anthony263
Established Member
Mind you - I personally think 313 "repatriation" from the coast and a thorough refurb of the existing fleet + some modest resignalling for now will do (there are 3 "home" signals missing in the tunnels which could , if replaced, bump the service headways up towards 18tph. Until ATO comes in eventually when the proper resignalling is done and the 313's shuffle of this mortal coil.
I think Souuthern transfering the class 313's to FCC once they get enough class 377/3's back from the London Metro routes has been suggested in fact on this forum a few months ago when we were talking about the new electrostars and where they would eventually end up