rolled out elsewhere... which won't be the case for several decades, if ever...
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Eagle

Established Member
Joined
20 Feb 2011
Messages
7,106
Location
Leamingrad / Blanfrancisco
Well, in one sense we pretty much are with ATW covering most passenger services and stations!

In fact if Shropshire were transferred to the other side of the border then Wales would finally have a unified rail network for the first time since the 1960s.

I wouldn't mind if the Wales & Borders franchise was somehow controlled by the Welsh government - might be a positive thing.

It already partially is, although not to the extent that the Scottish Government regulates Scotrail.
 
Joined
8 Jun 2006
Messages
622
Location
Hopton Heath
In fact if Shropshire were transferred to the other side of the border then Wales would finally have a unified rail network for the first time since the 1960s.

Ish. I assume you mean connected via the HOWL? But actually that runs very slightly through Herefordshire (in 3 places) - I live near Hopton Heath and the Shropshire-Herefordshire border zig-zags over the line between here and Bucknell. :)
 
Last edited:

transmanche

Established Member
Joined
27 Feb 2011
Messages
6,021
That's the answer - get Shropshire to become part of Wales !!
Well I think when the border was drawn, it was done fairly arbitrarily. Much of the area around Oswestry was Welsh-speaking - and you can see evidence of that in many of the road and place names in the area. There's still even a Welsh chapel in the town.
 

jimm

Established Member
Joined
6 Apr 2012
Messages
5,276
Oh, what as surprise. I (and some others on here) were right all along. Rubbish timetable -> no passenger demand -> cancelled. All deliberate IMO. Virgin don't really have any intention of running trains to Shrewsbury. And Network Rail couldn't care less either.

Frankly there are only two scenarios for the future:

1. As now. No London trains from Shrewsbury.

2. Electrification of Shrewsbury-Wolverhampton and regular London trains.

Seeing that Network Rail don't have any proper plans to electrify the route, we're not going to get those London trains.

Problem with wiring to Shrewsbury is what do you do about all the services that run to and from points beyond Shrewsbury, such as the Cambrian coast and Chester via Wrexham, and for which through running to and from Wolverhampton and Birmingham (city and airport) is part of the package offered to passengers at the moment and, see below, is rather important.


Wrexham and Shropshire was a poor service because it took 4 hours to reach London. People preferred changing at Wolverhampton and travelling hi-speed on the new modern pendolinos rather than slow diesel hauled mkII carriages the long way round. In my opinion the only way the Shrewsbury service will work is if its re-instated the same way as it was when Virgin left it. I cant help thinking if they had not had dropped it then it sure would have still existed today.

W&S used Mk3s, not Mk2s. And through services had been dropped by BR in 1992 well before Virgin came on the scene, when Regional Railways restructured the timetable and launched a 158-operated service to make London connections at New Street - not Wolverhampton - on the basis that far more passengers were travelling between Mid Wales/Shropshire and Birmingham than ever did between Shropshire and London. As someone who lived in Wolverhampton at the time this seemed to me to be an entirely accurate summary of the situation.

The brief period when Virgin operated a couple of Shrewsbury through trains had more to do with their flair for publicity stunts than a genuine commitment. They lasted all of one year - 1998-99 - because, in financial terms, it didn't make sense, as BR had worked out previously.


I do not believe NR or VT had any intention of running it.

The plans for a regular service in the days of loco hauled were, I am told by a former Virgin Trains planner, 'deliberatly' made not to work.

The token one train a day each way was dropped under the cloud that was Guage Corner Cracking - in fact the delays caused by GCC had no effect at all on the ability to run the one a day Salop.

As for WSMR, again the paths were rubbish in a deliberate attempt to undermine the service.

I do love the way people try to rewrite history here. As I said above, the Virgin service ended in 1999, a year before Hatfield and gauge corner cracking. They had made a wooly commitment to explore the potential for a through service, or something like that, so were able to kill it off nice and quick.

The paths that W&S got were all that was available. The New Street to Wolverhampton line was full up before W&S started, which was why W&S went round the houses, and that situation hasn't changed since, hence the offer now of paths via Stafford. The only way to run direct on New Street-Wolverhampton is to operate in an existing path.

I don't think it did any such thing.

