Ascot
Established Member
60 broke so awaiting for anything that Wembly kick out.
--- old post above --- --- new post below ---
Rolling 60m down.
--- old post above --- --- new post below ---
Rolling 60m down.
Don't understand you Ascot hehe. On a separate note, where does the 60 haul the train?
Ah okay, I understand now! Never knew about this 60, relatively outrageous! You should still have time to go on your dash, will update you nearer the time, seems to losing time at the moment though.
The 60 does NOT work all the way from Euston!
IIRC it's Crewe-Preston via Manchester.
Reason being a 67 isn't powerful enough to heat the whole train AND pull a full load. So the formation was planned to be 60+67+90+stock with the 67 and 60 being added at Crewe.
If you ask me this was a fix with some crank at Network who needed to clear his 60s.:roll:
![]()
You was at Crewe for 2 and a half hours??
A 60 is then topped on to the lot at Euston, and that is how the train runs to Preston
Diverted via Bescot, Crewe, Manchester, to Preston
As I understand last Sunday (yesterday) it was a 90 to Crewe and two 67s on the front and one on the rear from Crewe to Preston so no 60 haulage for anyone...