Chiltern attempted to use W&S to fulfil their franchise commitments, and were fined by DafT for breaching those franchise commitments as a result. The end result of that fine was that W&S was wound up and conveniently enough the stock was transferred to Chiltern.

W&S struggled because it had to take a slow route around Birmingham to avoid revenue abstraction, but I don't think it was ever the financial basket case that DB tried to imply after the event.

W&S made Virgin sit up to the extent that there is now a train every two hours to Chester and that Wrexham now has a direct train service to London.

I think Grand Central proved that, with the right paths, direct trains to smaller towns and cities- even on a slower route- will work. I fully expected Grand Central to bomb and they didn't. For that reason I don't think a few trains to Shropshire every day would bomb either.

W&S was an open access operator, Chiltern is a franchised operator. The rules, not unreasonably, say you can't mix the two up - HT and FGW can't share their 180s for that reason. Any DfT penalty was neither here nor there. If DB and Renaissance thought the operation had a viable long-term future as it stood, they would have stuck with it.

As I have already said, the paths W&S got were the ones that were available through the very busy tracks in the West Midlands, nowt to do with revenue abstraction - and W&S was launched by its backers in the full knowledge of the moderation of competition clause in Virgin's franchise.

GC is operating in a quite different environment and is worthless as any kind of comparison.

The key Shropshire flow is to and from Birmingham, which is why BR and its successors on the Shrewsbury route operate it the way they do. A limited London-Shrewsbury service could work but only if it is integrated into the structure of the West Coast operator's West Midlands timetable.
 
Last edited:

transmanche

Established Member
Joined
27 Feb 2011
Messages
6,021
Problem with wiring to Shrewsbury is what do you do about all the services that run to and from points beyond Shrewsbury, such as the Cambrian coast and Chester via Wrexham, and for which through running to and from Wolverhampton and Birmingham (city and airport) is part of the package offered to passengers at the moment and, see below, is rather important.
Not necessarily a huge problem; as it is ATW already run under the wires between Birmingham International and Wolverhampton en route to the Cambrian Coast and Chester - running under the wires all the way to Shrewsbury would only be an additional 30 miles or so.

And there's always the possibility of bi-mode trains in the distant future; like the AGC used by SNCF.
 

Eagle

Established Member
Joined
20 Feb 2011
Messages
7,106
Location
Leamingrad / Blanfrancisco
Not necessarily a huge problem; as it is ATW already run under the wires between Birmingham International and Wolverhampton en route to the Cambrian Coast and Chester - running under the wires all the way to Shrewsbury would only be an additional 30 miles or so.

So are you suggesting that an additional (electric) service runs to Shrewsbury, making 3tph between Birmingham and Shrewsbury; or, that the London to Shrewsbury service takes the place of the LM stopper, and presumably the local stops would be added to the ATW service?
 

transmanche

Established Member
Joined
27 Feb 2011
Messages
6,021
So are you suggesting that an additional (electric) service runs to Shrewsbury, making 3tph between Birmingham and Shrewsbury; or, that the London to Shrewsbury service takes the place of the LM stopper, and presumably the local stops would be added to the ATW service?
Er no. Just pointing out that diesel under the wires is nothing new...

But to answer your question, increasing from 2tph to 3tph doesn't sound impossible - but I don't know enough about traffic levels between Birmingham and Wolverhampton to know whether an additional 1tph is possible there.

Alternatively (similar to the suggestion elsewhere regarding services via Shrewsbury and Chester to/from the North Wales Coast) maybe Cambrian Coast/Chester services should be truncated at Shrewsbury for the 'greater good' and thus not delay electrification... <D
 
Last edited:

merlodlliw

Established Member
Joined
8 Mar 2009
Messages
5,852
Location
Wrexham/ Denbighshire /Flintshire triangle
Here is the pdf document on the ATW Aberystywth to London proposal.

I believe one objection to this proposal from Chiltern was the 90mph top speed of the class 158's would mean some of Chilterns services being held up following the ATW services.

Also I have to wonder if ATW could have resourced these 158's for this service had it gone ahead when they seem to struggle for stock now in fact this proposal shows that ATW do have the stock available to allow an hourly Cambrian service but funding is one reason why such a service is not happening yet.

I think a service from Aberystwyth to London would have been popular with students and tourists (as the new megabus service from Aberystwyth to London shows) but I am not sure whether or not I would like to do the full trip on a 158. Then again there are some who travel from Milford Haven to Manchester on a 158 and ATW's are not that bad with the recent refurbishment


,its all history now, but it was only a spoiler against W/S.

All the infos are lodged in RF archives. As you say where would ATW have got spare 158s to run this open access service.
 
Last edited:
Joined
8 Jun 2006
Messages
622
Location
Hopton Heath
Problem with wiring to Shrewsbury is what do you do about all the services that run to and from points beyond Shrewsbury, such as the Cambrian coast and Chester via Wrexham, and for which through running to and from Wolverhampton and Birmingham (city and airport) is part of the package offered to passengers at the moment and, see below, is rather important.

It's this sort of thinking which is why this country is so buggered. :roll:

The existing DMUs would run under the wires. Shock.

New EMUs would in time replace London Midland's DMUs on the Shrewsbury-Birmingham route. Shock horror.

Really, I do despair.
 

anthony263

Established Member
Joined
19 Aug 2008
Messages
6,892
Location
South Wales
I agree that in some cases I would rather have a dmu run under teh wires rather than loose a direct service.

A good example of this being the case are the Milford Haven/Carmarthen - Manchester & Cardiff - Portsmouth Hbr/Taunton services which could be cut back post electrification of the SWML. I think it would be a major mistake to cut these services especially since I do see any issue's running these services under the wires are they do provide good reliable links.

Swansea - Cardiff is going to have teh hourly service to lonodn worked by IEP along with a hourly swanline and half hourly Maesteg service post electrification along with a possible 2tph electric shuttle between Cardiff & Bristol TM both of which are good and could allow the diesel services to Taunton & Portsmouth be sped up between Cardiff & Bristol.

It is the same with the idea of wires Wolverhampton - Shrewsbury yes the electrics would replace the London Midland local services but at least that would free up a few 170's to go elsewhere
 

Gareth Marston

Established Member
Joined
26 Jun 2010
Messages
6,231
Location
Newtown Montgomeryshire
Er no. Just pointing out that diesel under the wires is nothing new...

But to answer your question, increasing from 2tph to 3tph doesn't sound impossible - but I don't know enough about traffic levels between Birmingham and Wolverhampton to know whether an additional 1tph is possible there.

Alternatively (similar to the suggestion elsewhere regarding services via Shrewsbury and Chester to/from the North Wales Coast) maybe Cambrian Coast/Chester services should be truncated at Shrewsbury for the 'greater good' and thus not delay electrification... <D

There were 3 tph between Wellington and Wolverhampton until the SRA forced it to be cut, the big issue for travellers on this corridor is that the 3/4 car DMU's that ATW and LM use struggle even in the off peak and there not evenly spread throughout the hour Shrewsbury departs are xx33 and xx47 and New St are xx05 and xx24.

An extra train from London will effectively be providing relief capacity between Birmingham and Shropshire aside from any through journeys to London., this is a big reason W&S failed as didn't provide extra capacity.

FYI the Cambrian to Birmingham and London and SE market is a number of times larger than the North Wales to Sourh Wales market, the stance being taken here in Mid Wales is that electrification to Shrewsbury is to welcomed and connections into London services at Shrewsbury are preferable however a small number of through trains per day between Birmingham and Mid Wales must be retained due to the size of the flow and concerns whether facilities at Shrewsbury station could cope with the volume of interchanges a complete split would entail.
 

transmanche

Established Member
Joined
27 Feb 2011
Messages
6,021
FYI the Cambrian to Birmingham and London and SE market is a number of times larger than the North Wales to Sourh Wales market
FYI, nobody mentioned the North Wales to South Wales market - so I fail to see its relevance here.
 

dannypye9999

Member
Joined
28 Jun 2013
Messages
392
I seriously cannot see the obsession with it having one. Why is it so essential? Middlesborough doesn't have one, Barnsley, Huddersfield, Barrow, Grimsby all don't have one why does it feel so left out.


I wouldn't consider Huddersfield to be in urgent need of a direct train. Turn up at the ticket office, buy a ticket to London and once on the platform you can board the next departing train in either direction and head towards your London connection. 4tph Leeds, 4tph to Manchester, plus a Sheffield stopper.

Its a bit like Bolton to London, frequent trains in either direction with a good connection at both ends.
 

jimm

Established Member
Joined
6 Apr 2012
Messages
5,276
Not necessarily a huge problem; as it is ATW already run under the wires between Birmingham International and Wolverhampton en route to the Cambrian Coast and Chester - running under the wires all the way to Shrewsbury would only be an additional 30 miles or so.

And there's always the possibility of bi-mode trains in the distant future; like the AGC used by SNCF.

Of course diesels under wires is nothing new but in the case of Wolverhampton-Shrewsbury, even if Pendolinos were able to use it, any such service would be sparse - you wouldn't suddenly get an hourly London service running. Even if the LM stoppers went to emu operation, effectively half the service - the ATW trains - would still be diesel, unless you cut them short at Shrewsbury and make everyone change trains there.

Doesn't sound like a great case for electrification or passenger satisfaction to me.

A regional bi-mode train is a long-term possibility but there's more wiring to do and a lot of dmus with plenty of miles left in them before we reach that point. Remember there are other possibilities for some routes, such as the new Bombardier Aventra design, offering an option for batteries, allowing operation off the wires.


It's this sort of thinking which is why this country is so buggered. :roll:

The existing DMUs would run under the wires. Shock.

New EMUs would in time replace London Midland's DMUs on the Shrewsbury-Birmingham route. Shock horror.

Really, I do despair.

Well I'll tell you what makes me despair. People making posts here along the lines of 'they should just do x, y and z' - see assorted threads about IEP/GW wiring.

As I said above, I lived in Wolverhampton during the period the current operating pattern was established, I also had strong links with South Shropshire and the Welshpool area and travelled up and down on trains in the West Midlands, Shropshire and Mid Wales in the 1980s and 1990s, so have plenty of local knowledge to draw on in taking the view I do.

You, and others, seem to want to wire a route on which half the service would continue be worked by diesels, unless, as some seem to suggest, it's quite alright to create carnage at Shrewsbury station by cutting off direct services from Wales to Birmingham most of the day, in order to have a London service.

A service for which Virgin has only ever shown any enthusiasm when bidding for franchises - 1990s and 2012 - or when there was the threat of competition - W&S - which says to me that, just like BR before it, that virgin does not believe there is some huge unfulfilled demand for travel to and from London.

Wiring might affect the sums to some degree but even in the 'glory' days of Intercity operating through to Shrewsbury, there was a train roughly every couple of hours. As far as I'm aware, the proposals made by Virgin and First Group during the West Coast franchise bidding didn't even offer that, never mind hourly London trains. Hardly justification for electrification.

If a London service does start, somehow, using diesel traction at first, running at times people may actually want to travel to and from London, and is packed to the doors all the way, so the frequency is stepped up, and when the 158s and 170s are nearing the end of the line, then you might start to look at wires.
 
Last edited:

Gareth Marston

Established Member
Joined
26 Jun 2010
Messages
6,231
Location
Newtown Montgomeryshire
Of course diesels under wires is nothing new but in the case of Wolverhampton-Shrewsbury, even if Pendolinos were able to use it, any such service would be sparse - you wouldn't suddenly get an hourly London service running. Even if the LM stoppers went to emu operation, effectively half the service - the ATW trains - would still be diesel, unless you cut them short at Shrewsbury and make everyone change trains there.

Doesn't sound like a great case for electrification or passenger satisfaction to me.

A regional bi-mode train is a long-term possibility but there's more wiring to do and a lot of dmus with plenty of miles left in them before we reach that point. Remember there are other possibilities for some routes, such as the new Bombardier Aventra design, offering an option for batteries, allowing operation off the wires.




Well I'll tell you what makes me despair. People making posts here along the lines of 'they should just do x, y and z' - see assorted threads about IEP/GW wiring.

As I said above, I lived in Wolverhampton during the period the current operating pattern was established, I also had strong links with South Shropshire and the Welshpool area and travelled up and down on trains in the West Midlands, Shropshire and Mid Wales in the 1980s and 1990s, so have plenty of local knowledge to draw on in taking the view I do.

You, and others, seem to want to wire a route on which half the service would continue be worked by diesels, unless, as some seem to suggest, it's quite alright to create carnage at Shrewsbury station by cutting off direct services from Wales to Birmingham most of the day, in order to have a London service.

A service for which Virgin has only ever shown any enthusiasm when bidding for franchises - 1990s and 2012 - or when there was the threat of competition - W&S - which says to me that, just like BR before it, that virgin does not believe there is some huge unfulfilled demand for travel to and from London.

Wiring might affect the sums to some degree but even in the 'glory' days of Intercity operating through to Shrewsbury, there was a train roughly every couple of hours. As far as I'm aware, the proposals made by Virgin and First Group during the West Coast franchise bidding didn't even offer that, never mind hourly London trains. Hardly justification for electrification.

If a London service does start, somehow, using diesel traction at first, running at times people may actually want to travel to and from London, and is packed to the doors all the way, so the frequency is stepped up, and when the 158s and 170s are nearing the end of the line, then you might start to look at wires.

Your relevant experience of the market appears to be 20 to 25 years old, demand for rail travel has significantly increased in recent years unless your saying that Shropshire has been set in aspic c1990?
--- old post above --- --- new post below ---
FYI, nobody mentioned the North Wales to South Wales market - so I fail to see its relevance here.

Surely there's a logic defying inconsistency here north to South Wales market proven to be small but plans for hourly direct trains, Cambrian to Birmingham and onto London several times the size but hell no need for any through trains at all.
 

Aictos

Established Member
Joined
28 Apr 2009
Messages
10,403
Let me explain my view on how services should be considered, if you have a regular clockface timetable connecting at a location between regional and long distance then there's no reason not to do so.

For example, if ATW had a clockface timetable which actually connected well with VT at International for example, okay it would mean a change of train but it would still be better then a though service simply because at the moment there ain't enough paths available.
 

Eagle

Established Member
Joined
20 Feb 2011
Messages
7,106
Location
Leamingrad / Blanfrancisco
But to answer your question, increasing from 2tph to 3tph doesn't sound impossible - but I don't know enough about traffic levels between Birmingham and Wolverhampton to know whether an additional 1tph is possible there.

Well Virgin have now vacated a path between Birmingham and Wolverhampton (taking it down from 10tph to 9tph), but I'm not sure if the path is actually still there, or whether the other services have been spread out a bit.
 

transmanche

Established Member
Joined
27 Feb 2011
Messages
6,021
FYI, nobody mentioned the North Wales to South Wales market - so I fail to see its relevance here.

Surely there's a logic defying inconsistency here north to South Wales market proven to be small but plans for hourly direct trains, Cambrian to Birmingham and onto London several times the size but hell no need for any through trains at all.
Not at all. Only you keep banging on about the 'North Wales to South Wales market' when it's been pointed out to you on so many occasions that those North Wales to South Wales trains serve a much larger market than simple end-to-end journeys; they also serve large numbers of intermediate journeys. So the North Wales to South Wales market has no relevance.

My earlier comment:
Alternatively (similar to the suggestion elsewhere regarding services via Shrewsbury and Chester to/from the North Wales Coast) maybe Cambrian Coast/Chester services should be truncated at Shrewsbury for the 'greater good' and thus not delay electrification... <D
was simply comparing that if through services are to be sacrificed in order to accelerate electrification; then the same might apply with services from Cambrian Coast/Chester to Birmingham International. (And it was clearly a tongue in cheek comment.)
 
Last edited:

Eagle

Established Member
Joined
20 Feb 2011
Messages
7,106
Location
Leamingrad / Blanfrancisco
If I ever make a forum bingo card, "Gareth Marston mentioning Cardiff to Holyhead services in a thread about something else" would definitely be one of the squares. :P
 

merlodlliw

Established Member
Joined
8 Mar 2009
Messages
5,852
Location
Wrexham/ Denbighshire /Flintshire triangle
If I ever make a forum bingo card, "Gareth Marston mentioning Cardiff to Holyhead services in a thread about something else" would definitely be one of the squares. :P

Gareth happens to use Shrewsbury trains both North & South on a daily basis,so is more aware of traffic flows more than most,with respect to those who dont use Shrewsbury on these forums.
 

transmanche

Established Member
Joined
27 Feb 2011
Messages
6,021
Gareth happens to use Shrewsbury trains both North & South on a daily basis,so is more aware of traffic flows more than most,with respect to those who dont use Shrewsbury on these forums.
That's as may be. But through traffic between North Wales and South Wales is not relevant to this thread.
 

jimm

Established Member
Joined
6 Apr 2012
Messages
5,276
Your relevant experience of the market appears to be 20 to 25 years old, demand for rail travel has significantly increased in recent years unless your saying that Shropshire has been set in aspic c1990?

Lived in Wolverhampton, then just over the boundary in Shropshire until 1998, continue to visit the area several times a year. Even use the trains on occasion, Craven Arms to Wrexham and back one day last November being a recent example.

So demand has increased? You don't say. It has in most places, but has the demand for travel between Shrewsbury, Telford and London soared enough to justify reinstating trains going past Birmingham and electrification of Wolverhampton-Shrewsbury, with the issues that raises for how the other services on the line are operated?

If so, you would think that Virgin Trains would have spotted it and done something about it. But as I said above, they have shown zero interest in the idea except in franchise bids or when W&S appeared.

It's easy to blame Network Rail for the current state of affairs but is Virgin really that bothered? Any pressure to do something seems to be coming from DfT, which is of course desperate to be seen to be doing something after the West Coast franchise fiasco.

Virgin has been running West Coast since 1997. It gave Shropshire trains one year and binned Blackpool trains in 2003, which says all you need to know about its view of both routes. Does anyone really imagine it would have bothered again with either destination if it had not had to go through the franchise contest?
 

Eagle

Established Member
Joined
20 Feb 2011
Messages
7,106
Location
Leamingrad / Blanfrancisco
Virgin has been running West Coast since 1997. It gave Shropshire trains one year and binned Blackpool trains in 2003, which says all you need to know about its view of both routes. Does anyone really imagine it would have bothered again with either destination if it had not had to go through the franchise contest?

Wasn't the loss of Blackpool services down to the DfT/SRA/whoever was in charge at the time, due to the upcoming WCML upgrade works?
 

jimm

Established Member
Joined
6 Apr 2012
Messages
5,276
Wasn't the loss of Blackpool services down to the DfT/SRA/whoever was in charge at the time, due to the upcoming WCML upgrade works?

Nothing stood in the way of Virgin reinstating them once the upgrade work was completed. They didn't.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,718
If/when Wolves - Shrewsbury gets wired the only bit Virgin will be biting NRs hand off for is the Oxley chord.
 

Baxenden Bank

Established Member
Joined
23 Oct 2013
Messages
4,759
Is part of the problem the fact that proposals overlay a new service on top of the existing service rather than replacing it. Thus higher costs without similar increases in revenue?

Wales and Shropshire services were additional. The proposed Virgin services would be additional. I can't recall the overall service level when BR ran every two hours to Shrewsbury.

For example, a London to Shrewsbury service could use existing Virgin paths as far as Wolverhampton and then replace (at different times) limited stop Arriva Trains paths to Shrewsbury. Or other combinations. I note the issue of Pendolinos / Voyagers and platform lengths, but such issues are not insurmountable

As discussed by many of the same people on a West Wales thread, however you arrange a service pattern / link services together, you will please some passengers and displease others. The ony solution is a single service which runs over every line, eventually serving every station in the land! A sort of Mega Buffer Puffer. :p

Is a direct service, every hour, really required from Mid Wales through to Wolverhampton, or Birmingham, or International or beyond? It may be desirable but is it necessary, outside of peak hours say? What proportion of passengers alight at Shrewsbury anyway, to go into town or catch other onward train services?

Would an Aberystwyth to Crewe service, with all the connections available there, be just as good an alternative?
 
Last edited:

Eagle

Established Member
Joined
20 Feb 2011
Messages
7,106
Location
Leamingrad / Blanfrancisco
Would an Aberystwyth to Crewe service, with all the connections available there, be just as good an alternative?

It's been suggested by a couple of people here that when the Cambrian goes hourly, the new services should extend to Crewe taking the place of the two-hourly stopper between Shrewsbury and Crewe.

Obviously with all those stops it might not be the fastest connection.
 

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,874
Location
East Anglia
I still find it odd that when I travel Shrewsbury to London I now go via Crewe. Seems odd to head North to go South when it used to be via West Mids. Euston to Crewe is such an excellent service these days & with a decent connection on the N&S it usually works very well indeed.
 
Status
Not open for further replies.

Top